Filter interviews by
I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.
posted on 18 Nov 2024
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.
Building trust through transparency and honesty
Understanding client needs and preferences
Providing personalized service tailored to each client
Maintaining open communication throughout the process
posted on 27 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
There are several types of waterproofing methods used in construction to protect buildings from water damage.
Membrane waterproofing
Cementitious waterproofing
Crystalline waterproofing
Bituminous waterproofing
Polyurethane liquid membrane waterproofing
The laying process of Italian marble involves preparing the surface, applying adhesive, placing the marble, and grouting. Dry cladding involves fixing marble without water, while wet cladding involves using water during installation.
Prepare the surface by cleaning and leveling it
Apply adhesive on the back of the marble slab
Place the marble slab carefully on the surface
Grout the joints to fill in any gaps
Dry cladding do...
My strength lies in my ability to analyze complex structural problems and come up with innovative solutions.
Strong analytical skills to identify key issues
Ability to think creatively to find unique solutions
Experience in using advanced structural analysis software
Effective communication skills to collaborate with team members and clients
I overcome my weaknesses by acknowledging them, seeking feedback, setting goals for improvement, and continuously working on them.
Acknowledge the weakness and accept it as a part of personal growth
Seek feedback from mentors, colleagues, or supervisors to gain different perspectives
Set specific and achievable goals for improvement
Develop a plan or strategy to work on the weakness consistently
Reflect on progress regularl
I was interviewed before Dec 2020.
Section 194C of TDS sets the limit for deduction rates.
Section 194C of TDS pertains to payments to contractors/sub-contractors.
The current rate of TDS deduction under section 194C is 1% for individual or HUF payers and 2% for others.
If the payee does not provide PAN, the TDS rate under section 194C is 20%.
The threshold limit for TDS deduction under section 194C is Rs. 30,000 for a single payment and Rs. 1,00,000 for ag
GST Input & Output Adjustment Entry is used to correct errors in reporting GST liabilities and claiming input tax credits.
GST Input Adjustment Entry is used to correct errors in claiming input tax credits for purchases subject to GST.
GST Output Adjustment Entry is used to correct errors in reporting GST liabilities for sales subject to GST.
These adjustments are necessary to ensure accurate reporting and compliance with...
GST input is shown on the asset side of the balance sheet.
GST input is considered as an asset because it represents the amount of GST paid on purchases that can be claimed back.
It is typically shown under current assets if it is expected to be recovered within one year.
For example, if a company has paid $1,000 in GST on purchases, it would show as GST input $1,000 under current assets on the balance sheet.
posted on 9 Aug 2023
The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.
Loss of structural integrity in packaging
Increased risk of contamination or tampering
Difficulty in handling and storage of products
Potential impact on product shelf life and quality
Need for alternative support measures or redesign of packaging
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.
Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.
The timing of pour strips will depend on the size and complexity of the pr...
Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.
Use adjustable props to support the slab and pourstrip while removing the shuttering.
Install beams to transfer the load from the slab to the props, allowing the supports to be removed.
Ensure proper alignment and spacing of props and beams to distribute the load evenly.
Regularly check and adjust the props and...
Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.
Perform slump test to ensure proper consistency of concrete
Check air content to ensure proper durability and workability
Monitor temperature to prevent issues like thermal cracking
At column and slab junction, check reinforcement p...
posted on 19 Aug 2023
I applied via Naukri.com and was interviewed in Jul 2023. There were 5 interview rounds.
RERA appeal provisions allow for challenging decisions of Real Estate Regulatory Authority. Handled cases in NGT related to environmental issues.
RERA appeal provisions allow for challenging decisions of Real Estate Regulatory Authority
NGT cases involved environmental issues such as pollution, deforestation, etc.
NGT cases required expertise in environmental laws and regulations
Game based assessment
based on 7 reviews
Rating in categories
Store Incharge
3
salaries
| ₹3.3 L/yr - ₹3.3 L/yr |
Lulu International Shopping Mall
Signature Global
HM Group
Pittie Group