i
Sterling & Wilson
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
Quality lab and site test of concrete involves testing the strength, durability, and consistency of concrete samples.
Quality lab tests include compressive strength test, slump test, air content test, and temperature test.
Site tests involve sampling concrete from the construction site, conducting field tests like slump test and air content test, and monitoring curing conditions.
Quality engineers ensure that concrete mee...
Top trending discussions
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.
IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies
IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines
Aerators are devices used to add air into water or other liquids to increase oxygen levels.
Surface aerators
Submersible aerators
Diffused aerators
Mechanical aerators
Aspirating aerators
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 30 Nov 2023
I appeared for an interview before Nov 2022.
posted on 3 May 2023
Slump test is a method to measure the workability of concrete by observing the consistency and flow of the concrete mix.
Prepare a slump cone by lubricating the inside surface and placing it on a smooth, flat surface.
Fill the cone with concrete in three layers, each layer tamped with a rod 25 times.
Remove excess concrete, level the top, and lift the cone vertically. Measure the slump of the concrete.
Record the slump mea...
To fill a cube, ensure all sides are properly aligned and filled with the material. Check for any gaps or air pockets.
Ensure the cube mold is clean and dry before filling.
Pour the material into the mold slowly and evenly to prevent air pockets.
Use a vibrating table to help settle the material and remove any air bubbles.
Check for any leaks or cracks in the mold before filling to prevent material from leaking out.
After f...
posted on 22 Feb 2022
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 24 Apr 2024
Water treatment process involves several steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove particles
Sedimentation to settle out solids
Filtration to remove remaining particles
Disinfection to kill bacteria and viruses
pH adjustment to control acidity or alkalinity
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Senior Engineer
239
salaries
| ₹3.2 L/yr - ₹9.1 L/yr |
Project Engineer
198
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Electrical Engineer
187
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Assistant Manager
185
salaries
| ₹4.2 L/yr - ₹15.5 L/yr |
Deputy Manager
146
salaries
| ₹5.7 L/yr - ₹22 L/yr |
Simplex Infrastructures
Aarvee Associates
Nasser S. Al Hajri Corporation
Ramky Infrastructure