Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Q2. Do you use drawing and technology in your work?
  • Q3. Are you doing to maintain time in your life
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Q2. What methods do you use to verify information?

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - HR 

(2 Questions)

  • Q1. Foundation footing how much cover required
  • Ans. 

    Foundation footing requires a minimum cover of 50mm to 75mm for reinforcement protection.

    • Minimum cover of 50mm to 75mm is required for foundation footing to protect the reinforcement from corrosion and provide adequate strength.

    • The cover requirement may vary based on the type of soil, environmental conditions, and structural design.

    • Proper cover ensures durability and stability of the foundation.

    • In some cases, additiona...

  • Answered by AI
  • Q2. Shuttering column up to FFL how much cover required
  • Ans. 

    The cover required for shuttering column up to FFL depends on the type of concrete being used and the environmental conditions.

    • Cover required for shuttering column up to FFL typically ranges from 25mm to 50mm.

    • Factors such as type of concrete mix, exposure conditions, and structural requirements can influence the required cover.

    • For example, in harsh environmental conditions or high-strength concrete, a higher cover may ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - N/A
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Minimum cement contains in RCC structure
  • Ans. 

    The minimum cement content in RCC structure is typically around 300 kg/m3.

    • Minimum cement content is usually specified by structural engineers based on design requirements.

    • Higher cement content may be required for structures in aggressive environments or with special design considerations.

    • The minimum cement content is important for achieving the desired strength and durability of the concrete mix.

  • Answered by AI
  • Q2. In slump cone test what is the shape of slump
  • Ans. 

    The shape of slump in a slump cone test is typically conical.

    • The shape of slump is conical, with the top being wider than the base.

    • The height of the slump is measured to determine the workability of the concrete.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

    • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Lapping zone of column
  • Ans. 

    Lapping zone of column is where two reinforcement bars overlap to ensure continuity of load transfer.

    • Lapping zone should be at least 50 times the diameter of the smaller bar away from the face of the support.

    • Proper lapping length is crucial for structural integrity and load distribution.

    • Lapping should be staggered in multiple layers for better strength.

    • Ensure proper cover and clear spacing around the lapping zone to pr

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Why joining in this group
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job

Ramky Infrastructure Interview FAQs

How many rounds are there in Ramky Infrastructure Site Execution Engineer interview?
Ramky Infrastructure interview process usually has 1 rounds. The most common rounds in the Ramky Infrastructure interview process are Technical.

Tell us how to improve this page.

Ramky Infrastructure Site Execution Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 711 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
View all
Ramky Infrastructure Site Execution Engineer Salary
based on 9 salaries
₹2.4 L/yr - ₹4.5 L/yr
29% less than the average Site Execution Engineer Salary in India
View more details
Assistant Manager
100 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Engineer
95 salaries
unlock blur

₹2.2 L/yr - ₹4.9 L/yr

Senior Engineer
62 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Deputy Manager
57 salaries
unlock blur

₹5.9 L/yr - ₹12 L/yr

Senior Assistant Manager
51 salaries
unlock blur

₹5.2 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Ramky Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview