i
Filter interviews by
Currently leading a team of 15 engineers in developing software solutions for a multinational corporation.
Leading a team of 15 engineers
Developing software solutions for a multinational corporation
Handling project timelines and deliverables
Collaborating with cross-functional teams
Top trending discussions
posted on 15 Aug 2023
I was interviewed before Aug 2022.
Extraction of aluminum involves the process of electrolysis of alumina.
Aluminum is extracted from its ore, bauxite, through the Bayer process.
The extracted alumina is then converted into aluminum through the Hall-Héroult process.
Electrolysis is used to separate the aluminum from the oxygen in alumina.
The process requires a large amount of electricity and is energy-intensive.
Alumina is extracted from bauxite through a process called the Bayer process.
Alumina is the primary component of aluminum production.
The Bayer process involves crushing the bauxite ore, mixing it with sodium hydroxide, and heating it in a pressure vessel.
The resulting solution is filtered to remove impurities, leaving behind alumina which is then processed into aluminum.
Alumina is used in a variety of industries includ
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 4 interview rounds.
What are the team size you are working with?
How to handle the escalation?
How to make improvements in services and user feedback?
How to do the Project management approch and delivery timeline.
posted on 26 Mar 2024
I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.
Oil-filled transformers are better due to higher efficiency and lower maintenance requirements. Test runs should include insulation resistance, turns ratio, and load testing.
Oil-filled transformers are better than dry-type transformers due to higher efficiency and lower maintenance requirements.
Test runs should include insulation resistance testing to check for any insulation breakdown.
Turns ratio testing should be con...
The Blast Furnace is equipped with multiple RIO panels and a variety of DI/DO and AI/AO channels.
The Blast Furnace typically has several RIO panels installed for monitoring and control purposes.
The number of DI/DO channels provided in a Blast Furnace can vary depending on the specific setup and requirements.
During commissioning, major problems may include issues with sensor calibration, communication errors, or softwar...
I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.
posted on 31 Jul 2023
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
Steps for planning physical security of a premise and data center
Conduct a risk assessment to identify potential threats and vulnerabilities
Develop a security plan based on the assessment
Implement access controls, such as biometric scanners and security cameras
Ensure proper environmental controls, such as fire suppression systems and temperature monitoring
Train employees on security protocols and conduct regular drills
...
I applied via Recruitment Consulltant and was interviewed in Sep 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2022. There were 4 interview rounds.
Logical Reasoning, Operations Concept like EOQ, linear Programming. Indias import export doc process, procurement concepts
Industry 4.0 in 2018
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited