I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridg...
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traff...
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and con...
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Seeking new challenges and growth opportunities.
Looking for a more challenging role to further develop my skills and expertise.
Seeking a company that aligns better with my long-term career goals.
Desire to work on more innovative projects and cutting-edge technologies.
Wishing to broaden my professional network and learn from new colleagues.
Wanting to explore different industry sectors and gain diverse experience.
I am unable to provide my last salary as I do not have access to the data.
I do not have the available data to provide my last salary
I am unable to access my salary information for the last 3 months
Unfortunately, I cannot provide the requested information
Top trending discussions
posted on 27 Jun 2023
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Electrical Engineering Basics (Power Systems, Circuits, E.t.c)
posted on 20 Nov 2023
I was interviewed in Oct 2023.
Load calculation is the process of determining the electrical load requirements for a project.
Identify the electrical devices and equipment that will be used in the project
Determine the power requirements (in watts) for each device
Calculate the total power demand by summing up the power requirements of all devices
Consider factors like diversity factor and demand factor to account for variations in usage
Ensure that the ...
The number of amps required for 1kVA depends on the voltage.
The formula to calculate amps is: Amps = kVA / Voltage
For example, if the voltage is 120V, then the amps required for 1kVA would be 8.33A
If the voltage is 240V, then the amps required for 1kVA would be 4.17A
posted on 6 Dec 2022
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
I was interviewed in May 2022.
posted on 27 Jun 2023
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Electrical Engineering Basics (Power Systems, Circuits, E.t.c)
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
76
salaries
| ₹4.3 L/yr - ₹9.3 L/yr |
Engineer
59
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Senior Engineer
58
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Quality Engineer
48
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Senior Executive
30
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GMR Group