Filter interviews by
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
Short cut keys for MS Word and Excel
Ctrl + C: Copy
Ctrl + V: Paste
Ctrl + X: Cut
Ctrl + Z: Undo
Ctrl + Y: Redo
Ctrl + B: Bold
Ctrl + I: Italic
Ctrl + U: Underline
Ctrl + S: Save
Ctrl + P: Print
The question asks to draw a table with 6 rows and 4 columns.
Draw a rectangle with 6 horizontal lines and 4 vertical lines
Label the rows and columns if necessary
Ensure the table is neat and organized
Use a ruler or straight edge for straight lines
Use the VLOOKUP formula to retrieve data from a table based on a specified value.
VLOOKUP is a function in Excel used to search for a value in the first column of a table and retrieve a corresponding value from another column.
The formula syntax is: =VLOOKUP(lookup_value, table_array, col_index_num, [range_lookup])
lookup_value is the value to search for, table_array is the range of cells that contains the data, col_index...
The pivot table formula is used to summarize and analyze data in a spreadsheet.
The formula starts with the 'PivotTable' function.
Specify the range of data to be analyzed.
Define the rows, columns, and values to be displayed in the pivot table.
Apply any necessary filters or calculations.
Refresh the pivot table when the source data changes.
I applied via Walk-in and was interviewed in Nov 2020. There were 2 interview rounds.
Rural Electrification Corporation interview questions for popular designations
I applied via Indeed and was interviewed before Mar 2020. There were 3 interview rounds.
Etiquette at a computer involves being mindful of others and respecting the equipment.
Avoid loud typing or clicking noises
Do not hog the computer or equipment
Clean up after yourself
Do not access inappropriate content
Respect others' privacy and do not peek at their screens
Do not tamper with or damage equipment
I would create a task list or outline with specific steps and deadlines.
Create a task list or outline with specific steps and deadlines
Prioritize tasks based on urgency and importance
Communicate with team members or supervisors for clarification or assistance
Regularly update the task list to track progress and ensure completion
Use tools such as project management software or a planner to stay organized
I would start by identifying the purpose and goals of the program, then create a plan and timeline, assign tasks and responsibilities, and communicate with stakeholders.
Identify the purpose and goals of the program
Create a plan and timeline
Assign tasks and responsibilities
Communicate with stakeholders
Ensure resources are available
Evaluate and adjust the program as needed
I use Ms Office to prepare reports by using various tools like Excel, Word, and PowerPoint.
I use Excel to create spreadsheets and analyze data
I use Word to create written reports and documents
I use PowerPoint to create presentations
I use charts, graphs, and tables to present data visually
I use formulas and functions to perform calculations
I use templates to save time and ensure consistency
I proofread and edit my report
My favorites include books, movies, and music.
Favorite book: To Kill a Mockingbird by Harper Lee
Favorite movie: The Shawshank Redemption
Favorite music: Classic rock, especially Led Zeppelin and Pink Floyd
I have 5 years of experience working as a librarian in a public library.
I have experience in cataloging and classifying books
I have experience in managing library collections
I have experience in providing reference and research assistance to library patrons
I have experience in organizing and conducting library programs and events
I have experience in supervising library staff and volunteers
I applied via Company Website and was interviewed in Nov 2018. There were 3 interview rounds.
Accessories used in 11kv pole mounted sub station with rating and purpose.
Lightning arresters (11kV) - to protect the substation from lightning strikes
Isolators (11kV) - to isolate the substation from the main power grid
Circuit breakers (11kV) - to protect the substation from overloads and short circuits
Transformers (11kV/415V) - to step down the voltage from 11kV to 415V for distribution
Busbars (11kV) - to distribute ...
Top trending discussions
Bulk density refers to the mass of a substance per unit volume, excluding any voids or air spaces.
It is a measure of how densely packed the particles or molecules are in a given volume.
Bulk density is commonly used in industries such as mining, agriculture, and pharmaceuticals.
It is calculated by dividing the mass of the substance by its volume.
For example, the bulk density of a soil sample can indicate its compaction ...
Target mean strength is the desired strength level of a product or material.
It is the strength level that a product or material is designed to meet or exceed.
It is determined based on the intended use and expected stresses on the product or material.
It is often used in quality control to ensure that products meet the desired strength level.
For example, the target mean strength of a steel beam used in construction may b...
There are several types of brick tests and corresponding IS codes.
Compressive strength test (IS code: IS 3495 Part 1)
Water absorption test (IS code: IS 3495 Part 2)
Efflorescence test (IS code: IS 3495 Part 3)
Dimensional tolerance test (IS code: IS 3495 Part 4)
Warpage test (IS code: IS 3495 Part 5)
Soundness test (IS code: IS 3495 Part 6)
Density test (IS code: IS 3495 Part 7)
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
There were medium level aptitude questions and then Data structures and Algorithms theoretical MCQs.
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
To get rid of dry soldering, you can try reflowing the solder, cleaning the surface, using flux, or replacing the solder altogether.
Reflow the solder by applying heat to melt and reflow the dry solder joints.
Clean the surface by removing any dirt, oxidation, or contaminants that may be affecting the soldering process.
Use flux to improve the wetting and flow of the solder, making it easier to create strong and reliable ...
I can maintain and operate a variety of machines.
I have experience maintaining and operating industrial machinery such as conveyor systems, packaging machines, and hydraulic presses.
I am skilled in troubleshooting and repairing electrical and mechanical issues in machines.
I can also operate heavy machinery like forklifts and cranes.
I am familiar with following maintenance schedules, conducting inspections, and performi...
WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.
WBS is a tool used in project management to organize and define the scope of a project
It breaks down the project into smaller, more manageable components
Each component is then assigned a unique identifier and can be further broken down into smaller components
WBS helps in estimating project c...
Progress payment is a payment made to a contractor based on the percentage of work completed.
Determine the percentage of work completed
Agree on the payment schedule with the contractor
Verify the work completed before making the payment
Ensure the payment is made on time to avoid delays
Keep accurate records of progress payments made
A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.
Define the scope of work and deliverables
Specify the payment terms and schedule
Set quality standards and acceptance criteria
Include provisions for warranties and guarantees
Outline the dispute resolution mechanisms
Include clauses for termination and breach of contract
Ensu...
Some of the top questions asked at the Rural Electrification Corporation interview -
based on 5 interviews
Interview experience
based on 119 reviews
Rating in categories
Project Engineer
97
salaries
| ₹3.1 L/yr - ₹6.2 L/yr |
Electrical Project Engineer
34
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Assistant Project Engineer
14
salaries
| ₹2.2 L/yr - ₹3.4 L/yr |
Electrical Engineer
12
salaries
| ₹3 L/yr - ₹5 L/yr |
Electrical Site Engineer
9
salaries
| ₹3.1 L/yr - ₹4 L/yr |
Power Finance Corporation
NTPC
Power Grid Corporation of India
REC Kurukshetra