Top Bhushan Power & Steel Interview Questions and Answers

View all 55 questions

Bhushan Power & Steel Interview Experiences

Popular Designations

49 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Group Discussion 

Work experience in which field

Round 2 - One-on-one 

(2 Questions)

  • Q1. Salary expected how much
  • Q2. Nearest joining date possibility

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)

Senior Foreman Interview Questions & Answers

user image Munna Singh

posted on 12 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. Induction furnace eot crane
  • Ans. Induction furnace maintenance stand by crusible all general chaking
  • Answered by Munna Singh
  • Q2. Eot crane preventive maintenance shutdown work and all general chaking
  • Ans. Eot crane preventive maintenance Chaking oil level in thruster Chaking of wire rope condition Oil level in gear box Break setting chaking of wire rope lubrication Chaking gear coupling nut 🔩 bolt lt & ct main host rail & structure chaking proper house keeping wanted meterial all beating greasing Shutdown work planing Main host wire rope change .and rail and structure work
  • Answered Anonymously
  • Q3. Cooling tower maintenance and preventive maintenance shutdown work
  • Q4. Furnace coil cooling water pump preventive maintenance shutdown work
  • Ans. Chaking of unwanted noise and vibration Chaking bearing condition Chaking of shaft alignment and clearance Suction and discharge pressure Bearing lubrication level Corrosion and Dirt chaking
  • Answered by Munna Singh
  • Q5. Hydraulic power pack system maintenance
  • Q6. All main power work distribution
  • Ans. 

    Main power work distribution involves managing the distribution of electrical power throughout a construction site.

    • Coordinate with electricians to ensure proper installation and maintenance of power distribution systems

    • Monitor power usage and troubleshoot any issues that arise

    • Ensure compliance with safety regulations and protocols

    • Plan for future power needs and upgrades

    • Examples: overseeing the installation of temporary...

  • Answered by AI

Senior Foreman Interview Questions asked at other Companies

Q1. What is the mathed lap lenth of rebar
View answer (1)
Bhushan Power & Steel Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. All control wireing and power wireing all dcs plc work going on
  • Q2. Automation rooling mill division jamshedpur
Round 2 - One-on-one 

(2 Questions)

  • Q1. I am electrical engineer working on it and found in the same as par required production okay for me to get the same as the motor is overloaded due to the machine running ok but
  • Q2. Automation work
Round 3 - Case Study 

I am electrical engineer working on it jamshedpur jharkhand steel strips wheel limited jamshedpur jharkhand

Diploma Electrical Engineer Interview Questions asked at other Companies

Q1. What is the use of star delta connection in electrical ?
View answer (3)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Project in BE ?
  • Ans. 

    Designed and implemented a smart irrigation system using IoT technology for efficient water usage.

    • Researched IoT technology and its applications in agriculture

    • Developed a system to monitor soil moisture levels and weather conditions

    • Implemented automated watering based on real-time data

    • Conducted field tests to validate system performance

  • Answered by AI
  • Q2. Transformer efficiency
  • Ans. 

    Transformer efficiency is the ratio of output power to input power, indicating how well the transformer converts electrical energy.

    • Efficiency is calculated as output power divided by input power, multiplied by 100%.

    • Efficiency is affected by factors such as core losses, copper losses, and load conditions.

    • For example, a transformer with an efficiency of 95% converts 95% of the input power into output power.

    • Efficiency can...

  • Answered by AI

Management Trainee Interview Questions asked at other Companies

Q1. What do you mean by balance sheet reconciliation could you explain briefly?
View answer (44)

Bhushan Power & Steel interview questions for popular designations

 Deputy General Manager Operations

 (4)

 Engineer

 (3)

 Management Trainee

 (3)

 Senior Engineer

 (3)

 Electrical Engineer

 (2)

 Assistant Engineer

 (1)

 Assistant Manager

 (1)

 Assistant Manager Finance & Accounts

 (1)

AGM(Oxygen Plant) Interview Questions & Answers

user image Anonymous

posted on 19 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. About behaviour
  • Q2. About plant technical
  • Q3. Normal question behaviour with colique.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be always cool mind during interview

Get interview-ready with Top Bhushan Power & Steel Interview Questions

Senior Engineer Interview Questions & Answers

user image mohit dutta

posted on 14 Aug 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Instrument ,PLC qus ,networking

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Ptm all parts Reapair
  • Q2. Bearing, Neumatic cyclender
  • Q3. Hydrolic cyclender
  • Q4. Wheel reapair, Gear box

Interview Preparation Tips

Interview preparation tips for other job seekers - Name- Susanta naik
At-Dulesara Dist- Jharsuguda
Mob-XXXXX
*****

Maintenance Fitter Interview Questions asked at other Companies

Q1. What is the potential risk that repair and maintenance work usually face?
View answer (4)

Mecha engineer Interview Questions & Answers

user image Anonymous

posted on 13 Apr 2024

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

I have mostly exprence about project job Strtural feb/erection and various types of service piping fitup and placement or commissioning work done. Raw materials handling system operation maintainc work done

Round 2 - One-on-one 

(1 Question)

  • Q1. Projects question/opration/maintanc of RMHS conveyrior systems

Interview Preparation Tips

Topics to prepare for Bhushan Power & Steel Mecha engineer interview:
  • Operations
  • Conveyrior

DGM Operations Interview Questions & Answers

user image Ramakant Sahu

posted on 21 Feb 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Ask about regular job assignment.
  • Q2. Erection, Commissioning and Testing of Steel Plants

Interview Preparation Tips

Topics to prepare for Bhushan Power & Steel DGM Operations interview:
  • Project Management

DGM Operations Interview Questions asked at other Companies

Q1. How do you plan to do the mold manufacturing process.
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Details asking of my self background & work station process to be clear.
  • Q2. From managment given details for company & working process details given to me.
  • Q3. And last interview attentent with company's director sir, & final.

Interview Preparation Tips

Interview preparation tips for other job seekers - To be honest, sincerely working, hardworking & proud to be disspleane manner to behave.

Field Officer Interview Questions asked at other Companies

Q1. What is a tractor, from where the word tractor originated, What is horsepower, what models come in sonalika, what is PTO, drawbar, hitch, implements used with tractor
View answer (3)
Contribute & help others!
anonymous
You can choose to be anonymous

Bhushan Power & Steel Interview FAQs

How many rounds are there in Bhushan Power & Steel interview?
Bhushan Power & Steel interview process usually has 1-2 rounds. The most common rounds in the Bhushan Power & Steel interview process are Technical, Resume Shortlist and HR.
How to prepare for Bhushan Power & Steel interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Bhushan Power & Steel. The most common topics and skills that interviewers at Bhushan Power & Steel expect are Communication Management, Corporate Communication, Accounting, Accounts Closing and Bank Reconciliation.
What are the top questions asked in Bhushan Power & Steel interview?

Some of the top questions asked at the Bhushan Power & Steel interview -

  1. How does it effluent water treatment, it likes to drinking wat...read more
  2. types of heat treatment, difference between normalizing and annealing, what is...read more
  3. What is impedance voltage of transform...read more
How long is the Bhushan Power & Steel interview process?

The duration of Bhushan Power & Steel interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

INTERVIEWS

Boeing

85 interviews

INTERVIEWS

Apexon

135 interviews

INTERVIEWS

Xogene

8 interviews

INTERVIEWS

OpenBet

3 interviews

INTERVIEWS

ABB

233 interviews

INTERVIEWS

Carwale

No Interviews

INTERVIEWS

TCS

No Interviews

INTERVIEWS

Sciative Solutions

No Interviews

INTERVIEWS

MakeMyTrip

No Interviews

INTERVIEWS

Salesforce

No Interviews

Tell us how to improve this page.

Bhushan Power & Steel Interview Process

based on 50 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 836 Interviews
JSW Steel Interview Questions
3.9
 • 582 Interviews
Adani Power Interview Questions
3.9
 • 216 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Vedanta Limited Interview Questions
3.8
 • 46 Interviews
ArcelorMittal Interview Questions
4.1
 • 29 Interviews
View all

Bhushan Power & Steel Reviews and Ratings

based on 1.2k reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.5

Salary

3.7

Job security

3.6

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 1.2k Reviews and Ratings
Engineer
360 salaries
unlock blur

₹2.6 L/yr - ₹7.5 L/yr

Senior Engineer
323 salaries
unlock blur

₹3 L/yr - ₹9.3 L/yr

Assistant Engineer
249 salaries
unlock blur

₹2.2 L/yr - ₹7 L/yr

Assistant Manager
194 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Mechanical Engineer
122 salaries
unlock blur

₹2.5 L/yr - ₹7.4 L/yr

Explore more salaries
Compare Bhushan Power & Steel with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent