Filter interviews by
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
To get rid of dry soldering, you can try reflowing the solder, cleaning the surface, using flux, or replacing the solder altogether.
Reflow the solder by applying heat to melt and reflow the dry solder joints.
Clean the surface by removing any dirt, oxidation, or contaminants that may be affecting the soldering process.
Use flux to improve the wetting and flow of the solder, making it easier to create strong and reliable ...
I can maintain and operate a variety of machines.
I have experience maintaining and operating industrial machinery such as conveyor systems, packaging machines, and hydraulic presses.
I am skilled in troubleshooting and repairing electrical and mechanical issues in machines.
I can also operate heavy machinery like forklifts and cranes.
I am familiar with following maintenance schedules, conducting inspections, and performi...
Top trending discussions
posted on 1 Mar 2022
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Basic information about simens gamesa under knowledge
I applied via Walk-in and was interviewed before Sep 2021. There were 3 interview rounds.
Solar related questions.
I applied via Company Website and was interviewed in Oct 2020. There were 3 interview rounds.
I appeared for an interview in Sep 2020.
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
based on 4 reviews
Rating in categories
Assistant Manager
41
salaries
| ₹5.4 L/yr - ₹10.3 L/yr |
Electrical Engineer
40
salaries
| ₹2.2 L/yr - ₹5.9 L/yr |
Senior Engineer
36
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Senior Manager
35
salaries
| ₹9.5 L/yr - ₹24 L/yr |
Technician
29
salaries
| ₹1.4 L/yr - ₹4.2 L/yr |
Adani Power
Vestas
ReNew
Siemens Gamesa Renewable Power Private Limited