Upload Button Icon Add office photos

Tata Steel

Compare button icon Compare button icon Compare
4.1

based on 6.9k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Steel ml engineer Interview Questions and Answers

Updated 14 Oct 2023

Tata Steel ml engineer Interview Experiences

1 interview found

ml engineer Interview Questions & Answers

user image Anonymous

posted on 14 Oct 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain ur projects
  • Ans. 

    I have worked on projects involving natural language processing, computer vision, and recommendation systems.

    • Developed a sentiment analysis model using NLP techniques like TF-IDF and LSTM

    • Implemented a facial recognition system using OpenCV and deep learning algorithms

    • Built a movie recommendation system based on collaborative filtering

  • Answered by AI
  • Q2. Introduce urself
  • Ans. 

    I am a machine learning engineer with a background in computer science and a passion for developing innovative AI solutions.

    • Completed a Master's degree in Computer Science with a focus on machine learning

    • Worked on projects involving natural language processing, computer vision, and predictive modeling

    • Proficient in programming languages such as Python, Java, and R

    • Experience with popular machine learning frameworks like ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice do it

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is thermocouple
  • Q2. What is rtd

Interview Preparation Tips

Interview preparation tips for other job seekers - questions asked-
1. What is RTD?
2.What is thermocouple?
3.What is plc?
4.What is DCS
5.Def of Isolator
6.what is flow transmitter?
7.what is orifice
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to know if Hydraulic cylinder leakage
  • Ans. 

    Check for hydraulic cylinder leakage by inspecting for oil puddles, decreased performance, and abnormal noises.

    • Inspect the area around the hydraulic cylinder for oil puddles or stains

    • Monitor the performance of the hydraulic system for any decrease in efficiency

    • Listen for any abnormal noises coming from the hydraulic cylinder during operation

  • Answered by AI
  • Q2. What is NAS
  • Ans. 

    NAS stands for Network Attached Storage, which is a type of storage device that connects to a network to provide shared storage space.

    • NAS devices are typically used for storing and sharing files, data backups, and media streaming within a network.

    • NAS devices can be accessed by multiple users and devices simultaneously over a network.

    • NAS devices often have their own operating system and can run various applications such...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well about your work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 4 interview rounds.

Round 1 - Group Discussion 

Gearbox and fluid coupling replacement work and development

Round 2 - Assignment 

Senior manager and manager and all employees job description for growth and development

Round 3 - Case Study 

Cash study in machanical engineering decision making thermodynamics fluid machanics and heat transfer

Round 4 - HR 

(11 Questions)

  • Q1. Gear box replacement work safely first and all ppes sure and paper work and try out checking and saving and job work clean and fresh and tackup up and clamping conveyer belt old gear box replacement for ne...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out sure and teckup up and clamping conveyer belt and plummer block top cover open Barring checking and remov...
  • Q3. Conveyer belt pmi roller checking work and safety first and all ppes sure and paper work and walked away clean and fresh and Roller cut marking frem number and belt tracking and belt close and try out sure...
  • Q4. Barring greasing work and safety first and all ppes sure and paper work and conveyer belt running and walked away clean and fresh and grease gun and greasing work
  • Q5. Conveyer belt panching work and safety first and all ppes sure and paper work and try out same position and solution and hardner bad mixed mad belt panching work
  • Q6. Conveyer belt chute replacement work and safety first and all ppes sure and paper work and try out and jobs walked away clean and fresh and same chute replace and tightening bolt and machine welding and fi...
  • Q7. Conveyer belt v-scraper replacement work and safety first and all ppes sure and paper work belt close and try out and walked away from clean and fresh and same v -scraper making and replacement work
  • Q8. Gear box old oil replacement work and safety first and all ppes sure and paper work and belt close and try out and walked away clean and fresh and oil gauge and checking and drain oil and Aw320 oil replac...
  • Q9. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out lockout and tagout (loto) safety procedure and fuse plug and open west oil remove and new aw46oil replacem...
  • Q10. Drive pmi work and safety first and all ppes sure and paper work and try out ofter walked away clean and fresh and bass bolt nut tightening work
  • Q11. Gear box cleaning work and safety first and all ppes sure and paper work and walked away clean and fresh and ty out sure and clean and fresh and same process paper work cancelled and conveyer belt running...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Process of production
  • Q2. Final production process

Interview Preparation Tips

Topics to prepare for JSW Group Mechanical Engineer interview:
  • Hot Forging
  • Technical Support
  • Testing Tools
  • Production Planning
  • ERP
Interview preparation tips for other job seekers - take interview one on one offline or online ,as per candidate experience u can select it.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

Normal question based on steel manufacturing.

Round 2 - Technical 

(2 Questions)

  • Q1. All about DCV, PRV, and Hydraulic.
  • Q2. Miscellaneous question about Hydraulic and steps involved in manufacturing of steel, no of panels and their function etc.
Round 3 - Technical 

(2 Questions)

  • Q1. In detail of the hydraulic system.
  • Q2. Function of each equipment and their application in steel plant.
  • Ans. 

    Equipment in a steel plant have specific functions like melting, shaping, and cooling metal to produce various steel products.

    • Blast furnace - melts iron ore to produce molten iron

    • Electric arc furnace - uses electricity to melt scrap metal and produce steel

    • Rolling mill - shapes the molten metal into various forms like sheets, bars, or beams

    • Cooling bed - cools down the hot steel products after shaping process

    • Annealing fu...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. Provide details about company
  • Q2. Salary and post discussion and negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - The job profile is good and well but as per the name service engineer is very hectic for daily work. In Service engineer role they expect that we are always ready 24X7 for the customer so family life spoils.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Instrument ,PLC qus ,networking
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Electrical department
  • Q2. What is MCC PCC PANEL
  • Ans. 

    MCC stands for Motor Control Center and PCC stands for Power Control Center. They are electrical panels used to control and distribute power to motors and other electrical equipment.

    • MCC panels are used to control and distribute power to motors in industrial settings.

    • PCC panels are used to control and distribute power to various electrical equipment.

    • Both panels play a crucial role in ensuring efficient and safe operatio...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. 7Qc tools, 5S, TPM, Kaizen, Root cause, Quality Parameters, SAP Management, Incoming Quality tools
Round 2 - Technical 

(1 Question)

  • Q1. TPM , 7Qc tools, CAPA
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Strength or weakness

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn to grow

Tata Steel Interview FAQs

How many rounds are there in Tata Steel ml engineer interview?
Tata Steel interview process usually has 2 rounds. The most common rounds in the Tata Steel interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Tata Steel ml engineer interview?

Some of the top questions asked at the Tata Steel ml engineer interview -

  1. Explain ur proje...read more
  2. Introduce urs...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Tata Steel interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

JSW Steel Interview Questions
3.9
 • 563 Interviews
Jindal Stainless Interview Questions
4.2
 • 197 Interviews
JSW Group Interview Questions
3.9
 • 105 Interviews
Jindal Saw Interview Questions
4.0
 • 97 Interviews
Rashmi Metaliks Interview Questions
3.5
 • 75 Interviews
Viraj Profiles Interview Questions
3.8
 • 71 Interviews
View all

Tata Steel ml engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-Life balance

4.0

Salary & Benefits

5.0

Job Security

4.0

Company culture

3.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Manager
1.6k salaries
unlock blur

₹6 L/yr - ₹21 L/yr

Assistant Manager
1.4k salaries
unlock blur

₹5.2 L/yr - ₹15.8 L/yr

Senior Manager
1.2k salaries
unlock blur

₹9.1 L/yr - ₹35 L/yr

Junior Engineer
897 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Engineer
843 salaries
unlock blur

₹2.2 L/yr - ₹11 L/yr

Explore more salaries
Compare Tata Steel with

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Vedanta Limited

3.9
Compare

ArcelorMittal Nippon Steel

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview