i
Skandhanshi Infra Projects
Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
Credit is the ability to obtain goods or services before payment, based on the trust that payment will be made in the future.
Credit is a financial arrangement where a borrower receives something of value with the promise to repay later.
It is commonly used for purchasing items like cars, homes, and appliances.
Credit can also refer to the positive balance in a person's account or the amount of money available to borrow.
C...
Outstanding amounts are maintained by regularly following up with clients, sending reminders, and updating records.
Regularly follow up with clients to remind them of outstanding amounts
Send reminders through emails, phone calls, or letters
Update records to accurately reflect the status of outstanding amounts
Negotiate payment plans with clients if necessary
Utilize accounting software to track and manage outstanding amou
To check GST and net amount on an invoice, calculate GST amount by multiplying net amount by GST rate, then add it to net amount.
Calculate GST amount by multiplying net amount by GST rate (e.g. 18% GST on $100 = $18)
Add GST amount to net amount to get payable amount (e.g. $100 + $18 = $118)
Verify that the total payable amount matches the sum of net amount and GST amount
I was interviewed before Feb 2024.
I was interviewed before Feb 2024.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Electrical Engineering Basics (Power Systems, Circuits, E.t.c)
Skandhanshi Infra Projects interview questions for popular designations
I applied via Walk-in and was interviewed in Jan 2022. There was 1 interview round.
Stirrup calculation and material quantity in 1 cum of concrete.
Stirrup calculation involves determining the number, size, and spacing of stirrups required for a reinforced concrete element.
The quantity of materials in 1 cum of concrete depends on the mix design and the required strength of the concrete.
For example, for M20 grade concrete, the quantity of materials required for 1 cum of concrete is 0.28 cum of cement, 0...
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
The density of cement, sand, and aggregate varies depending on their composition and packing density.
The density of cement typically ranges from 1,100 to 1,500 kg/m³.
The density of sand can vary between 1,400 to 1,600 kg/m³.
The density of aggregate depends on its size and can range from 1,000 to 2,500 kg/m³.
The density of lightweight aggregates, such as expanded clay or shale, can be as low as 300 kg/m³.
The density of ...
The billing process as per code book involves following specific guidelines and procedures for accurate and timely billing.
The code book provides guidelines for billing procedures
The billing process should be accurate and timely
The code book may include specific codes for billing purposes
Billing should be done in accordance with the client's requirements
Invoicing should be done promptly and accurately
I applied via Company Website and was interviewed before Sep 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
Top trending discussions
based on 7 interviews
Interview experience
based on 167 reviews
Rating in categories
Assistant Manager
24
salaries
| ₹4.7 L/yr - ₹10.4 L/yr |
Assistant Engineer
20
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Senior Engineer
18
salaries
| ₹2 L/yr - ₹8.2 L/yr |
Senior Executive
17
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Graduate Engineer Trainee (Get)
15
salaries
| ₹1.6 L/yr - ₹2.4 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure