i
SHYAM METALICS AND ENERGY
Filter interviews by
I applied via Approached by Company and was interviewed in Nov 2024. There were 3 interview rounds.
Sponge iron company visit complaint attend
Top trending discussions
Implementation of new technologies
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
posted on 6 Dec 2023
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 1 Jun 2022
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
The specific power consumption of a plant depends on various factors such as the type of plant, its size, and the equipment used.
Specific power consumption is the amount of energy consumed per unit of production.
It can be calculated by dividing the total energy consumption by the total production output.
Factors that affect specific power consumption include the type of plant, its size, the equipment used, and the produ...
I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.
I handled OEM customers from various industries including automotive, electronics, and telecommunications.
Automotive industry: Managed relationships with major car manufacturers such as Ford, Toyota, and BMW.
Electronics industry: Worked with OEM customers like Samsung, LG, and Sony to develop customized products.
Telecommunications industry: Collaborated with telecom giants like AT&T, Verizon, and Vodafone to provide ta...
I am looking for sales in the technology sector.
Technology sector
Software sales
Hardware sales
IT services
Telecommunications
Cloud computing
Internet of Things
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
The machine name at my current company is XYZ-2000 and it has a capacity of 500 units per hour.
Machine name: XYZ-2000
Capacity: 500 units per hour
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
based on 15 reviews
Rating in categories
Engineer
199
salaries
| ₹2.1 L/yr - ₹5.6 L/yr |
Assistant Engineer
182
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
167
salaries
| ₹3.4 L/yr - ₹9.6 L/yr |
Senior Engineer
160
salaries
| ₹3.3 L/yr - ₹7.3 L/yr |
Mechanical Engineer
69
salaries
| ₹2 L/yr - ₹6 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Jindal Steel and Power