I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 2 May 2021
posted on 16 Apr 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2018. There were 6 interview rounds.
posted on 14 Feb 2024
posted on 22 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.
Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.
Excavation is the process of removing soil and rocks to create space for the road.
Filling involves adding suitable materials like gravel or crushed stones to level the ground.
Compaction is essential to ensure the filled materials are tightly packed and stable.
Shaping the ground involves grad...
Descusosin of road concreting Massonary work
Discuss of site civil activities
posted on 14 Apr 2023
I applied via Company Website
I am a civil engineer with a passion for designing and constructing infrastructure projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including bridges, highways, and buildings.
I am skilled in using software like AutoCAD and Revit for designing structures.
I have experience in project management and ensuring projects are completed on time and with...
As a Civil Engineer, my responsibilities include designing, planning, and overseeing construction projects.
Designing and analyzing structures such as buildings, bridges, and roads
Preparing cost estimates and project schedules
Ensuring compliance with building codes and regulations
Supervising construction activities and managing contractors
Conducting site visits and inspections
Collaborating with architects, surveyors, an...
Answering questions related to project type, floor area, steel/shuttering/concrete quantity and de-shuttering periods.
Project type is commercial building with 10 floors
Floor area is 1000 sq. meters per floor
Steel quantity per floor is 50 tons, shuttering quantity is 1000 sq. meters and concrete quantity is 500 cubic meters
De-shuttering period for beams is 14 days, for columns is 21 days and for slab is 7 days
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
based on 1 review
Rating in categories
Assistant Manager
519
salaries
| ₹4.5 L/yr - ₹13 L/yr |
Manager
330
salaries
| ₹6.2 L/yr - ₹16.1 L/yr |
Senior Engineer
320
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Senior Manager
318
salaries
| ₹10 L/yr - ₹22.2 L/yr |
Consultant
194
salaries
| ₹3.9 L/yr - ₹13 L/yr |
Infosys
Wipro
HCLTech
Tech Mahindra