Filter interviews by
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
Processing of transmission line survey work involves analyzing collected data, creating detailed reports, and ensuring accuracy.
Analyzing data collected from the field surveys
Creating detailed reports with findings and recommendations
Ensuring accuracy of measurements and calculations
Utilizing software tools for data processing and analysis
Collaborating with team members to review and validate results
Transmission line profile sag is the vertical distance between the highest point of the conductor and a hypothetical straight line connecting the two towers.
Transmission line profile sag is influenced by factors such as temperature, wind, and conductor tension.
It is important to calculate sag accurately to prevent the conductor from touching the ground or other objects.
Sag can be adjusted by changing the tension in the...
R.S. Infraprojects interview questions for popular designations
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridg...
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traff...
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and con...
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Seeking new challenges and growth opportunities.
Looking for a more challenging role to further develop my skills and expertise.
Seeking a company that aligns better with my long-term career goals.
Desire to work on more innovative projects and cutting-edge technologies.
Wishing to broaden my professional network and learn from new colleagues.
Wanting to explore different industry sectors and gain diverse experience.
I am unable to provide my last salary as I do not have access to the data.
I do not have the available data to provide my last salary
I am unable to access my salary information for the last 3 months
Unfortunately, I cannot provide the requested information
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Top trending discussions
The duration of R.S. Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 41 interviews
Interview experience
based on 449 reviews
Rating in categories
Assistant Manager
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GMR Group