I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Project discussion

I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Past work related questions
  • Q2. According previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - All about recommendation if you have recommended by top management then you are selected.

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

I applied via Company Website and was interviewed in Nov 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to transmission and distribution ,hv ac,electrical machine
  • Q2. Name Accessories used in 11kv pole mounted sub station with rating and purpose.
  • Ans. 

    Accessories used in 11kv pole mounted sub station with rating and purpose.

    • Lightning arresters (11kV) - to protect the substation from lightning strikes

    • Isolators (11kV) - to isolate the substation from the main power grid

    • Circuit breakers (11kV) - to protect the substation from overloads and short circuits

    • Transformers (11kV/415V) - to step down the voltage from 11kV to 415V for distribution

    • Busbars (11kV) - to distribute ...

  • Answered by AI

Interview Preparation Tips

General Tips: REC ONE OF THE BEST COMPANIES.
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills
Duration: 1-4 weeks

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. VRV system, mep related, fire fighting,

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you analyse the total consumption of diesel in equipment
  • Ans. 

    To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.

    • Collect data on equipment usage and fuel consumption

    • Calculate fuel efficiency by dividing fuel consumption by equipment usage

    • Compare fuel efficiency across different equipment to identify outliers

    • Identify factors that may affect fuel efficiency, such as maintenance or operator behavior

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and explain whatever you know
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Working Experience in electrical project
  • Ans. 

    I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.

    • Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.

    • Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.

    • Collaborated wi...

  • Answered by AI
  • Q2. Working process of project
  • Ans. 

    The working process of a project involves planning, execution, monitoring, and completion.

    • Planning phase includes defining project goals, scope, and deliverables.

    • Execution phase involves assigning tasks, managing resources, and implementing the project plan.

    • Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.

    • Completion phase involves finalizing deliverables, conducting proj

  • Answered by AI
  • Q3. From survey execution up to billing and closer
  • Ans. 

    The question is asking about the process from survey execution to billing and closure.

    • Survey execution involves designing and distributing surveys to collect data.

    • Data collected from surveys is then analyzed and processed.

    • Based on the analysis, billing is done for the services provided.

    • Finally, the project is closed, and any remaining tasks or documentation are completed.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Normal project technical quostions
Round 3 - HR 

(1 Question)

  • Q1. Typical HR question

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company salary on time good benefits

Interview Questionnaire 

2 Questions

  • Q1. They will be asking from your past experience and previous project.Situation based question is given preference .
  • Q2. Be yourself, mainly confidence they want to see in ur expression and be truthful.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to Post
  • Q2. Totally realated to designation and post.
Round 3 - HR 

(2 Questions)

  • Q1. About your self and previous company leaving reason.
  • Q2. Salary and Reliving and past company culture and reason for living.

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is very Good.
And staff is also good and helpful.
Company Policy is good.
I am totally satisfied with organization culture.

I applied via Job Portal and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Aerodynamic, censure, Bearing,PCB, and bought the sector.
Round 2 - Technical 

(1 Question)

  • Q1. Project planning & monitoring, Tools, safety.
Round 3 - HR 

(1 Question)

  • Q1. General HR questions and personality check

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with a positive attitude and let them know bout your work ethics.

Rural Electrification Corporation Interview FAQs

How many rounds are there in Rural Electrification Corporation Project Engineer interview?
Rural Electrification Corporation interview process usually has 1 rounds. The most common rounds in the Rural Electrification Corporation interview process are Technical.
What are the top questions asked in Rural Electrification Corporation Project Engineer interview?

Some of the top questions asked at the Rural Electrification Corporation Project Engineer interview -

  1. Name Accessories used in 11kv pole mounted sub station with rating and purpo...read more
  2. Technical questions related to transmission and distribution ,hv ac,electrical ...read more
  3. Project discuss...read more

Tell us how to improve this page.

Rural Electrification Corporation Project Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Rural Electrification Corporation Project Engineer Salary
based on 83 salaries
₹3.1 L/yr - ₹6.2 L/yr
19% less than the average Project Engineer Salary in India
View more details

Rural Electrification Corporation Project Engineer Reviews and Ratings

based on 27 reviews

3.6/5

Rating in categories

3.3

Skill development

3.7

Work-life balance

3.7

Salary

2.5

Job security

3.6

Company culture

2.9

Promotions

3.7

Work satisfaction

Explore 27 Reviews and Ratings
Project Engineer
83 salaries
unlock blur

₹3.1 L/yr - ₹6.2 L/yr

Electrical Project Engineer
34 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Assistant Project Engineer
14 salaries
unlock blur

₹2.2 L/yr - ₹3.4 L/yr

Electrical Engineer
12 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Electrical Site Engineer
9 salaries
unlock blur

₹3.1 L/yr - ₹4 L/yr

Explore more salaries
Compare Rural Electrification Corporation with

Vestas

4.2
Compare

ReNew

4.2
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare

Adani Green Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview