Copy monitor in Autodesk Revit is a tool used to monitor changes in linked models and synchronize them with the current model.
Copy monitor allows users to track changes in linked models and update them in the current model.
It helps maintain consistency between different models in a project.
Users can easily identify and resolve conflicts or discrepancies between linked models.
Copy monitor can be used for elements like g
Shared parameter is a parameter that can be used across multiple elements in a project.
Shared parameters allow for consistent data across different elements in a project.
They can be created and managed in software like Revit for BIM projects.
Examples include shared parameters for material types, cost estimates, or project phases.
Import CAD brings a copy of the CAD file into the current project, while Link CAD creates a reference to the original CAD file.
Import CAD creates a duplicate of the CAD file within the project, increasing file size.
Link CAD maintains a connection to the original CAD file, allowing for real-time updates.
Changes made to the original CAD file will reflect in the linked CAD file, but not in the imported CAD file.
Import CAD...
Building Information Modelling (BIM) is a digital representation of the physical and functional characteristics of a building.
BIM is a collaborative process that allows multiple stakeholders to work together on a building project.
It involves creating and managing digital representations of the physical and functional characteristics of a building.
BIM helps in improving coordination, efficiency, and accuracy in the desi...
Top trending discussions
I am excited to join TCE because of its reputation for innovative design and commitment to sustainability.
TCE's portfolio showcases a range of impressive projects that demonstrate their expertise in engineering and design.
I am particularly drawn to TCE's focus on sustainability and their efforts to incorporate eco-friendly solutions into their designs.
I am also impressed by TCE's commitment to innovation and their use ...
I applied via Referral and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via LinkedIn and was interviewed in Feb 2023. There were 2 interview rounds.
LOD stages in BIM refer to the Level of Development which defines the amount of detail and accuracy of a model at different stages of a project.
LOD 100: Conceptual design with basic massing and spatial relationships
LOD 200: Generalized elements with approximate quantities, size, shape, location, and orientation
LOD 300: Specific elements with accurate quantities, size, shape, location, and orientation
LOD 400: Detailed e...
I applied via Bechtel Website and was interviewed before May 2022. There were 2 interview rounds.
Forces in a truss structure can be identified by analyzing the external loads and internal member forces.
External loads such as weight, wind, and seismic forces create tension and compression forces in the truss members.
Internal member forces can be calculated using the method of joints or method of sections.
Examples of forces include axial, shear, and bending forces.
The forces must be balanced for the truss to remain
Stability checks for foundation ensure the safety and durability of the structure.
Stability checks involve analyzing the soil type, bearing capacity, and settlement potential.
Designing the foundation based on the load-bearing capacity of the soil.
Performing structural analysis to ensure the foundation can withstand the loads imposed on it.
Checking for potential differential settlement and ensuring it is within acceptab...
posted on 28 May 2023
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
I have recently worked on designing and analyzing the structural integrity of a high-rise building and a suspension bridge.
Designed and analyzed the structural integrity of a 50-story high-rise building in downtown area
Conducted a feasibility study and provided recommendations for a suspension bridge project over a river
Collaborated with architects and contractors to ensure compliance with building codes and safety sta...
I recently worked on the design and construction of a new office building.
Conducted site analysis and feasibility studies
Developed structural design plans and calculations
Coordinated with architects and contractors throughout construction process
Performed regular site visits to ensure adherence to design specifications
Completed project on time and within budget
Connection design of beam to beam involves selecting appropriate fasteners and designing the connection to transfer loads safely.
Select appropriate fasteners such as bolts, screws, or welds based on the loads and type of connection.
Design the connection to transfer loads safely and efficiently.
Consider factors such as shear, bending, and torsion when designing the connection.
Ensure that the connection is durable and ca...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Design Engineer
272
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Bechtel
Fluor Corporation
Worley