Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Jun 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.
The manpower required to complete a plan depends on the scope, complexity, and timeline of the project.
Manpower requirements can vary based on the size and complexity of the project.
Consider the skills and expertise needed for each task in the plan.
Factor in the timeline and deadlines for completing the plan.
Utilize project management tools to estimate manpower needs accurately.
Example: A large-scale construction proje...
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
I applied via AmbitionBox and was interviewed in Oct 2022. There were 2 interview rounds.
A control panel is a device that allows operators to control and monitor equipment or systems.
It is typically a flat, often vertical, area where control or monitoring instruments are mounted.
It can be found in various settings, such as industrial, commercial, and residential buildings.
Examples include the control panel for a heating and cooling system, a security system, or a manufacturing process.
It may include switch...
Effective work organization and scheduling (OSG) ensures maintenance tasks are completed efficiently and on time.
Prioritize tasks based on urgency and impact on operations.
Utilize maintenance management software for scheduling and tracking.
Implement preventive maintenance to reduce downtime, e.g., regular inspections.
Train staff on best practices for maintenance to enhance efficiency.
Conduct regular reviews of maintena...
I applied via Approached by Company and was interviewed before Jan 2022. There were 2 interview rounds.
Column and beam sizes are determined by the load they need to support and the span they need to cover.
The size of the column and beam is determined by the load they need to support and the span they need to cover.
The material used for the column and beam also affects their size.
The size of the column and beam can be calculated using structural engineering software.
For example, a 20-foot span with a load of 10,000 pound...
I will assess the severity of the void and determine the appropriate course of action.
Conduct a thorough inspection of the structure to determine the size and location of the void
Evaluate the potential impact of the void on the structural integrity of the building
Determine the appropriate repair method based on the severity of the void and the type of structure
Consult with structural engineers and other experts as need...
based on 1 interview experience
Difficulty level
Duration
based on 4 reviews
Rating in categories
Field Engineer
221
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Mechanical Engineer
162
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Electrical Engineer
94
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Inspection Engineer
80
salaries
| ₹2 L/yr - ₹8 L/yr |
Civil Engineer
54
salaries
| ₹3.1 L/yr - ₹7.2 L/yr |
Team Lease
Bonace Engineers
S2 Infotech
US Tech Solutions