Q1. For making LOP what data exactly required?
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and connections, is required.
Safety regulations and standards mus...read more
Q2. For making CSD what data exectly required?
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Q3. Clearance from signals in front and back side
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traffic signal design, clearance is crucial to ensure proper vi...read more
Q4. Maximum span under bridges
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridge.
The maximum span under a bridge can also be influenced b...read more
Q5. What is processing of transmission line survey work?
Processing of transmission line survey work involves analyzing collected data, creating detailed reports, and ensuring accuracy.
Analyzing data collected from the field surveys
Creating detailed reports with findings and recommendations
Ensuring accuracy of measurements and calculations
Utilizing software tools for data processing and analysis
Collaborating with team members to review and validate results
Q6. What is transmission line profile sag ?
Transmission line profile sag is the vertical distance between the highest point of the conductor and a hypothetical straight line connecting the two towers.
Transmission line profile sag is influenced by factors such as temperature, wind, and conductor tension.
It is important to calculate sag accurately to prevent the conductor from touching the ground or other objects.
Sag can be adjusted by changing the tension in the conductor or by using spacer dampers.
Example: If a transm...read more
Q7. What is the appropriate size for a beam?
The appropriate size for a beam depends on factors such as load, span, material, and building codes.
Consider the load the beam will need to support
Calculate the span of the beam
Select an appropriate material for the beam based on strength and durability
Ensure the beam meets building code requirements for safety
Q8. Which is required for start survey at starting point?
Q9. How Techno is successful
Techno is successful by staying ahead of trends, adapting quickly, and fostering innovation.
Staying ahead of trends by constantly researching and investing in new technologies
Adapting quickly to changes in the market and consumer preferences
Fostering innovation through a culture of creativity and experimentation
Q10. Knowledge about survey equipments?
More about working at R.S. Infraprojects
Top HR Questions asked in Horizontal Integration
Interview Process at Horizontal Integration
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month