Filter interviews by
Top trending discussions
posted on 5 Jul 2017
I was interviewed in Jul 2017.
Experienced Quality Engineer with a background in manufacturing and process improvement.
Bachelor's degree in Engineering
Certified Six Sigma Black Belt
Proficient in statistical analysis tools like Minitab
Led cross-functional teams to implement quality initiatives
Experience in root cause analysis and corrective action
I have a Bachelor's degree in Mechanical Engineering from XYZ University.
Bachelor's degree in Mechanical Engineering
Graduated from XYZ University
Specialized in quality control and assurance
posted on 29 Nov 2022
I applied via Campus Placement and was interviewed before Nov 2021. There were 3 interview rounds.
General aptitude test
Like reasoning and general knowledge maths. And english
Material quantity in a wall can be calculated by determining the volume of the wall and multiplying it by the density of the material.
Calculate the volume of the wall by multiplying its length, width, and height
Determine the density of the material being used
Multiply the volume of the wall by the density of the material to get the material quantity
For example, if the wall is 10 feet long, 8 feet high, and 0.5 feet thic...
posted on 24 May 2024
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Normal question karte ha 20 to 30 minutes Tak interview chata hai. Uske baad ek exam lete ha .
posted on 19 Feb 2024
posted on 6 Apr 2023
I was interviewed before Apr 2022.
Quality assurance is a systematic process of ensuring that products or services meet specified requirements and standards.
Quality assurance involves creating and implementing processes and procedures to prevent defects and errors.
It includes activities such as quality planning, quality control, and quality improvement.
Quality assurance aims to provide confidence to stakeholders that the desired level of quality will be...
The minimum grade of concrete depends on the intended use and structural requirements.
The minimum grade of concrete is typically specified by the engineer or architect based on the project's needs.
For general construction purposes, the minimum grade of concrete is often specified as M20, which means it has a compressive strength of 20 megapascals (MPa) after 28 days.
However, for specialized applications such as high-ri...
posted on 29 Nov 2022
Online aptitude test will conduct
posted on 1 Oct 2022
posted on 26 Sep 2022
Quality of cement, aggregate, and sand is crucial for the strength and durability of concrete.
Cement should have a consistent fineness and chemical composition.
Aggregate should be clean, hard, and free from organic matter.
Sand should be well-graded and free from impurities.
Proper testing and quality control measures should be in place to ensure the quality of materials.
The quality of these materials directly affects th...
posted on 26 Oct 2023
I applied via Job Fair and was interviewed before Oct 2022. There were 2 interview rounds.
Step and lip are features commonly found in machined parts, with step being a change in height between two surfaces and lip being a protruding edge.
Step refers to a change in height between two surfaces on a part.
Lip is a protruding edge or ridge on a part.
Steps and lips are important features to consider in quality engineering to ensure proper fit and function of parts.
Examples: A step on a shaft where the diameter ch...
IS code for RMC plant calibration is IS 4926:2003
IS 4926:2003 is the Indian Standard code for Ready Mixed Concrete (RMC) plant calibration
The code specifies the procedure for calibration of RMC plants to ensure quality and consistency in concrete production
Calibration involves checking and adjusting the equipment used in the RMC plant to meet the specified requirements
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Safety Officer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Sobha
Prestige Group
Godrej Properties
Larsen & Toubro Limited