I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
Slipform technology is a construction method used to continuously pour concrete to form a continuous, seamless structure.
Slipform technology involves a formwork system that moves vertically and horizontally to create a smooth concrete surface.
It is commonly used in the construction of tall structures such as towers, bridges, and silos.
The process allows for efficient and cost-effective construction by eliminating the n...
Top trending discussions
posted on 20 Jan 2025
Steel is used along with concrete for RCC to provide tensile strength and prevent cracking.
Steel has high tensile strength, while concrete has high compressive strength, so combining them creates a material that can withstand both tension and compression forces.
Steel helps to prevent cracking in concrete structures by providing reinforcement against tensile stresses.
Steel also helps to increase the ductility of the str...
The weight of 1 bag of cement varies depending on the type and brand, but it is typically around 50-100 pounds.
The weight of a bag of cement can range from 40 to 94 pounds.
Different types of cement, such as Portland cement or masonry cement, may have different weights per bag.
Some brands may offer larger bags of cement that weigh more than the standard 50-94 pounds.
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
posted on 15 Jul 2024
Various processes and method statements for construction activities
Developing a project plan outlining the scope, schedule, and budget
Conducting risk assessments to identify potential hazards and develop mitigation strategies
Implementing quality control measures to ensure compliance with specifications and standards
Documenting all construction activities and maintaining accurate records
Regularly inspecting work progres...
The step by step process of constructing a building involves planning, site preparation, foundation laying, structural work, finishing, and final inspection.
1. Planning: Determine the design, materials, and timeline for the project.
2. Site preparation: Clear the land, level the ground, and set up utilities.
3. Foundation laying: Pour concrete footings and build foundation walls.
4. Structural work: Construct the framewor...
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I applied via Job Portal
Modelling water supply
posted on 21 Jan 2025
I was interviewed before Jan 2024.
Steps involved in preparing a project budget
Identify all project expenses including labor, materials, equipment, etc.
Estimate the cost of each expense item based on historical data or quotes from vendors
Allocate funds for unexpected costs or contingencies
Determine the timeline for the project and spread out costs accordingly
Review and finalize the budget with key stakeholders
Factors considered in project costing include materials, labor, overhead, equipment, and indirect costs.
Materials: Cost of raw materials needed for the project.
Labor: Cost of labor required to complete the project.
Overhead: Indirect costs such as utilities, rent, and administrative expenses.
Equipment: Cost of equipment needed for the project.
Indirect costs: Miscellaneous costs like permits, insurance, and taxes.
Example...
I monitor the budget by regularly reviewing expenses, comparing them to projections, and making adjustments as needed.
Regularly review expenses to ensure they are in line with the budget
Compare actual expenses to budget projections to identify any discrepancies
Make adjustments to the budget as needed based on the review and analysis
Track spending patterns and identify areas where cost savings can be made
Indirect costs are expenses that are not directly tied to a specific project or department, but still contribute to overall operational costs.
Indirect costs are overhead expenses that cannot be easily traced to a specific cost object.
Examples include rent, utilities, administrative salaries, and office supplies.
These costs are necessary for the business to function, but are not directly attributable to a specific produ...
Cash flow can be effectively monitored by tracking income and expenses, creating cash flow statements, setting up cash flow projections, and using accounting software.
Track income and expenses regularly to understand the flow of cash in and out of the business.
Create cash flow statements to analyze the sources and uses of cash over a specific period.
Set up cash flow projections to forecast future cash flow based on exp...
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Group interview at video call
posted on 5 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
222
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Assistant Engineer
155
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Assistant Engineer - Civil
153
salaries
| ₹2.6 L/yr - ₹4.5 L/yr |
Project Engineer
145
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Deputy Manager
112
salaries
| ₹5 L/yr - ₹11.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA