Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare
3.3

based on 2k Reviews

Filter interviews by

Simplex Infrastructures Senior Assistant Engineer Interview Questions and Answers

Updated 31 Jul 2023

Simplex Infrastructures Senior Assistant Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About 275 meter tall Chokhey and Slip form Technology
  • Q2. Operation of Slipform Technology
  • Ans. 

    Slipform technology is a construction method used to continuously pour concrete to form a continuous, seamless structure.

    • Slipform technology involves a formwork system that moves vertically and horizontally to create a smooth concrete surface.

    • It is commonly used in the construction of tall structures such as towers, bridges, and silos.

    • The process allows for efficient and cost-effective construction by eliminating the n...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. About Chimney Structure Details
  • Q2. Ability to work as a Chimney Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself as a Technical Engineer

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Field Experience
  • Q2. Testing Methodology

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewees must have good knowledge on their past experiences as most of the questions were generally asked from the gained experiences from the past field. Apart from this a good technical knowledge on the basic aspects of civil engineering a one must have such as surveying testing and processes of construction and the steps involved in the execution work etc
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical profile related questions working experience wise quality
Round 3 - HR 

(1 Question)

  • Q1. Document verification sallary bank statement sallary discussion
Round 4 - Behavioral 

(1 Question)

  • Q1. Know about you and work education femily and other
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. What are the steps involved in preparing the budget for a project?
  • Ans. 

    Steps involved in preparing a project budget

    • Identify all project expenses including labor, materials, equipment, etc.

    • Estimate the cost of each expense item based on historical data or quotes from vendors

    • Allocate funds for unexpected costs or contingencies

    • Determine the timeline for the project and spread out costs accordingly

    • Review and finalize the budget with key stakeholders

  • Answered by AI
  • Q2. What factors are considered in the costing of projects?
  • Ans. 

    Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.

    • Materials: Cost of raw materials needed for the project.

    • Labor: Cost of labor required to complete the project.

    • Overhead: Indirect costs such as utilities, rent, and administrative expenses.

    • Equipment: Cost of equipment needed for the project.

    • Indirect costs: Miscellaneous costs like permits, insurance, and taxes.

    • Example...

  • Answered by AI
  • Q3. How do you monitor the budget?
  • Ans. 

    I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.

    • Regularly review expenses to ensure they are in line with the budget

    • Compare actual expenses to budget projections to identify any discrepancies

    • Make adjustments to the budget as needed based on the review and analysis

    • Track spending patterns and identify areas where cost savings can be made

  • Answered by AI
  • Q4. What are indirect costs?
  • Ans. 

    Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.

    • Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.

    • Examples include rent, utilities, administrative salaries, and office supplies.

    • These costs are necessary for the business to function, but are not directly attributable to a specific produ...

  • Answered by AI
  • Q5. How can cash flow be effectively monitored?
  • Ans. 

    Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.

    • Track income and expenses regularly to understand the flow of cash in and out of the business.

    • Create cash flow statements to analyze the sources and uses of cash over a specific period.

    • Set up cash flow projections to forecast future cash flow based on exp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident; there is no need to skip any questions. Answer all the questions quickly and wisely.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

Group interview at video call

Round 3 - HR 

(3 Questions)

  • Q1. Salary negotiation
  • Q2. 2 time salary negotiation
  • Q3. Accommodation and other benifits

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for good answer
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Earth matic, reasoning, general knowledge

Round 3 - Technical 

(1 Question)

  • Q1. RCC, Soil & concrete Technology
Round 4 - One-on-one 

(1 Question)

  • Q1. General interaction & CTC
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About waterproofing procedure, observation raised and closed by application
  • Q2. Mivan formwork,MEP ,Qaulity assurance

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Assistant Manager interview:
  • All the finishing and rcc topice
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mostly Seismic Analysis Questions (IS 1893)
  • Q2. On what seismic force depends?
  • Ans. 

    Seismic force depends on the magnitude of an earthquake and the distance from the epicenter.

    • Seismic force is determined by the magnitude of the earthquake.

    • The greater the magnitude, the stronger the seismic force.

    • Seismic force also depends on the distance from the epicenter.

    • The closer to the epicenter, the stronger the seismic force.

    • Seismic force can cause buildings and structures to shake or collapse.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare IS codes and basics of structural engineerng
Round 1 - Technical 

(1 Question)

  • Q1. Must have complete knowledge of your working department. Specially technical
Round 2 - One-on-one 

(1 Question)

  • Q1. Be honest about your knowledge, don't try to misguide
Round 3 - HR 

(1 Question)

  • Q1. Simple about your background and current CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest , don't try to jump the topic,

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Senior Assistant Engineer interview?
Simplex Infrastructures interview process usually has 3 rounds. The most common rounds in the Simplex Infrastructures interview process are Technical and Resume Shortlist.
What are the top questions asked in Simplex Infrastructures Senior Assistant Engineer interview?

Some of the top questions asked at the Simplex Infrastructures Senior Assistant Engineer interview -

  1. Operation of Slipform Technol...read more
  2. About 275 meter tall Chokhey and Slip form Technol...read more
  3. About Chimney Structure Deta...read more

Tell us how to improve this page.

Simplex Infrastructures Senior Assistant Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 731 Interviews
Tata Projects Interview Questions
4.2
 • 419 Interviews
TCE Interview Questions
3.8
 • 245 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
View all
Assistant Manager
222 salaries
unlock blur

₹3.5 L/yr - ₹11.1 L/yr

Assistant Engineer
155 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Project Engineer
145 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
112 salaries
unlock blur

₹5 L/yr - ₹11.4 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview