i
Simplex Infrastructures
Filter interviews by
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
Slipform technology is a construction method used to continuously pour concrete to form a continuous, seamless structure.
Slipform technology involves a formwork system that moves vertically and horizontally to create a smooth concrete surface.
It is commonly used in the construction of tall structures such as towers, bridges, and silos.
The process allows for efficient and cost-effective construction by eliminating the n...
Top trending discussions
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
posted on 21 Jan 2025
I was interviewed before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Group interview at video call
Earth matic, reasoning, general knowledge
posted on 5 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
Seismic force depends on the magnitude of an earthquake and the distance from the epicenter.
Seismic force is determined by the magnitude of the earthquake.
The greater the magnitude, the stronger the seismic force.
Seismic force also depends on the distance from the epicenter.
The closer to the epicenter, the stronger the seismic force.
Seismic force can cause buildings and structures to shake or collapse.
posted on 31 Aug 2022
based on 1 interview
Interview experience
Assistant Manager
222
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Assistant Engineer
155
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Assistant Engineer - Civil
153
salaries
| ₹2.6 L/yr - ₹4.5 L/yr |
Project Engineer
145
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Deputy Manager
112
salaries
| ₹5 L/yr - ₹11.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA