Filter interviews by
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
To get rid of dry soldering, you can try reflowing the solder, cleaning the surface, using flux, or replacing the solder altogether.
Reflow the solder by applying heat to melt and reflow the dry solder joints.
Clean the surface by removing any dirt, oxidation, or contaminants that may be affecting the soldering process.
Use flux to improve the wetting and flow of the solder, making it easier to create strong and reliable ...
I can maintain and operate a variety of machines.
I have experience maintaining and operating industrial machinery such as conveyor systems, packaging machines, and hydraulic presses.
I am skilled in troubleshooting and repairing electrical and mechanical issues in machines.
I can also operate heavy machinery like forklifts and cranes.
I am familiar with following maintenance schedules, conducting inspections, and performi...
Top trending discussions
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
posted on 21 Sep 2024
I applied via Referral and was interviewed in Jan 2024. There were 2 interview rounds.
Maintenance planning involves creating a systematic approach to ensure efficient and effective maintenance activities.
Developing a maintenance schedule based on equipment requirements and priorities
Identifying and procuring necessary resources, such as spare parts and tools
Coordinating with other departments to minimize disruptions and downtime
Implementing preventive maintenance strategies to reduce breakdowns
Tracking ...
Addressing employee behavior issues as a Maintenance Manager
Identify the specific behavior that is not good
Have a private conversation with the employee to discuss the issue
Clearly communicate expectations and provide feedback on how the behavior is impacting the team or organization
Offer support and resources to help the employee improve
Implement disciplinary actions if necessary, following company policies and proced...
posted on 21 Dec 2023
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 22 May 2024
Types of valves include gate valves, globe valves, ball valves, butterfly valves, and check valves.
Gate valves
Globe valves
Ball valves
Butterfly valves
Check valves
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
I applied via Company Website and was interviewed in May 2022. There was 1 interview round.
posted on 1 Mar 2022
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Basic information about simens gamesa under knowledge
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Electrical Engineer
51
salaries
| ₹1.7 L/yr - ₹5.9 L/yr |
Assistant Manager
49
salaries
| ₹5.4 L/yr - ₹10.3 L/yr |
Senior Manager
39
salaries
| ₹9.5 L/yr - ₹28 L/yr |
Senior Engineer
37
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Technician
30
salaries
| ₹1.4 L/yr - ₹4.2 L/yr |
Adani Green Energy
Waaree Energies
Jakson Group
Azure Power