i
Shyam Steel Industries
Filter interviews by
Top trending discussions
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
posted on 7 Jul 2017
I appeared for an interview in Jul 2017.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
To apply for JSW Steel Plant, visit their official website and look for job openings. Submit your resume and application online.
Visit JSW Steel Plant's official website
Look for job openings and requirements
Submit your resume and application online
Prepare for interviews and assessments
I applied via Naukri.com and was interviewed in Oct 2019. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jun 2020. There was 1 interview round.
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
posted on 13 Jul 2021
I applied via Referral and was interviewed in Jan 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Sales Officer
86
salaries
| ₹1 L/yr - ₹6 L/yr |
Executive Accountant
85
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Assistant Manager
77
salaries
| ₹3 L/yr - ₹10 L/yr |
Area Sales Manager
53
salaries
| ₹4.1 L/yr - ₹12.9 L/yr |
Marketing Executive
51
salaries
| ₹2 L/yr - ₹4.2 L/yr |
JSW Steel
Jindal Steel and Power
ArcelorMittal Nippon Steel
Jindal Stainless