I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
The BBS of rectangular stirrup, volume of circular column, BBS of circular ring, and definition of TDS are discussed.
BBS of rectangular stirrup involves calculating the total length of all the stirrups used in a rectangular beam or column.
Volume of a circular column can be calculated using the formula: Volume = πr^2h, where r is the radius and h is the height of the column.
BBS of a circular ring involves calculating th...
The capacity of a transit mixer is typically between 6 to 10 cubic meters.
Capacity can vary depending on the size and model of the transit mixer.
Transit mixers used for smaller projects may have a capacity of around 6 cubic meters.
For larger construction projects, transit mixers with a capacity of 10 cubic meters or more are commonly used.
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Check column for verticality
Use a plumb bob to check if the column is perfectly vertical
Measure the distance between the column and a straight edge at different points to check for any deviation
Use a laser level to project a perfectly vertical line on the column and check for any deviation
Check the column with a spirit level to ensure it is perfectly vertical
I identified the reinforcement and type of slab through the provided drawings.
I analyzed the drawings carefully to identify the reinforcement used in the slab.
I also determined the type of slab used, whether it was a one-way or two-way slab.
For example, if the drawings showed a grid of evenly spaced bars running in one direction, it would indicate a one-way slab.
On the other hand, if the bars were spaced in both direct...
Ray Infraprojects interview questions for popular designations
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
based on 6 interviews
Interview experience
based on 27 reviews
Rating in categories
Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager Civil
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Manager 1
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Foreman
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure