A project is a temporary endeavor undertaken to create a unique product, service, or result.
Projects have defined objectives, scope, and resources.
They have a specific start and end date.
Projects are typically divided into phases or stages.
Examples: building a bridge, developing a software application, organizing an event.
Finishing work in a building should start after the structural work is completed and includes tasks like painting, tiling, and installing fixtures.
Start finishing work after structural work is completed to avoid damage to finishes during construction.
Coordinate with other trades to ensure finishing work can proceed smoothly.
Tasks involved in finishing work include painting, tiling, installing fixtures, and applying fin...
Concrete grade refers to the strength of the concrete mix in terms of the minimum compressive strength it can withstand after 28 days of curing.
Concrete grade is denoted by the M prefix followed by a number, such as M20, M30, etc.
The number in the concrete grade represents the compressive strength of the concrete in megapascals (MPa).
Higher concrete grades indicate higher strength and are typically used for structural ...
The cycle of slab involves various steps in the construction process.
Prepare the site for construction
Place the formwork for the slab
Pour the concrete mixture into the formwork
Allow the concrete to cure and set
Remove the formwork and finish the slab surface
Top trending discussions
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.
I applied via Walk-in
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
posted on 17 Sep 2022
Discussion about past career and overall life
Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.
Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.
Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.
Both steel and shuttering must be inspected regularly to ensure they a...
posted on 23 May 2024
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
based on 1 interview
Interview experience
Sales Manager
11
salaries
| ₹4.8 L/yr - ₹7.5 L/yr |
Sales Executive
5
salaries
| ₹3 L/yr - ₹7 L/yr |
Senior Executive
5
salaries
| ₹4.9 L/yr - ₹7.1 L/yr |
Assistant Sales Manager
4
salaries
| ₹4.6 L/yr - ₹7.5 L/yr |
Architect
4
salaries
| ₹7.8 L/yr - ₹11.7 L/yr |
Adani Group
Tata Group
Reliance Industries
Mahindra & Mahindra