I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
Processing of transmission line survey work involves analyzing collected data, creating detailed reports, and ensuring accuracy.
Analyzing data collected from the field surveys
Creating detailed reports with findings and recommendations
Ensuring accuracy of measurements and calculations
Utilizing software tools for data processing and analysis
Collaborating with team members to review and validate results
Transmission line profile sag is the vertical distance between the highest point of the conductor and a hypothetical straight line connecting the two towers.
Transmission line profile sag is influenced by factors such as temperature, wind, and conductor tension.
It is important to calculate sag accurately to prevent the conductor from touching the ground or other objects.
Sag can be adjusted by changing the tension in the...
Top trending discussions
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
We are using the good thing.then leadership,social also we have handled.
Poor planning and lack of communication are the main reasons for construction failure.
Poor planning and design
Lack of communication between stakeholders
Inadequate supervision and inspection
Use of substandard materials and equipment
Unforeseen environmental factors
Inaccurate surveying and measurements
Human error and negligence
I applied via Naukri.com and was interviewed in Oct 2022. There were 4 interview rounds.
This round covers basic engineering conversions and calculations.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed in Aug 2021. There were 2 interview rounds.
based on 13 reviews
Rating in categories
Assistant Manager
74
salaries
| ₹4.4 L/yr - ₹9.3 L/yr |
Engineer
59
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Senior Engineer
58
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Quality Engineer
46
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Senior Executive
29
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GMR Group