I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
The BBS of rectangular stirrup, volume of circular column, BBS of circular ring, and definition of TDS are discussed.
BBS of rectangular stirrup involves calculating the total length of all the stirrups used in a rectangular beam or column.
Volume of a circular column can be calculated using the formula: Volume = πr^2h, where r is the radius and h is the height of the column.
BBS of a circular ring involves calculating th...
The capacity of a transit mixer is typically between 6 to 10 cubic meters.
Capacity can vary depending on the size and model of the transit mixer.
Transit mixers used for smaller projects may have a capacity of around 6 cubic meters.
For larger construction projects, transit mixers with a capacity of 10 cubic meters or more are commonly used.
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Check column for verticality
Use a plumb bob to check if the column is perfectly vertical
Measure the distance between the column and a straight edge at different points to check for any deviation
Use a laser level to project a perfectly vertical line on the column and check for any deviation
Check the column with a spirit level to ensure it is perfectly vertical
I identified the reinforcement and type of slab through the provided drawings.
I analyzed the drawings carefully to identify the reinforcement used in the slab.
I also determined the type of slab used, whether it was a one-way or two-way slab.
For example, if the drawings showed a grid of evenly spaced bars running in one direction, it would indicate a one-way slab.
On the other hand, if the bars were spaced in both direct...
Ray Infraprojects interview questions for popular designations
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 20 Feb 2015
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 10 Sep 2015
I applied via PLACEMENT
based on 6 interviews
Interview experience
based on 28 reviews
Rating in categories
Project Engineer
5
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Junior Engineer
5
salaries
| ₹0.6 L/yr - ₹2.4 L/yr |
Project Manager Civil
5
salaries
| ₹6.8 L/yr - ₹14 L/yr |
HR Manager 1
4
salaries
| ₹4.8 L/yr - ₹5.2 L/yr |
Project Manager
4
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure