Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Tata Technologies Team. If you also belong to the team, you can get access from here

Tata Technologies Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Tata Technologies PLM Engineer Interview Questions and Answers

Updated 23 Aug 2022

Tata Technologies PLM Engineer Interview Experiences

1 interview found

PLM Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Aug 2022

I applied via Referral and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 

They included Aptitude and Technical Questions in 1st round.

Round 2 - Technical 

(1 Question)

  • Q1. I am from Mechanical Background so they asked me some Mechanical related questions like, 1)Difference between 2-stroke and 4 stroke engine? 2) What will does when we use petrol in diesel engine and Vice Ve...
Round 3 - HR 

(1 Question)

  • Q1. 1) Why we hire you? 2) Tell me something about company?

Interview Preparation Tips

Interview preparation tips for other job seekers - PLM is very vast. But if you choose your skill related activities then it is enjoyable.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is ph value of bentonite
  • Ans. 

    The pH value of bentonite typically ranges from 8 to 10.

    • Bentonite is a clay material commonly used in construction and engineering projects.

    • The pH value of bentonite can vary depending on its source and composition.

    • A pH value of 7 is considered neutral, so bentonite is slightly alkaline.

    • The pH value of bentonite is important in determining its suitability for various applications.

  • Answered by AI
  • Q2. What is mean fe500
  • Ans. 

    FE500 is a grade of steel used in construction, indicating its yield strength in megapascals.

    • FE500 is a designation for a type of steel reinforcement used in construction

    • The 'FE' stands for 'iron', while '500' indicates the minimum yield strength in megapascals

    • FE500 steel is commonly used in reinforced concrete structures for its high strength and durability

  • Answered by AI
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Questions related with sfd and bmd
  • Q2. What is main beam and secondary beam
  • Ans. 

    Main beam and secondary beam are structural elements used in construction to support loads and transfer them to the foundation.

    • Main beam is the primary horizontal beam that carries the load directly to the columns or walls.

    • Secondary beam is a beam that is supported by the main beam and helps distribute the load evenly.

    • Main beams are typically larger and stronger than secondary beams.

    • Examples: In a building, main beams ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Technical Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary Discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is copy monitor in Autodesk Revit?
  • Ans. 

    Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.

    • Copy monitor allows users to track changes in linked models and update them in the current model.

    • It helps maintain consistency between different models in a project.

    • Users can easily identify and resolve conflicts or discrepancies between linked models.

    • Copy monitor can be used for elements like g

  • Answered by AI
  • Q2. What is shared parameter?
  • Ans. 

    Shared parameter is a parameter that can be used across multiple elements in a project.

    • Shared parameters allow for consistent data across different elements in a project.

    • They can be created and managed in software like Revit for BIM projects.

    • Examples include shared parameters for material types, cost estimates, or project phases.

  • Answered by AI
  • Q3. What is the difference between import cad & link cad?
  • Ans. 

    Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.

    • Import CAD creates a duplicate of the CAD file within the project, increasing file size.

    • Link CAD maintains a connection to the original CAD file, allowing for real-time updates.

    • Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.

    • Import CAD...

  • Answered by AI
  • Q4. What is Building Information Modelling?
  • Ans. 

    Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.

    • BIM is a collaborative process that allows multiple stakeholders to work together on a building project.

    • It involves creating and managing digital representations of the physical and functional characteristics of a building.

    • BIM helps in improving coordination, efficiency, and accuracy in the desi...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. General question about me.

Interview Preparation Tips

Interview preparation tips for other job seekers - If are a expert on Revit & Structural Modeler then you should know about very well Revit & you have to strong at Technical skill also.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Past experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What should be the height of Tremie pipe from pile founding level during concrete?
  • Ans. 

    The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

    • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

    • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

    • Adjustment...

  • Answered by AI
  • Q2. Which all codes are used for structure engineering ?
  • Ans. 

    Various codes are used in structural engineering to ensure safety and compliance with regulations.

    • International Building Code (IBC)

    • American Society of Civil Engineers (ASCE) standards

    • American Concrete Institute (ACI) standards

    • American Institute of Steel Construction (AISC) standards

    • Eurocode

    • National Building Code of Canada (NBCC)

  • Answered by AI
  • Q3. What is the role of bearings in Bridges?
  • Ans. 

    Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

    • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

    • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

    • Different types of bearings include elastomeric bearings, pot bearings, and slid...

  • Answered by AI
  • Q4. Which formula is used to calculate the elongation of PSC Girder?
  • Ans. 

    The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

    • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

    • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

    • The change in length is the difference between the original length and the length...

  • Answered by AI
  • Q5. What is the Process of Making PSC Girder?
  • Ans. 

    The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

    • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

    • Pour the mix into a formwork that is designed to the shape and size of the girder.

    • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

    • Cure the girder by m...

  • Answered by AI
  • Q6. What is socketing length in Pile?
  • Ans. 

    Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

    • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

    • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

    • Socketing length can vary depending on the site c...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Why do you want to leave your previous Job?
  • Q2. Are you ready to relocate ?
  • Q3. How much salary do you expect?
  • Q4. Tell me am Example when you did Team Work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for the answer like your Job change decision with strong reason. And before appearing any Interview, Read all the notes , which all you prepared Earlier. And one more thing, read about the topic for which you have applied specially and about the company as well.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Value addition to Company
Round 3 - Technical 

(3 Questions)

  • Q1. Repair & Maintenance of Heavy Earth Moving Equipments related
  • Q2. Basic Hydraulic System functioning of Equipments, Explanation
  • Ans. 

    Hydraulic systems use fluids to transmit power and control movement in equipment.

    • Hydraulic systems use a pump to pressurize fluid, which is then distributed through hoses and valves to actuators that move the equipment.

    • The fluid is typically oil or water-based and is stored in a reservoir.

    • Hydraulic systems are commonly used in heavy equipment such as excavators, cranes, and bulldozers.

    • They are also used in aircraft lan...

  • Answered by AI
  • Q3. Trouble Shooting along with fault detection at site and site Report preparation afterwards
  • Ans. 

    I have extensive experience in trouble shooting and fault detection at site, and preparing site reports afterwards.

    • I have a strong understanding of the equipment and systems being used on site

    • I am able to quickly identify and diagnose issues, and develop effective solutions

    • I am skilled in preparing detailed site reports that accurately document the issue and the steps taken to resolve it

    • I am able to communicate effecti...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic questions for interviews whether Technical or General along with presentation. Be confident and presentable, while answering.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. C programming related questions and embedded related basic questions
  • Q2. Project description and details

Interview Preparation Tips

Interview preparation tips for other job seekers - Should have good knowledge of projects that has been done

Tata Technologies Interview FAQs

How many rounds are there in Tata Technologies PLM Engineer interview?
Tata Technologies interview process usually has 3 rounds. The most common rounds in the Tata Technologies interview process are Aptitude Test, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
LTIMindtree Interview Questions
3.8
 • 2.9k Interviews
Mphasis Interview Questions
3.4
 • 788 Interviews
View all
Tata Technologies PLM Engineer Salary
based on 9 salaries
₹4.4 L/yr - ₹10.7 L/yr
31% more than the average PLM Engineer Salary in India
View more details

Tata Technologies PLM Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Senior Design Engineer
2.3k salaries
unlock blur

₹5.2 L/yr - ₹16.2 L/yr

Design Engineer
2.1k salaries
unlock blur

₹2.4 L/yr - ₹10.2 L/yr

Technical Lead
1.7k salaries
unlock blur

₹6.5 L/yr - ₹23 L/yr

Solution Developer
1.6k salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Team Lead
630 salaries
unlock blur

₹6.9 L/yr - ₹23 L/yr

Explore more salaries
Compare Tata Technologies with

KPIT Technologies

3.4
Compare

L&T Technology Services

3.3
Compare

Cyient

3.6
Compare

Tech Mahindra

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview