Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterling & Wilson Interview Questions, Process, and Tips

Updated 3 Mar 2025

Top Sterling & Wilson Interview Questions and Answers

View all 72 questions

Sterling & Wilson Interview Experiences

Popular Designations

65 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI

Senior Civil Site Engineer Interview Questions asked at other Companies

Q1. B) What is PH value of water for Concrete of Construction ??
View answer (2)

Supervisor Interview Questions & Answers

user image Viral Padhiyar

posted on 26 Sep 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. My Work Experience
  • Q2. My Work Experience Yer

Interview Preparation Tips

Interview preparation tips for other job seekers - No

Supervisor Interview Questions asked at other Companies

Q1. Self introduction? & what is mean by eCommerce ? How it can do
View answer (10)
Sterling & Wilson Interview Questions and Answers for Freshers
illustration image
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the difference between control module and relay module
  • Ans. 

    A control module is a device that manages and regulates the operation of a system, while a relay module is a device that controls the flow of electrical current.

    • Control modules are responsible for monitoring and adjusting various parameters in a system, such as temperature, pressure, or speed.

    • Relay modules act as switches that open or close circuits to control the flow of electrical current.

    • Control modules are typicall...

  • Answered by AI
  • Q2. What is system architecture of FAS,BMS systems
  • Ans. 

    The system architecture of FAS (Fire Alarm System) and BMS (Building Management System) involves the integration of various components and subsystems to ensure efficient monitoring and control of fire safety and building operations.

    • FAS system architecture typically includes fire detectors, control panels, notification devices, and communication interfaces.

    • BMS system architecture typically includes sensors, controllers,...

  • Answered by AI
  • Q3. How to calculate BOQ quantity for FAS system
  • Ans. 

    BOQ quantity for FAS system can be calculated by determining the required components and their quantities.

    • Identify the components needed for the FAS system

    • Determine the quantity of each component required based on project specifications

    • Consider factors such as system size, layout, and design requirements

    • Calculate the total quantity by summing up the quantities of all components

    • Example: If the FAS system requires 10 smo...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Senior Design Engineer interview:
  • Fire Alarm System
  • Access Control System
  • Building Management System
  • Vesda
Interview preparation tips for other job seekers - Please check regarding salary date and time of salary as it a bad experience due to salary delay of most of the employees

Senior Design Engineer Interview Questions asked at other Companies

Q1. Noise, Vibration, and Harshness (NVH) in gearboxes are influenced by several factors, which can broadly be categorized into design, material, manufacturing, and operational factors. Here are some key factors affecting NVH in gearboxes: ### ... read more
View answer (1)

Team Manager Interview Questions & Answers

user image Anonymous

posted on 24 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Normal based on cv
Round 2 - One-on-one 

(1 Question)

  • Q1. Regarding contract

Team Manager Interview Questions asked at other Companies

Q1. To maintain SIEM solution which are the daily activities that you will perform?
View answer (4)

Sterling & Wilson interview questions for popular designations

 Electrical Engineer

 (4)

 Project Manager

 (2)

 Graduate Engineer Trainee (Get)

 (2)

 Civil Site Engineer

 (2)

 Management Trainee

 (1)

 Engineer

 (1)

 Senior Engineer

 (1)

 Manager

 (1)

HR Manager Interview Questions & Answers

user image Anonymous

posted on 5 Nov 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. About the role and achievements

HR Manager Interview Questions asked at other Companies

Q1. Can you explain the meaning of performance Management as stated in your CV
View answer (5)

Get interview-ready with Top Sterling & Wilson Interview Questions

Quality Engineer Interview Questions & Answers

user image Vijay kumar sharma

posted on 12 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Bricks type and brick water absorption capacity
  • Q2. Quality lab and site test of concrete
  • Ans. 

    Quality lab and site test of concrete involves testing the strength, durability, and consistency of concrete samples.

    • Quality lab tests include compressive strength test, slump test, air content test, and temperature test.

    • Site tests involve sampling concrete from the construction site, conducting field tests like slump test and air content test, and monitoring curing conditions.

    • Quality engineers ensure that concrete mee...

  • Answered by AI
  • Q3. Pile foundation test, rebound hummer, uv test
  • Q4. Silt content test
  • Q5. Aggregate test flakiness and elongation test

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Jobs at Sterling & Wilson

View all
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
-
Result
No response

I was interviewed in Aug 2024.

Round 1 - HR 

(1 Question)

  • Q1. What is your work experience in the renewable energy sector?
  • Ans. 

    I have 5 years of work experience in the renewable energy sector.

    • Managed procurement of solar panels and wind turbines for multiple projects

    • Negotiated contracts with suppliers to ensure cost-effectiveness

    • Implemented strategies to increase efficiency and sustainability in energy production

    • Collaborated with engineering teams to optimize equipment selection for renewable energy systems

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Experiencing ghosting following an interview is frustrating.

Purchase Engineer Interview Questions asked at other Companies

Q1. If yes, explain what a P2P cycle?
View answer (3)

Civil Site Engineer Interview Questions & Answers

user image Krishan Kumar Pandey

posted on 12 Mar 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and experience
Round 3 - Technical 

(4 Questions)

  • Q1. Chiller trouble shooting
  • Q2. Work of cchiller
  • Ans. 

    A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.

    • Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.

    • They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.

    • Chillers can be water-cooled or air-cooled, depending on the app

  • Answered by AI
  • Q3. Alarm and solutions
  • Q4. Controlling andetc
Round 4 - Group Discussion 

Salary and job responsibilities

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Basic information
  • Q2. Solar power plant
  • Q3. Solar fileds ke bare me
  • Q4. Solar ke bare me jankari
Round 2 - HR 

(2 Questions)

  • Q1. Solar power plant
  • Q2. Solar fileds ke bare me
Contribute & help others!
anonymous
You can choose to be anonymous

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson interview?
Sterling & Wilson interview process usually has 1-2 rounds. The most common rounds in the Sterling & Wilson interview process are Technical, Resume Shortlist and HR.
How to prepare for Sterling & Wilson interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Design Engineering, Project Management, HVAC, Solar and AutoCAD.
What are the top questions asked in Sterling & Wilson interview?

Some of the top questions asked at the Sterling & Wilson interview -

  1. Why neutral is Grounded in star connected transform...read more
  2. What is safety ? What is factory act ? What is you working process in construct...read more
  3. What is the relation between line voltage and phase voltage in Star connecti...read more
How long is the Sterling & Wilson interview process?

The duration of Sterling & Wilson interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

INTERVIEWS

BGR Energy Systems

No Interviews

DESIGNATION

INTERVIEWS

GE Transportation

No Interviews

COMPANY BENEFITS

Aerens Gold Souk International

No Benefits

INTERVIEWS

Varun Industries

No Interviews

Tell us how to improve this page.

Sterling & Wilson Interview Process

based on 49 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 418 Interviews
Thermax Limited Interview Questions
4.1
 • 251 Interviews
ABB Interview Questions
4.1
 • 235 Interviews
Havells Interview Questions
4.0
 • 209 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
View all

Sterling & Wilson Reviews and Ratings

based on 1.6k reviews

4.1/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.7

Salary

3.8

Job security

3.9

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 1.6k Reviews and Ratings
Compliance Manager

Thane,

Navi Mumbai

+1

10-15 Yrs

Not Disclosed

Administration Manager

Thane,

Navi Mumbai

+1

10-15 Yrs

Not Disclosed

Company Secretary

Thane,

Navi Mumbai

+1

2-5 Yrs

Not Disclosed

Explore more jobs
Electrical Engineer
270 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
246 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
235 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
165 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
137 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview