I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Building materials all questions
  • Q2. Rainforce cement concrete
Round 3 - One-on-one 

(1 Question)

  • Q1. Full books knowledge and best your answer

Interview Preparation Tips

Interview preparation tips for other job seekers - All knowledge good and strong knowledge good communication

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They will ask you about your basic details
Round 3 - Technical 

(1 Question)

  • Q1. Work experience and work related Questions which you have done in past

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free at the time of interview be comfortable and strong
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Excel , data specialist

Round 2 - HR 

(2 Questions)

  • Q1. Why you move from a government company and why
  • Ans. 

    I moved from a government company to gain more diverse experience and opportunities for growth.

    • Seeking new challenges and opportunities for career advancement

    • Desire for a more dynamic work environment

    • Wanted to work on a wider range of projects

    • Government company may have limitations in terms of innovation and flexibility

  • Answered by AI
  • Q2. Can do job for 10 hrs.

I appeared for an interview in Sep 2020.

Interview Questionnaire 

1 Question

  • Q1. There was many technical and project related questions they asked me.

Interview Preparation Tips

Interview preparation tips for other job seekers - We should prepare for competency as per our core functions

Interview Questionnaire 

1 Question

  • Q1. VRV system, mep related, fire fighting,

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you analyse the total consumption of diesel in equipment
  • Ans. 

    To analyse total diesel consumption in equipment, I would gather data on usage and calculate fuel efficiency.

    • Collect data on equipment usage and fuel consumption

    • Calculate fuel efficiency by dividing fuel consumption by equipment usage

    • Compare fuel efficiency across different equipment to identify outliers

    • Identify factors that may affect fuel efficiency, such as maintenance or operator behavior

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be precise and explain whatever you know

I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer wanted to best knowledge of your profile and your communication skills .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Name Green house gases and their GWP
  • Ans. 

    Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.

    • Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.

    • Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.

    • Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.

    • Fluorinated gases - GWP ranges from 1,000 to over 10,

  • Answered by AI
  • Q2. What is EIA, AND STEPS IN EIA
  • Ans. 

    EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.

    • 1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.

    • 2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.

    • 3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Numbers,LCM,HCF,Time speed Distance,Percentage

Round 3 - Group Discussion 

They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.

Round 4 - Technical 

(5 Questions)

  • Q1. Types of Concrete & their grades with mix proportion ratio ?
  • Ans. 

    Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.

    • Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)

    • High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3

    • High-performance concrete: designed for specific applications, with mix pro

  • Answered by AI
  • Q2. Steps Involved in concreting & curing ?
  • Ans. 

    Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.

    • Prepare formwork by setting up wooden or metal molds to contain the concrete.

    • Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.

    • Pour the concrete into the formwork, ensuring it reaches all corners and edges.

    • Level the concrete surface using a scre...

  • Answered by AI
  • Q3. Purpose of Retaining Wall ?
  • Ans. 

    Retaining walls are structures designed to hold back soil and prevent erosion.

    • Prevent soil erosion

    • Support sloping terrain

    • Create usable space on a hillside

    • Enhance landscaping design

  • Answered by AI
  • Q4. What is Bending moment & Shear force diagram ?
  • Ans. 

    Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.

    • Bending moment diagram shows the variation of bending moment along the length of a beam.

    • Shear force diagram shows the variation of shear force along the length of a beam.

    • These diagrams are essential for analyzing the behavior of beams under different loading conditions.

    • The diagrams help in determining the maximum bend...

  • Answered by AI
  • Q5. Roles of quantity Surveyor at site & office ?
  • Ans. 

    Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.

    • Preparing cost estimates and budgets

    • Analyzing construction plans and specifications

    • Negotiating with contractors and suppliers

    • Managing contracts and variations

    • Conducting site visits and inspections

    • Preparing progress reports and final accounts

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Greenko Group Assistant Manager interview:
  • Fluid Mechanics
  • Soil Mechanics
  • Quantity Surveying
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Regarding how to manage a site accommodation

Round 2 - HR 

(2 Questions)

  • Q1. Statutory related and other hr and admin work
  • Q2. How to handle work pressure
  • Ans. 

    I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.

    • Prioritize tasks based on deadlines and importance

    • Stay organized by creating to-do lists and setting realistic goals

    • Take breaks to recharge and prevent burnout

    • Communicate with team members and delegate tasks when necessary

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. About background work and work calcture
  • Q2. About payroll and contractor work statutory labour law. And other work pressurerelated.

Rural Electrification Corporation Interview FAQs

How many rounds are there in Rural Electrification Corporation Assistant Project Engineer interview?
Rural Electrification Corporation interview process usually has 3 rounds. The most common rounds in the Rural Electrification Corporation interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Rural Electrification Corporation Assistant Project Engineer interview?

Some of the top questions asked at the Rural Electrification Corporation Assistant Project Engineer interview -

  1. Full books knowledge and best your ans...read more
  2. Building materials all questi...read more
  3. Rainforce cement concr...read more

Tell us how to improve this page.

Rural Electrification Corporation Assistant Project Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

ReNew Interview Questions
4.2
 • 90 Interviews
Vestas Interview Questions
4.3
 • 88 Interviews
Jakson Group Interview Questions
4.2
 • 83 Interviews
Siemens Energy Interview Questions
4.1
 • 76 Interviews
Wind World Interview Questions
3.9
 • 76 Interviews
Waaree Energies Interview Questions
3.9
 • 61 Interviews
Greenko Group Interview Questions
3.8
 • 50 Interviews
View all
Rural Electrification Corporation Assistant Project Engineer Salary
based on 14 salaries
₹2.2 L/yr - ₹3.4 L/yr
28% less than the average Assistant Project Engineer Salary in India
View more details

Rural Electrification Corporation Assistant Project Engineer Reviews and Ratings

based on 10 reviews

4.6/5

Rating in categories

4.4

Skill development

4.2

Work-life balance

3.9

Salary

4.0

Job security

4.3

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 10 Reviews and Ratings
Project Engineer
83 salaries
unlock blur

₹3.1 L/yr - ₹6.2 L/yr

Electrical Project Engineer
34 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Assistant Project Engineer
14 salaries
unlock blur

₹2.2 L/yr - ₹3.4 L/yr

Electrical Engineer
12 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Electrical Site Engineer
9 salaries
unlock blur

₹3.1 L/yr - ₹4 L/yr

Explore more salaries
Compare Rural Electrification Corporation with

Vestas

4.3
Compare

ReNew

4.2
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare

Adani Green Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview