I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.
After seeing the drawing, my roles and responsibilities would include interpreting the design, identifying quantities and measurements, estimating costs, and preparing bills of quantities.
Interpreting the design and understanding the scope of work
Identifying quantities and measurements of materials, labor, and equipment required
Estimating costs based on the quantities and market rates
Preparing bills of quantities for t...
I will divide the plot into smaller sections and calculate the volume of earthwork required for each section separately.
Divide the plot into smaller sections based on the topography and soil type
Calculate the volume of earthwork required for each section separately using the formula: Volume = Area x Depth
Aggregate the volumes of all sections to get the total volume of earthwork required
Use the total volume to estimate ...
Rolling reconciliation sheet for cement, reinforcement steel & structural steel
Collect data on the quantity and cost of cement, reinforcement steel, and structural steel used in the project
Prepare a table with columns for opening balance, receipts, issues, closing balance, and remarks for each material
Update the table regularly with the latest data and calculate the closing balance for each material
Compare the closing ...
Deduction criteria for plastering measurements include openings, thickness, and wastage.
Openings such as doors and windows are deducted from the total area of plastering.
Thickness of plastering is also taken into consideration for deductions.
Wastage due to uneven surfaces or improper mixing is also deducted.
Deductions are calculated as per the standard measurement practices and contract specifications.
For example, if t...
I am switching to ROHAN BUILDERS because of their strong reputation in the industry and their focus on innovation and growth.
ROHAN BUILDERS has a strong reputation in the industry for delivering high-quality projects on time and within budget.
I am attracted to the company's focus on innovation and their commitment to using advanced technologies in construction.
ROHAN BUILDERS offers excellent growth opportunities and a ...
I am available to join immediately.
I am ready to start as soon as possible.
I can join right away.
I am currently not committed to any other project.
I am excited to begin working with your team.
I can provide any necessary documentation for the joining process.
Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.
Calculate the dimensions of the project area
Determine the materials needed for the project
Estimate the quantities of materials required based on the dimensions and specifications
Consider factors such as wastage and additional materials for contingencies
Use software tools like AutoCAD or Excel for accurate calculati
Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.
Identify all costs associated with the project or operation, including direct and indirect costs.
Break down costs into categories such as labor, materials, equipment, overhead, and contingency.
Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.
Use...
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
Vlookup is a function in Excel used to search for a value in a table and return a corresponding value from another column.
Vlookup stands for 'vertical lookup'
It is used to search for a value in the first column of a table and return a value in the same row from a specified column
Syntax: =VLOOKUP(lookup_value, table_array, col_index_num, [range_lookup])
Example: =VLOOKUP(A2, B2:D10, 3, FALSE) - searches for the value in ...
I was interviewed before Dec 2023.
Concerning the billing process.
I applied via Referral and was interviewed in May 2021. There were 2 interview rounds.
posted on 2 Oct 2022
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
GST stands for Goods and Services Tax.
GST is a comprehensive indirect tax levied on the supply of goods and services in India.
It was implemented on 1st July 2017 to replace multiple indirect taxes like VAT, excise duty, service tax, etc.
The main objective of GST is to create a unified and simplified tax structure across the country.
It has different tax slabs for different goods and services, such as 5%, 12%, 18%, and 2...
Senior Engineer
78
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Safety Officer
76
salaries
| ₹1.9 L/yr - ₹5.7 L/yr |
Assistant Engineer
45
salaries
| ₹3.5 L/yr - ₹6.2 L/yr |
Junior Engineer
42
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Junior Engineer Civil
41
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF