Filter interviews by
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
This question is unclear and requires more context to provide a proper answer.
Please provide more information about the context of the question.
What is the specific problem or scenario being discussed?
Without additional details, it is difficult to provide a relevant answer.
I applied via Naukri.com
Quality during execution and material inspection at site is ensured through various processes.
Conducting regular inspections and audits to identify any quality issues
Implementing quality control measures to ensure adherence to specifications and standards
Performing material testing and inspection to verify its quality
Using quality management tools and techniques such as statistical process control
Training and educating...
GTP of 5MVA Power Transformers refers to the Guaranteed Technical Particulars.
GTP includes specifications such as rated power, voltage ratio, impedance, and losses.
It is a contractual agreement between the manufacturer and the customer.
GTP ensures that the transformer meets the required performance standards.
For a 5MVA transformer, the GTP would specify details such as 11kV/433V voltage ratio, 6% impedance, and 2.5% lo
DI of Materials stands for Dimensional Inspection of Materials.
DI of Materials is a process of measuring and verifying the dimensions of materials to ensure they meet the required specifications.
It involves using various tools and techniques such as calipers, micrometers, and coordinate measuring machines (CMMs).
DI of Materials is important in industries such as manufacturing, aerospace, and automotive to ensure the qu...
Top trending discussions
posted on 1 Dec 2024
I appeared for an interview in Nov 2024.
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
My favorite song is 'Bohemian Rhapsody' by Queen.
The song was released in 1975 and is a rock opera.
It has a unique structure, combining elements of rock, opera, and ballad.
The lyrics are poetic and thought-provoking, with themes of life, death, and self-reflection.
The song features intricate vocal harmonies and a wide range of musical styles.
It has become a timeless classic and is often regarded as one of the greatest
I appeared for an interview before Mar 2024, where I was asked the following questions.
Quality Assurance Plan (QAP) and Master Software Work (MSW) are essential for ensuring product quality and compliance.
QAP outlines the quality objectives, processes, and responsibilities for a project.
MSW details the software development lifecycle, including phases like requirements, design, implementation, and testing.
Example of QAP: A plan for a new medical device that includes risk management and validation protocol...
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
based on 5 reviews
Rating in categories
Field Engineer
63
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Project Engineer
62
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Deputy Team Leader
52
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Assistant Manager Finance
44
salaries
| ₹2.7 L/yr - ₹6.9 L/yr |
Field Supervisor
43
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem