I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
To execute a task, you need to plan, organize, and implement the necessary steps.
Understand the task requirements and objectives
Break down the task into smaller, manageable steps
Create a timeline and set deadlines
Allocate resources and gather necessary materials
Assign responsibilities to team members
Monitor progress and make adjustments as needed
Complete the task within the given timeframe
Evaluate the results and learn
Top trending discussions
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.
posted on 23 May 2024
I applied via Walk-in
posted on 6 Mar 2024
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
Interview experience
Civil Site Engineer
17
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Senior Engineer
12
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Junior Engineer
11
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Quantity Surveyor
11
salaries
| ₹2 L/yr - ₹6 L/yr |
Accountant
8
salaries
| ₹3.2 L/yr - ₹3.8 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties