Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Shyam Steel Industries Team. If you also belong to the team, you can get access from here

Shyam Steel Industries Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Shyam Steel Industries Assistant Manager Interview Questions and Answers

Updated 19 Mar 2023

Shyam Steel Industries Assistant Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What kind of product costing are you made?
  • Ans. 

    I have experience in both job order and process costing methods.

    • I am familiar with job order costing, which involves assigning costs to specific jobs or orders based on materials, labor, and overhead costs.

    • I also have experience with process costing, which involves averaging costs across a large number of identical units produced in a continuous process.

    • I have used various costing techniques such as standard costing, a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper knowledge of your previous job profile, excel knowledge required advance excel knowledge

Assistant Manager Jobs at Shyam Steel Industries

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. All details about DRI600(Direct Reduced Iron Plant) Project with DRI project management and specialist team ,and HR
  • Q2. Others technical matter about civil engineering Project. etc.
  • Q3. Structural details about DRI Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Need totally deep technical knowledge about your experience .
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Definition and Analysis of Listed Company
  • Ans. 

    A listed company is a publicly traded company whose shares are traded on a stock exchange.

    • Listed companies must adhere to strict regulations and reporting requirements set by the stock exchange.

    • Investors can buy and sell shares of listed companies on the stock exchange.

    • Listed companies often have a higher level of transparency and accountability compared to private companies.

    • Examples of listed companies include Apple I

  • Answered by AI
  • Q2. Secretarial Compliances requirement for Listed Company
  • Ans. 

    Secretarial compliances for a listed company include adherence to regulations set by stock exchanges and regulatory bodies.

    • Regular submission of financial reports and disclosures to stock exchanges

    • Compliance with SEBI regulations and guidelines

    • Conducting board meetings within specified time frames

    • Maintaining proper records and registers as per Companies Act

    • Ensuring timely communication with shareholders and investors

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have good base of Concepts
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and paper work c...
  • Q2. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q3. Conveyor belt roller replacement work and safety first and paper work and walked away clean and fresh and try out and fream number mark and cut roller remove and shifting and walked away clean and fresh an...
  • Q4. Conveyor belt all pully greasing and saving work and safety first and paper work and walked away clean and fresh and all pully checking and saving greasing gun and all' pully greasing done and paper work c...
  • Q5. Barring checking and saving work and safety first and paper work and walked away clean and fresh and try out blumber block top cover open and old slue barring remove and new slue barring replace and bolt n...
  • Q6. Gear Box replacement wor and paper work Safety first and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening Sure and dayal guage eliminate process ok and p...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Asked technical details about Rolling Mill
  • Q2. About Project work
Round 2 - HR 

(2 Questions)

  • Q1. Asked about rolling mill process
  • Q2. Asked about Engineering
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

Aptitude + Core + Psychology Test

Round 2 - Group Discussion 

Trending topics , abstract topics, Anything.

Round 3 - Technical 

(3 Questions)

  • Q1. About Yourself, your family, core engineering subjects.
  • Q2. Projects & Internships written in your resume.
  • Q3. Depends upon their mood
Round 4 - HR 

(4 Questions)

  • Q1. General HR, questions, Why should we hire u?
  • Q2. Where do u see yourself in 5 yrs from now
  • Q3. How bad do u want this job opportunity, what you will be bring in to the table for us,
  • Q4. They told me its a core engineering job, will u be able to adapt to the environment!!

Interview Preparation Tips

Interview preparation tips for other job seekers - For a fresher, it all will revolve about your Core Engg subjects (basic to intermediate), Projects written in your resume, Some general questions about your interests.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Are you a qualified ca or not?
Round 2 - Aptitude Test 

General questions related to job profile

Round 3 - Technical 

(1 Question)

  • Q1. Question related to direct tax amendments

Assistant Manager Interview Questions & Answers

Jindal Saw user image vikas kumar Kesharwani

posted on 17 Feb 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Instrument related questions
  • Q2. Instrument related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice job and work culture

Assistant Manager Interview Questions & Answers

SHYAM METALICS AND ENERGY user image Bitupon Gogoi (The Runaway Lad)

posted on 5 Jul 2024

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Sales target planning with road map for month in advance

Round 2 - HR 
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

HOD Technical and Major Achivement

Round 3 - HR 

(2 Questions)

  • Q1. Work Experience and CTC
  • Q2. Experience, knowledge and Background details

Shyam Steel Industries Interview FAQs

How many rounds are there in Shyam Steel Industries Assistant Manager interview?
Shyam Steel Industries interview process usually has 2 rounds. The most common rounds in the Shyam Steel Industries interview process are Resume Shortlist and One-on-one Round.
How to prepare for Shyam Steel Industries Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shyam Steel Industries. The most common topics and skills that interviewers at Shyam Steel Industries expect are Capsules, Government Projects, Government Sales, Institutional Sales and Metro.

Tell us how to improve this page.

Shyam Steel Industries Assistant Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Fast track your campus placements

View all
Shyam Steel Industries Assistant Manager Salary
based on 80 salaries
₹3 L/yr - ₹10 L/yr
30% less than the average Assistant Manager Salary in India
View more details

Shyam Steel Industries Assistant Manager Reviews and Ratings

based on 17 reviews

3.2/5

Rating in categories

2.4

Skill development

2.5

Work-life balance

2.7

Salary

2.8

Job security

2.4

Company culture

2.5

Promotions

2.8

Work satisfaction

Explore 17 Reviews and Ratings
AM / DM - Project Sales

Raipur

3-8 Yrs

₹ 6-15 LPA

AM / DM - Project Sales

Raipur

3-8 Yrs

₹ 6-15 LPA

AM / DM - Project Sales

Kolkata

3-8 Yrs

₹ 6-15 LPA

Explore more jobs
Sales Officer
82 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Executive Accountant
81 salaries
unlock blur

₹2 L/yr - ₹5.6 L/yr

Assistant Manager
80 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Marketing Executive
51 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Area Sales Manager
50 salaries
unlock blur

₹4.5 L/yr - ₹14 L/yr

Explore more salaries
Compare Shyam Steel Industries with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview