Filter interviews by
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridg...
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traff...
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and con...
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Seeking new challenges and growth opportunities.
Looking for a more challenging role to further develop my skills and expertise.
Seeking a company that aligns better with my long-term career goals.
Desire to work on more innovative projects and cutting-edge technologies.
Wishing to broaden my professional network and learn from new colleagues.
Wanting to explore different industry sectors and gain diverse experience.
I am unable to provide my last salary as I do not have access to the data.
I do not have the available data to provide my last salary
I am unable to access my salary information for the last 3 months
Unfortunately, I cannot provide the requested information
R.S. Infraprojects interview questions for popular designations
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Techno is successful by staying ahead of trends, adapting quickly, and fostering innovation.
Staying ahead of trends by constantly researching and investing in new technologies
Adapting quickly to changes in the market and consumer preferences
Fostering innovation through a culture of creativity and experimentation
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Discuss about experience
I was interviewed before Jan 2024.
Information about future engineering in construction sector and how can we find thier alternatives
I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
The appropriate size for a beam depends on factors such as load, span, material, and building codes.
Consider the load the beam will need to support
Calculate the span of the beam
Select an appropriate material for the beam based on strength and durability
Ensure the beam meets building code requirements for safety
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
The duration of R.S. Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 39 interviews
Interview experience
based on 444 reviews
Rating in categories
Assistant Manager
80
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GMR Group