i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Aptitude test is of 1 hour and questions were easy to medium
It was 90 mins and went well.
It was 90 mins and went well
What people are saying about Larsen & Toubro Limited
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
Quant, verbal, lrdi
Larsen & Toubro Limited interview questions for designations
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Feb 2024. There was 1 interview round.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
Sand packing is a process of filling voids or cavities with sand to provide support or stability.
Sand packing is commonly used in construction to support structures or foundations.
It can also be used in oil and gas wells to prevent collapse or leakage.
Sand packing is done by pouring or pumping sand into the void until it is filled completely.
Sand has abrasive properties due to its rough texture and hardness.
Sand particles have sharp edges that can scratch surfaces
Sandpaper is made by coating paper with abrasive sand particles
Sand blasting is a process used to clean or roughen surfaces using high-pressure sand particles
Gravel pack procedure involves placing gravel or sand in the wellbore to prevent formation sand from entering the wellbore.
Gravel pack is used in oil and gas wells to enhance well productivity by preventing sand production.
The procedure involves running a screen into the wellbore and then pumping gravel or sand into the annulus between the screen and the formation.
Gravel pack placement can be done using different techn...
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
Medium tough level test, strong basics required in all fields of civil.
A float can be made zero in critical path tasks by reducing the duration of non-critical tasks.
Identify non-critical tasks that have float
Shorten the duration of non-critical tasks to eliminate float
Focus on tasks that have the highest float value to reduce overall project duration
Baseline schedule is the original planned schedule for a project, used as a reference point for tracking progress.
Baseline schedule is created at the beginning of a project to establish the original plan for project activities and timelines.
It serves as a benchmark for comparing actual progress and identifying deviations from the original plan.
Changes to the baseline schedule may require formal approval and documentati...
Aptitude test is quite easy .60 minutes to solve 60 questions
Interview experience
based on 29 reviews
Rating in categories
Assistant Manager
3.8k
salaries
| ₹6.4 L/yr - ₹20.2 L/yr |
Senior Engineer
3.4k
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹6 L/yr - ₹16.6 L/yr |
Engineer
1.2k
salaries
| ₹1.6 L/yr - ₹9.3 L/yr |
Manager
1.1k
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra