Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.
Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.
It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.
The panels are assembled on site to form the desired shape and siz...
Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.
Prepare the surface by cleaning and repairing any cracks or damage.
Apply the waterproofing material using the reco...
Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.
Steel fibres are added to the concrete mix to enhance its mechanical properties.
The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.
Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.
It is also ...
I have experience in piling works including design, installation, and testing of piles.
Designed pile foundations for various structures including bridges and buildings
Installed piles using various methods such as driven piles and drilled shafts
Conducted pile load tests to ensure the capacity of the piles
Managed and supervised piling works on construction sites
Ensured compliance with safety regulations and quality stand
Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.
Understanding the properties of concrete and how it reacts to different conditions
Proper mixing of concrete ingredients to achieve the desired strength and consistency
Ensuring proper placement and compaction of concrete to avoid voids and weak spots
Proper curing of concrete to achieve maximum strength and ...
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.
Building materials have varying densities depending on their composition.
Density is the mass per unit volume of a material.
Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).
Density affects the strength and durability of a structure, as well as its weight and cost.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
SUBJECT - BTECH QUESTION ARE BEING ASKED
SITUATIONSHIP IS THE QUESTION THEY ASKED , WHERE THEY CHECKED MY MANAGEMENT SKILLS
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
87
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Engineer
58
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Senior Engineer
57
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Quality Engineer
46
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Senior Executive
30
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Knight Frank
Berkadia
Smartworks
Xanadu