i
Vihang Group
Filter interviews by
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
Concrete grade refers to the strength of the concrete mix, typically denoted by a number such as M20 or C30.
Concrete grade is a measure of the compressive strength of the concrete mix.
It is usually denoted by a number followed by the letter 'M' for mix design or 'C' for cylinder strength.
Higher grade numbers indicate higher strength concrete, achieved through a specific mix design and curing process.
For example, M20 co...
Maintaining quality involves setting clear standards, regular inspections, continuous training, and feedback mechanisms.
Set clear quality standards for all aspects of the project
Conduct regular inspections to ensure compliance with standards
Provide continuous training to employees to improve skills and knowledge
Implement feedback mechanisms to address any quality issues promptly
Working in safety involves following safety protocols, identifying hazards, and promoting a culture of safety.
Always wear appropriate personal protective equipment (PPE)
Follow safety protocols and procedures at all times
Identify potential hazards in the work environment and take necessary precautions
Promote a culture of safety by encouraging open communication about safety concerns
Participate in safety training and sta...
Maintaining quality involves setting clear standards, regular monitoring, continuous improvement, and effective communication.
Establish clear quality standards and guidelines
Regularly monitor and evaluate processes and outcomes
Implement continuous improvement initiatives
Ensure effective communication among team members and stakeholders
Section and elevation drawings of a bathroom
Include dimensions for all fixtures and fittings
Show the placement of plumbing lines and electrical outlets
Label materials and finishes for walls, floors, and fixtures
A leading engineering company specializing in innovative solutions for various industries.
Provides cutting-edge engineering solutions
Works with a wide range of industries such as automotive, aerospace, and technology
Focuses on research and development to stay ahead of the competition
Received positive feedback on technical skills and leadership abilities.
Received commendation for successfully leading a team in completing a major project ahead of schedule
Recognized for consistently providing innovative solutions to complex technical challenges
Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.
Cement density: 1440 kg/m3
Steel density: 7850 kg/m3
Fine aggregate density: 1600-1750 kg/m3
Coarse aggregate density: 1200-1750 kg/m3
The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.
Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm
Weight of the cube is usually around 29 kg
The cube is made of concrete from the same batch being tested
The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.
The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).
The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).
However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...
My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.
Continuously seek opportunities to learn and improve technical skills
Work on various projects to gain practical experience
Seek mentorship from experienced engineers
Stay updated with industry trends and technologies
Obtain relevant certifications to enhance credibility
Set specific career milestones to track progress
I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.
Leading and managing multiple projects simultaneously
Mentoring and training junior engineers
Implementing innovative technologies and practices
Collaborating with cross-functional teams for successful project delivery
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
posted on 23 May 2024
RCC structure is a reinforced concrete structure commonly used in construction.
RCC structures consist of concrete reinforced with steel bars for added strength
Common types of RCC structures include beams, columns, slabs, and walls
RCC structures are designed to withstand heavy loads and provide durability
Proper reinforcement detailing is crucial for the structural integrity of RCC structures
MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.
MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.
They are essential for coordinating the installation of these systems during construction.
MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...
A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.
Include pipes for both water supply and drainage systems
Show fittings such as elbows, tees, and couplings
Include fixtures like sinks, toilets, and showers
I applied via Walk-in
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
based on 1 interview
Interview experience
Sales Manager
10
salaries
| ₹4.8 L/yr - ₹7.5 L/yr |
Assistant Manager
6
salaries
| ₹7 L/yr - ₹9 L/yr |
Sales Executive
5
salaries
| ₹4 L/yr - ₹7 L/yr |
Senior Executive
5
salaries
| ₹4.9 L/yr - ₹7.1 L/yr |
Closing Manager
4
salaries
| ₹3 L/yr - ₹8.3 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
HM Group