I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
Upon arrival of building materials at site, testing should be conducted to ensure quality and compliance with standards.
Inspect the materials for any visible defects or damages
Conduct necessary tests such as compressive strength test for concrete, moisture content test for wood, etc.
Ensure that the materials meet the required standards and specifications
Document the test results and keep records for future reference
Rej...
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 2 May 2021
posted on 16 Apr 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2018. There were 6 interview rounds.
posted on 14 Feb 2024
posted on 1 Aug 2024
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.
As usual simple question.
Software test like ms office suit ad auto cad.
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
They ask question on SFD AND BMD
posted on 22 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Company Website
I am a civil engineer with a passion for designing and constructing infrastructure projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including bridges, highways, and buildings.
I am skilled in using software like AutoCAD and Revit for designing structures.
I have experience in project management and ensuring projects are completed on time and with...
As a Civil Engineer, my responsibilities include designing, planning, and overseeing construction projects.
Designing and analyzing structures such as buildings, bridges, and roads
Preparing cost estimates and project schedules
Ensuring compliance with building codes and regulations
Supervising construction activities and managing contractors
Conducting site visits and inspections
Collaborating with architects, surveyors, an...
Answering questions related to project type, floor area, steel/shuttering/concrete quantity and de-shuttering periods.
Project type is commercial building with 10 floors
Floor area is 1000 sq. meters per floor
Steel quantity per floor is 50 tons, shuttering quantity is 1000 sq. meters and concrete quantity is 500 cubic meters
De-shuttering period for beams is 14 days, for columns is 21 days and for slab is 7 days
based on 6 reviews
Rating in categories
Deputy Manager
1.1k
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Assistant Manager
709
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
389
salaries
| ₹8 L/yr - ₹24.1 L/yr |
Senior Engineer
389
salaries
| ₹3.5 L/yr - ₹13.5 L/yr |
Senior Manager
347
salaries
| ₹12 L/yr - ₹32.5 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company