I appeared for an interview in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
What is the colume
The vertical part of the building and base of the slab, distribution of load
A footing is a structural element that transfers the load from a building to the soil below.
Footing is typically made of concrete and is wider than the foundation walls it supports
Types of footings include spread footings, mat foundations, and pile foundations
Footing design is crucial for ensuring the stability and safety of a structure
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Anchorage of reinforcing bars refers to the method of securing the bars in concrete to ensure proper transfer of forces.
Anchorage length is the portion of the reinforcing bar embedded in concrete to transfer forces effectively.
Proper anchorage is crucial for the structural integrity of the concrete element.
Anchorage can be achieved through hooks, bends, or mechanical anchorage devices.
Development length is the minimum ...
The minimum development length in a column is the length required for the full transfer of stress from the steel reinforcement to the concrete.
The minimum development length is typically specified by design codes or standards.
It is influenced by factors such as the diameter of the reinforcement, concrete strength, and bond characteristics.
For example, in ACI 318, the minimum development length for a #5 bar is 12 inches...
Embedded length is the length of reinforcement bar embedded in concrete, while development length is the length required for the bar to transfer its load to the concrete.
Embedded length is the portion of the reinforcement bar that is embedded in concrete to provide structural support.
Development length is the length of reinforcement required for the bar to transfer its load to the concrete without slippage.
Embedded len...
Construction hazards include falls, electrical hazards, struck-by hazards, caught-in/between hazards, and hazardous materials.
Falls from heights
Electrical hazards
Struck-by hazards (e.g. falling objects)
Caught-in/between hazards (e.g. machinery)
Hazardous materials exposure
Trip and fall hazards include uneven surfaces, cluttered walkways, poor lighting, and slippery floors.
Uneven surfaces such as cracked sidewalks or loose floor tiles
Cluttered walkways with obstacles like cables or boxes
Poor lighting in dimly lit areas
Slippery floors from spills or wet surfaces
Ramky Infrastructure interview questions for popular designations
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
The overall plant process involves controlling temperature, pressure, and level through setpoints, along with following specific start-up and shutdown procedures.
The plant process involves various unit operations such as mixing, reaction, separation, and purification.
Temperature, pressure, and level are controlled using instruments like thermocouples, pressure transmitters, and level sensors.
Setpoints are predetermined...
DCS operation involves monitoring and controlling processes through a centralized control system.
Monitoring process parameters
Adjusting control setpoints
Responding to alarms and abnormalities
Performing routine maintenance on DCS equipment
Troubleshooting system issues
Collaborating with other operators and engineers
Get interview-ready with Top Ramky Infrastructure Interview Questions
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
The responsibilities of Quality Control include ensuring product quality, following QAP and QMP, preventing leakage, taking precautions for waterproofing, using codes for mix design, understanding self compact concrete, and being familiar with Mivan Shuttering.
Ensuring product quality
Following Quality Assurance Plan (QAP) and Quality Management Plan (QMP)
Preventing leakage
Taking precautions for waterproofing
Using codes...
Documentation refers to the process of recording and organizing information in a systematic manner.
Documentation involves creating and maintaining written records of processes, procedures, and policies.
It includes capturing and storing data, such as test results, reports, and specifications.
Documentation ensures traceability and provides a reference for future use.
It helps in maintaining quality standards, compliance, ...
FE 500 and FE 500D are both types of steel used in construction, but they have different properties.
FE 500 has a minimum yield strength of 500 N/mm², while FE 500D has a minimum yield strength of 500 N/mm² with higher elongation.
FE 500D is more ductile and has better seismic resistance compared to FE 500.
FE 500D is recommended for areas prone to earthquakes or seismic activities.
FE 500D steel has a higher percentage of...
The process of a Water Treatment Plant (WTP) involves several stages to purify water for safe consumption.
Coagulation and Flocculation: Chemicals are added to water to remove suspended particles.
Sedimentation: The water is allowed to settle, and the solids are removed.
Filtration: Water passes through various filters to remove smaller particles.
Disinfection: Chlorine or other disinfectants are added to kill harmful micr...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo
I am available to join immediately.
I can start working as soon as possible.
I am flexible with the joining date.
I am ready to begin work immediately.
I can join within a week of receiving the offer.
I am excited to start working on the specified joining date.
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer about my intention to leave and they are aware of my notice period.
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
Client bills are finalized by reviewing project scope, quantities, rates, and any variations before preparing the final invoice.
Review project scope and ensure all deliverables are included in the bill
Check quantities of materials and services provided against the agreed upon contract
Verify rates for each item and ensure they match the agreed upon pricing
Account for any variations or changes to the original scope of wo
Claiming non scheduled items involves identifying the item, determining its cost, submitting a claim with supporting documentation, and negotiating with the client or contractor.
Identify the non scheduled item in the project scope
Determine the cost of the item including labor, materials, and any other associated expenses
Submit a claim to the client or contractor detailing the non scheduled item and its cost
Provide supp...
Rates for particular item of work are analysed by comparing with historical data, market rates, and considering factors like location, complexity, and materials.
Compare rates with historical data for similar projects
Research current market rates for the specific item of work
Consider factors such as location, complexity, and materials used in the work
Consult with suppliers and subcontractors for pricing information
Use s...
I appeared for an interview before Mar 2023.
IS Code 1200 Part 1 is used for quantity survey for earth work.
IS Code 1200 Part 1 provides guidelines for measurement and billing of earthwork in civil engineering projects.
It includes methods for calculating quantities of excavation, backfilling, and earthwork in embankments.
The code also covers specifications for the preparation of bills of quantities for earthwork.
Engineers and contractors refer to IS Code 1200 Par...
Top trending discussions
Some of the top questions asked at the Ramky Infrastructure interview for experienced candidates -
The duration of Ramky Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 13 interviews
Interview experience
based on 550 reviews
Rating in categories
Assistant Manager
109
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Engineer
97
salaries
| ₹2.2 L/yr - ₹4.9 L/yr |
Senior Engineer
75
salaries
| ₹2.9 L/yr - ₹6.7 L/yr |
Deputy Manager
59
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
56
salaries
| ₹5.1 L/yr - ₹9.2 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon