A Safety Officer was asked 6d ago
Q. What are the hazards and precautions associated with excavation, and what types of soil and angles should be considered?
Ans. 

Excavation hazards include cave-ins, falls, and equipment accidents; precautions involve proper shoring and soil assessment.

  • Cave-ins are the most serious hazard; use trench boxes or shoring to prevent collapses.

  • Soil types: cohesive (clay) and non-cohesive (sand); cohesive soils can stand at steeper angles.

  • Follow OSHA guidelines for excavation safety, including proper signage and barriers.

  • Angle of repose: typically...

View all Safety Officer interview questions
A Safety Officer was asked 6d ago
Q. What is the main difference between Job Safety Analysis (JSA) and Hazard Identification and Risk Assessment (HIRA)?
Ans. 

JSA focuses on specific job tasks, while HIRA assesses broader hazards and risks in the workplace.

  • JSA is task-specific, analyzing individual job steps for hazards.

  • HIRA evaluates overall workplace hazards and risks, not limited to specific tasks.

  • Example of JSA: Analyzing the risks of using a ladder for maintenance work.

  • Example of HIRA: Assessing the risk of slips, trips, and falls in the entire facility.

View all Safety Officer interview questions
An Assitant Engineer QS,Bengaluru was asked 2mo ago
Q. What is defect liability?
Ans. 

Defect liability refers to the period during which a contractor is responsible for fixing defects in their work after project completion.

  • Typically lasts for a specified period, often 12 months after project completion.

  • Contractors must rectify defects at no additional cost to the client.

  • Examples include fixing leaks, structural issues, or faulty installations.

  • Defect liability ensures quality and accountability in c...

An Administration Executive was asked 4mo ago
Q. What is statutory compliance?
Ans. 

Statutory compliance refers to the legal framework within which an organization must operate to ensure adherence to laws and regulations.

  • Ensuring compliance with labor laws, tax laws, environmental regulations, and other legal requirements

  • Maintaining accurate records and documentation to demonstrate compliance

  • Regularly reviewing and updating policies and procedures to align with changing laws

  • Conducting audits and ...

View all Administration Executive interview questions
An Administration Executive was asked 4mo ago
Q. How do you handle site-related problems?
Ans. 

I address site-related problems by identifying the root cause, developing a solution plan, and coordinating with relevant stakeholders for implementation.

  • Identify the root cause of the problem

  • Develop a solution plan

  • Coordinate with relevant stakeholders for implementation

  • Regularly monitor the progress of the solution

View all Administration Executive interview questions
A Senior HR Executive was asked 7mo ago
Q. Introduce yourself.
Ans. 

Dynamic HR professional with over 10 years of experience in talent acquisition, employee engagement, and organizational development.

  • Over a decade of experience in HR management, focusing on strategic workforce planning.

  • Successfully led a team to implement a new performance management system, increasing employee satisfaction by 30%.

  • Expert in developing training programs that enhance employee skills and promote care...

View all Senior HR Executive interview questions
A Senior Engineer QS was asked 7mo ago
Q. How do you prepare a measurement sheet?
Ans. 

Measurement sheet is prepared by taking off quantities from drawings and specifications.

  • Review drawings and specifications to identify items to be measured

  • Take accurate measurements using appropriate tools and techniques

  • Record measurements in a systematic manner on the measurement sheet

  • Include relevant details such as dimensions, quantities, and units

  • Double-check measurements for accuracy and completeness

  • Organize ...

View all Senior Engineer QS interview questions
Are these interview questions helpful?
An Assistant Engineer - Civil was asked 7mo ago
Q. What is concrete?
Ans. 

Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.

  • Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more

  • It is made by mixing cement, water, and aggregates like sand and gravel

  • Additives can be included to enhance specific properties of the concrete, such as strength or workability

  • Once mixed, concrete h...

View all Assistant Engineer - Civil interview questions
An Assistant Engineer-QS (Billing) was asked 9mo ago
Q. What are the deductions for plaster work?
Ans. 

Deductions for plaster work include wastage, openings, and curing period.

  • Wastage of materials during application

  • Deductions for openings such as windows and doors

  • Curing period for the plaster work

An Assistant Engineer-QS (Billing) was asked 9mo ago
Q. What are the deductions for shuttering work?
Ans. 

Deduction for shuttering work is the process of calculating and subtracting the cost of temporary formwork used in construction projects.

  • Deduction for shuttering work is typically calculated based on the area of formwork used.

  • The cost of shuttering work is deducted from the total billing amount of a construction project.

  • This deduction accounts for the temporary nature of formwork and is a common practice in constr...

Rohan Builders Interview Experiences

48 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. If a drawing is given to you then what will be your roles and responsibility after seeing the drawing??
  • Ans. 

    After seeing the drawing, my roles and responsibilities would include interpreting the design, identifying quantities and measurements, estimating costs, and preparing bills of quantities.

    • Interpreting the design and understanding the scope of work

    • Identifying quantities and measurements of materials, labor, and equipment required

    • Estimating costs based on the quantities and market rates

    • Preparing bills of quantities for t...

  • Answered by AI
  • Q2. If a plot of 54.4 acre is given to you and excavation should happen in benching then how will you streamline the measurements of earthwork in cutting & filling??
  • Ans. 

    I will divide the plot into smaller sections and calculate the volume of earthwork required for each section separately.

    • Divide the plot into smaller sections based on the topography and soil type

    • Calculate the volume of earthwork required for each section separately using the formula: Volume = Area x Depth

    • Aggregate the volumes of all sections to get the total volume of earthwork required

    • Use the total volume to estimate ...

  • Answered by AI
  • Q3. How to prepare rolling reconciliation sheet for CEMENT, REINFORCEMENT STEEL & STRUCTURAL STEEL?
  • Ans. 

    Rolling reconciliation sheet for cement, reinforcement steel & structural steel

    • Collect data on the quantity and cost of cement, reinforcement steel, and structural steel used in the project

    • Prepare a table with columns for opening balance, receipts, issues, closing balance, and remarks for each material

    • Update the table regularly with the latest data and calculate the closing balance for each material

    • Compare the closing ...

  • Answered by AI
  • Q4. What are deduction criteria for plastering measurements??
  • Ans. 

    Deduction criteria for plastering measurements include openings, thickness, and wastage.

    • Openings such as doors and windows are deducted from the total area of plastering.

    • Thickness of plastering is also taken into consideration for deductions.

    • Wastage due to uneven surfaces or improper mixing is also deducted.

    • Deductions are calculated as per the standard measurement practices and contract specifications.

    • For example, if t...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you switching from a globally renowned organisation to ROHAN BUILDERS?
  • Ans. 

    I am switching to ROHAN BUILDERS because of their strong reputation in the industry and their focus on innovation and growth.

    • ROHAN BUILDERS has a strong reputation in the industry for delivering high-quality projects on time and within budget.

    • I am attracted to the company's focus on innovation and their commitment to using advanced technologies in construction.

    • ROHAN BUILDERS offers excellent growth opportunities and a ...

  • Answered by AI
  • Q2. When can we expect your joining?
  • Ans. 

    I am available to join immediately.

    • I am ready to start as soon as possible.

    • I can join right away.

    • I am currently not committed to any other project.

    • I am excited to begin working with your team.

    • I can provide any necessary documentation for the joining process.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be genuine and don't give false answers if you don't know something tell the truth.

Safety Officer Interview Questions & Answers

user image Arun Kumar Singh

posted on 28 Jun 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. What is the main difference between Job Safety Analysis (JSA) and Hazard Identification and Risk Assessment (HIRA)?
  • Ans. 

    JSA focuses on specific job tasks, while HIRA assesses broader hazards and risks in the workplace.

    • JSA is task-specific, analyzing individual job steps for hazards.

    • HIRA evaluates overall workplace hazards and risks, not limited to specific tasks.

    • Example of JSA: Analyzing the risks of using a ladder for maintenance work.

    • Example of HIRA: Assessing the risk of slips, trips, and falls in the entire facility.

  • Answered by AI
  • Q2. What is a confined space, and what are the associated hazards and precautions? What are the responsibilities of the safety officer, attendant, entrant, and rescue team?
  • Ans. 

    A confined space is an area not designed for continuous occupancy, posing unique hazards requiring specific safety measures.

    • Definition: A confined space is an area with limited entry and exit, such as tanks, silos, or tunnels.

    • Hazards: Oxygen deficiency, toxic gases, flammable materials, and physical hazards like engulfment or entrapment.

    • Precautions: Conduct air quality tests, ensure proper ventilation, use personal pro...

  • Answered by AI
  • Q3. What are the hazards and precautions associated with excavation, and what types of soil and angles should be considered?
  • Ans. 

    Excavation hazards include cave-ins, falls, and equipment accidents; precautions involve proper shoring and soil assessment.

    • Cave-ins are the most serious hazard; use trench boxes or shoring to prevent collapses.

    • Soil types: cohesive (clay) and non-cohesive (sand); cohesive soils can stand at steeper angles.

    • Follow OSHA guidelines for excavation safety, including proper signage and barriers.

    • Angle of repose: typically 1:1 ...

  • Answered by AI
  • Q4. What are the different types of cranes, the associated hazard precautions, and what is ASLI in relation to safety devices for cranes?
  • Ans. 

    Cranes vary in type and hazards; precautions include inspections and safety devices like ASLI for operational safety.

    • Types of cranes include: Tower cranes, Mobile cranes, Crawler cranes, and Overhead cranes.

    • Hazard precautions: Regular inspections, operator training, and load limits.

    • Example: Tower cranes require proper anchoring to prevent tipping.

    • ASLI (Automatic Safe Load Indicator) helps prevent overload by providing ...

  • Answered by AI
  • Q5. What are the different types of scaffolding, the hazards associated with it, the required specifications for the sole plate and base jack, the thickness of pipe components, and what is the process for cons...
  • Ans. 

    Scaffolding types, hazards, specifications, and construction process are crucial for safety in construction.

    • Types of scaffolding: Tube and clamp, frame, system, and suspended scaffolding.

    • Hazards: Falls, falling objects, structural failure, and electrocution.

    • Sole plate specifications: Must be made of sturdy material, minimum thickness of 50mm.

    • Base jack specifications: Should be adjustable, with a minimum load capacity o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - One of the best construction companies, their facilities and safety culture are very good.

Interview Questions & Answers

user image Murali Dhar

posted on 23 Apr 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Can you do rate analysis?find only material rates for 12mm thk internal plaster in CM 1:4
  • Q2. If you know cost per sft of previous project,write rates per sft of all activities starting from Excavation,PCC .... and so on.
  • Q3. Do you Know reconciliation?what is the allowable wastage for reinforcement?
  • Q4. What are the ongoing labour rates for Painting,plastering,shuttering and reinforcement?
  • Q5. Assume there are 200 labours present at the site now and all concrete works are going on,can you assess the qty of work done?
  • Q6. What id the labour output for block work,reinforcement.paint and shuttering works?
  • Q7. Do you know FIIDC and general conditions of contract?
  • Q8. When the defect liability period starts for a contractor?
  • Q9. What is defect liability?
  • Ans. 

    Defect liability refers to the period during which a contractor is responsible for fixing defects in their work after project completion.

    • Typically lasts for a specified period, often 12 months after project completion.

    • Contractors must rectify defects at no additional cost to the client.

    • Examples include fixing leaks, structural issues, or faulty installations.

    • Defect liability ensures quality and accountability in constr...

  • Answered by AI
  • Q10. If a contractor doesn't rectify his defects,how will you recover the liabilities?
  • Q11. What if both security and retention both are paid to the contractor in the above case?
  • Q12. Can you do cash flow for the project?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself,answer to the point.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How to prepare measurement sheet?
  • Ans. 

    Measurement sheet is prepared by taking off quantities from drawings and specifications.

    • Review drawings and specifications to identify items to be measured

    • Take accurate measurements using appropriate tools and techniques

    • Record measurements in a systematic manner on the measurement sheet

    • Include relevant details such as dimensions, quantities, and units

    • Double-check measurements for accuracy and completeness

    • Organize the m...

  • Answered by AI
  • Q2. Current project billing process
  • Ans. 

    Our current project billing process involves tracking expenses, labor costs, and materials used to accurately bill clients.

    • We track expenses such as equipment rentals, subcontractor costs, and travel expenses.

    • Labor costs are calculated based on hours worked by each team member and their respective rates.

    • Materials used are documented and their costs are included in the billing.

    • We ensure all expenses are properly allocat...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Civil power project
  • Q2. Road work farnace CCM
  • Q3. Industrial all project

Interview Preparation Tips

Interview preparation tips for other job seekers - Site layout work as per drawing and centre line marking. Bar bending schedule. Bar chart making. Materials consumption records Estimation and casting. Quality and quantity control. Levelling through auto level.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Power plant whrb induction farnace and water tank
  • Q2. Road work

Interview Preparation Tips

Interview preparation tips for other job seekers - Industrial area road work power plant whrb and farnace rolling mil silo water tank
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Civil engineer 

(2 Questions)

  • Q1. What is concrete
  • Ans. 

    Concrete is a composite material made of cement, water, aggregates, and sometimes additives, used in construction.

    • Concrete is a versatile and durable material used in construction for buildings, bridges, roads, and more

    • It is made by mixing cement, water, and aggregates like sand and gravel

    • Additives can be included to enhance specific properties of the concrete, such as strength or workability

    • Once mixed, concrete harden...

  • Answered by AI
  • Q2. What is BBS & Components
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in a construction project.

    • BBS includes details such as bar mark, type of bar, diameter, length, shape, and quantity.

    • It helps in estimating the quantity of steel required for the project.

    • BBS is essential for ensuring the structural integrity and strength of the building.

    • Components of BBS include bending shapes, cutting length,...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. About all my skill and education knowledge and what is strength about construction work.
  • Q2. In my education background
  • Q3. About my last job
  • Q4. Additional knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Be conference and believe your self because every job not your last chance this is fully about your knowledge and if you attend any interview than chance to know about another thik in your line
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. One meter how much inch
  • Ans. 

    One meter is equal to 39.37 inches.

    • One meter is equivalent to 100 centimeters.

    • One inch is equal to 2.54 centimeters.

    • To convert meters to inches, multiply by 39.37 (100 * 2.54).

  • Answered by AI
  • Q2. Steel density value and units
  • Ans. 

    Steel density is typically around 7.85 g/cm^3.

    • Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary depending on the specific alloy composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Explain your privious jobs about your response
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(11 Questions)

  • Q1. What is the Least Count of dumpy level Staff Reading ?
  • Ans. 

    The least count of a dumpy level staff reading is typically 0.01 ft or 1 mm.

    • The least count is the smallest measurement that can be read on the scale of the dumpy level staff.

    • For most dumpy levels, the least count is 0.01 ft or 1 mm.

    • This means that the dumpy level can measure differences in elevation as small as 0.01 ft or 1 mm.

  • Answered by AI
  • Q2. Why Concrete Cover is provided for reinforcement ?
  • Ans. 

    Concrete cover is provided for reinforcement to protect it from corrosion, fire, and other environmental factors.

    • Concrete cover protects reinforcement from corrosion by preventing exposure to moisture and aggressive chemicals.

    • It provides fire resistance by acting as a barrier between the reinforcement and the fire.

    • Concrete cover helps in maintaining the bond between reinforcement and concrete, ensuring structural integ...

  • Answered by AI
  • Q3. What is tha volume of 50 kg bag of cement ?
  • Q4. What is Dessity of steel ?
  • Q5. What is tha size of concrete Cube ?
  • Q6. What is tha Role of a Civil Engineer at Site ?
  • Ans. 

    Civil engineers at site are responsible for overseeing construction projects, ensuring they are completed safely, on time, and within budget.

    • Supervising construction activities to ensure compliance with design specifications and safety standards

    • Managing resources and materials efficiently to meet project deadlines

    • Collaborating with architects, contractors, and other stakeholders to resolve any issues that may arise

    • Cond...

  • Answered by AI
  • Q7. What is tha minimum concrete grade for RCC work ?
  • Ans. 

    Minimum concrete grade for RCC work is M20.

    • Minimum concrete grade for RCC work is M20 as per IS 456:2000.

    • Higher grades like M25, M30, M35, etc. can also be used depending on structural requirements.

    • Concrete grades indicate the compressive strength of concrete after 28 days of curing.

    • Higher grades are used for structures requiring higher strength like bridges, high-rise buildings, etc.

  • Answered by AI
  • Q8. What is rha dsssity of Unit wait of cement ?
  • Ans. 

    The density of unit weight of cement is typically around 1440 kg/m^3.

    • The density of unit weight of cement is commonly around 1440 kg/m^3.

    • This value can vary slightly depending on the type and brand of cement.

    • Density is a measure of mass per unit volume, in this case, kilograms per cubic meter.

  • Answered by AI
  • Q9. What is tha Grade of Cement ?
  • Q10. What is the Slump value of concrete for Normal RCC work
  • Ans. 

    The slump value of concrete for Normal RCC work is typically between 25-75 mm.

    • The slump value of concrete for Normal RCC work is usually around 50 mm.

    • The slump value can vary based on the specific requirements of the project and the mix design.

    • A higher slump value indicates a more workable concrete mix, while a lower slump value may be used for specialized applications.

    • It is important to test the slump value of concret...

  • Answered by AI
  • Q11. How many cube filled for 1 cubic meter concrete ?

Interview Preparation Tips

Topics to prepare for Rohan Builders Civil Engineer interview:
  • Building Structure
  • Building Construction
  • Site work
  • Billing
Interview preparation tips for other job seekers - This is a good company bit don't trust any one , one day this company will remove you like me

Surveyor Interview Questions & Answers

user image Anonymous

posted on 19 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Structure details & surveying

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Rohan Builders?
Ask anonymously on communities.

Rohan Builders Interview FAQs

How many rounds are there in Rohan Builders interview?
Rohan Builders interview process usually has 1-2 rounds. The most common rounds in the Rohan Builders interview process are Technical, HR and Resume Shortlist.
How to prepare for Rohan Builders interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rohan Builders. The most common topics and skills that interviewers at Rohan Builders expect are Civil Engineering, Project Management, Construction, Real Estate and AutoCAD.
What are the top questions asked in Rohan Builders interview?

Some of the top questions asked at the Rohan Builders interview -

  1. If a plot of 54.4 acre is given to you and excavation should happen in benching...read more
  2. What is the Least Count of dumpy level Staff Readin...read more
  3. What is tha volume of 50 kg bag of cemen...read more
How long is the Rohan Builders interview process?

The duration of Rohan Builders interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 70 interview experiences

Difficulty level

Easy 36%
Moderate 60%
Hard 4%

Duration

Less than 2 weeks 69%
2-4 weeks 19%
4-6 weeks 4%
More than 8 weeks 8%
View more
Join Rohan Builders Great Living Engineered

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 148 Interviews
Kalpataru Limited Interview Questions
4.1
 • 143 Interviews
Lodha Group Interview Questions
4.0
 • 140 Interviews
Godrej Properties Interview Questions
3.6
 • 106 Interviews
DLF Interview Questions
3.9
 • 86 Interviews
Colliers India Interview Questions
3.9
 • 76 Interviews
Casagrand Interview Questions
3.8
 • 61 Interviews
View all

Rohan Builders Reviews and Ratings

based on 725 reviews

4.1/5

Rating in categories

4.0

Skill development

3.8

Work-life balance

4.1

Salary

4.1

Job security

4.0

Company culture

3.6

Promotions

3.9

Work satisfaction

Explore 725 Reviews and Ratings
Junior Engineer - Civil

Bangalore / Bengaluru

2-4 Yrs

Not Disclosed

Billing Engineer

Ankleshwar

4-9 Yrs

Not Disclosed

Sr. Business Analyst

Pune

8-11 Yrs

₹ 8-12 LPA

Explore more jobs
Senior Engineer
94 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Safety Officer
77 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Junior Engineer
45 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

Senior Civil Engineer
43 salaries
unlock blur

₹4.5 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.2
Compare

Godrej Properties

3.6
Compare
write
Share an Interview