I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Check column for verticality
Use a plumb bob to check if the column is perfectly vertical
Measure the distance between the column and a straight edge at different points to check for any deviation
Use a laser level to project a perfectly vertical line on the column and check for any deviation
Check the column with a spirit level to ensure it is perfectly vertical
I identified the reinforcement and type of slab through the provided drawings.
I analyzed the drawings carefully to identify the reinforcement used in the slab.
I also determined the type of slab used, whether it was a one-way or two-way slab.
For example, if the drawings showed a grid of evenly spaced bars running in one direction, it would indicate a one-way slab.
On the other hand, if the bars were spaced in both direct...
Top trending discussions
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 8 Aug 2022
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 11 May 2018
posted on 12 May 2018
I was interviewed before Mar 2020.
posted on 27 Apr 2022
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 27 Feb 2022
I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.
About experience and scope of work current organization and civil engineering related questions.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
based on 1 review
Rating in categories
Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager Civil
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Manager 1
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Foreman
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure