Rohan Builders Senior QS and Billing Engineer Interview Questions and Answers

Updated 16 Feb 2023

Rohan Builders Senior QS and Billing Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(4 Questions)

  • Q1. If a drawing is given to you then what will be your roles and responsibility after seeing the drawing??
  • Ans. 

    After seeing the drawing, my roles and responsibilities would include interpreting the design, identifying quantities and measurements, estimating costs, and preparing bills of quantities.

    • Interpreting the design and understanding the scope of work

    • Identifying quantities and measurements of materials, labor, and equipment required

    • Estimating costs based on the quantities and market rates

    • Preparing bills of quantities for t...

  • Answered by AI
  • Q2. If a plot of 54.4 acre is given to you and excavation should happen in benching then how will you streamline the measurements of earthwork in cutting & filling??
  • Ans. 

    I will divide the plot into smaller sections and calculate the volume of earthwork required for each section separately.

    • Divide the plot into smaller sections based on the topography and soil type

    • Calculate the volume of earthwork required for each section separately using the formula: Volume = Area x Depth

    • Aggregate the volumes of all sections to get the total volume of earthwork required

    • Use the total volume to estimate ...

  • Answered by AI
  • Q3. How to prepare rolling reconciliation sheet for CEMENT, REINFORCEMENT STEEL & STRUCTURAL STEEL?
  • Ans. 

    Rolling reconciliation sheet for cement, reinforcement steel & structural steel

    • Collect data on the quantity and cost of cement, reinforcement steel, and structural steel used in the project

    • Prepare a table with columns for opening balance, receipts, issues, closing balance, and remarks for each material

    • Update the table regularly with the latest data and calculate the closing balance for each material

    • Compare the closing ...

  • Answered by AI
  • Q4. What are deduction criteria for plastering measurements??
  • Ans. 

    Deduction criteria for plastering measurements include openings, thickness, and wastage.

    • Openings such as doors and windows are deducted from the total area of plastering.

    • Thickness of plastering is also taken into consideration for deductions.

    • Wastage due to uneven surfaces or improper mixing is also deducted.

    • Deductions are calculated as per the standard measurement practices and contract specifications.

    • For example, if t...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you switching from a globally renowned organisation to ROHAN BUILDERS?
  • Ans. 

    I am switching to ROHAN BUILDERS because of their strong reputation in the industry and their focus on innovation and growth.

    • ROHAN BUILDERS has a strong reputation in the industry for delivering high-quality projects on time and within budget.

    • I am attracted to the company's focus on innovation and their commitment to using advanced technologies in construction.

    • ROHAN BUILDERS offers excellent growth opportunities and a ...

  • Answered by AI
  • Q2. When can we expect your joining?
  • Ans. 

    I am available to join immediately.

    • I am ready to start as soon as possible.

    • I can join right away.

    • I am currently not committed to any other project.

    • I am excited to begin working with your team.

    • I can provide any necessary documentation for the joining process.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be genuine and don't give false answers if you don't know something tell the truth.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects.
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations.

Interview Preparation Tips

Interview preparation tips for other job seekers - Proper channel. Naukri. Hr mail.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Contribute & help others!
anonymous
You can choose to be anonymous

Rohan Builders Interview FAQs

How many rounds are there in Rohan Builders Senior QS and Billing Engineer interview?
Rohan Builders interview process usually has 3 rounds. The most common rounds in the Rohan Builders interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Rohan Builders Senior QS and Billing Engineer interview?

Some of the top questions asked at the Rohan Builders Senior QS and Billing Engineer interview -

  1. If a plot of 54.4 acre is given to you and excavation should happen in benching...read more
  2. How to prepare rolling reconciliation sheet for CEMENT, REINFORCEMENT STEEL & S...read more
  3. what are deduction criteria for plastering measurement...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Casagrand

No Interviews

SALARIES

JPMorgan Chase & Co.

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Rohan Builders

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Surya Roshni

No Interviews

Tell us how to improve this page.

Rohan Builders Senior QS and Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Join Rohan Builders Great Living Engineered

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
View all
Rohan Builders Senior QS and Billing Engineer Salary
based on 5 salaries
₹4.2 L/yr - ₹8.5 L/yr
22% less than the average Senior QS and Billing Engineer Salary in India
View more details
Safety Officer
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
48 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview