Upload Button Icon Add office photos

Filter interviews by

Consort Builders Interview Questions, Process, and Tips

Updated 9 Nov 2024

Top Consort Builders Interview Questions and Answers

View all 13 questions

Consort Builders Interview Experiences

Popular Designations

9 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. You can interview technical questions
  • Q2. You can interview sone technical questions
Round 2 - HR 

(1 Question)

  • Q1. Can you sellary give me

Senior Site Engineer Interview Questions asked at other Companies

Q1. How many days will take 1st Aluform mockup Concreting
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(8 Questions)

  • Q1. What is your work in previous company ?
  • Q2. Tell me about rolling margin of steel?
  • Ans. 

    Rolling margin of steel refers to the difference between the theoretical weight of steel and the actual weight after rolling.

    • Rolling margin is calculated by subtracting the actual weight of rolled steel from the theoretical weight.

    • It accounts for factors like material loss during the rolling process and variations in density.

    • Understanding rolling margin is important for accurate billing and cost estimation in steel pro

  • Answered by AI
  • Q3. Steel and cement Reconciliation?
  • Q4. Good knowledge in foot and inche measurment for Punjab Site.
  • Q5. What is diffence between OHC and Wege Excalation?
  • Ans. 

    OHC stands for Over Head Charges while Wege Escalation is a term used in construction projects.

    • OHC refers to additional charges incurred during a project that are not directly related to labor or materials

    • Wege Escalation refers to the increase in costs due to delays or changes in the project timeline

    • OHC can include expenses like equipment rental, permits, or insurance

    • Wege Escalation can occur when there are unexpected ...

  • Answered by AI
  • Q6. Good knowlege of DAR and there veriables.
  • Q7. Mode of measurment of brick work, shuttering, Scaffolding, plaster, and painting.
  • Ans. 

    Measurement of brick work, shuttering, scaffolding, plaster, and painting is typically done in square meters or cubic meters depending on the item.

    • Brick work is measured in square meters (m²)

    • Shuttering is measured in square meters (m²)

    • Scaffolding is measured in cubic meters (m³)

    • Plaster is measured in square meters (m²)

    • Painting is measured in square meters (m²)

  • Answered by AI
  • Q8. Good knowledge of IS 1200 for billing and Quantity Surveyor.

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)

Civil foreman finishing work Interview Questions & Answers

user image Anonymous

posted on 23 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. What is a RCC concrit Reshu
  • Ans. 

    RCC concrit Reshu is a type of concrete mix used in construction, typically with a high strength and durability.

    • RCC stands for Reinforced Cement Concrete

    • Concrit Reshu is a type of concrete mix with specific proportions of cement, sand, aggregates, and water

    • It is commonly used in construction for structures that require high strength and durability, such as bridges, dams, and high-rise buildings

  • Answered by AI
  • Q2. Plaster work cement send Reshu
  • Q3. Gan merter who many cumfit
  • Q4. One cum what many stel
  • Q5. One bag cement volume
  • Ans. 

    One bag of cement typically has a volume of 0.035 cubic meters.

    • One bag of cement is usually 50 kg in weight.

    • The volume of one bag of cement is approximately 0.035 cubic meters.

    • This volume may vary slightly depending on the type of cement and its density.

  • Answered by AI

I was interviewed in Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Discussion on mode of measurement.
  • Q2. Few question from autocad, like superimposed.
Round 3 - HR 

(1 Question)

  • Q1. Negotiate with Slaary

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidate must know about the mode of measurements and basic knowledge about construction materials. He must know about Autocad 2D, will be the additional benefit.

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Consort Builders interview questions for popular designations

 Quality Engineer

 (2)

 Executive/ Sr Executive - Administration

 (1)

 Graduate Engineer Trainee (Get)

 (1)

 Project Planning Manager

 (1)

 Senior Billing Engineer

 (1)

 Senior Site Engineer

 (1)

 Trainee

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is baseline?
  • Ans. 

    Baseline is the original project plan against which actual progress is measured.

    • Baseline is the starting point or reference point for a project.

    • It includes the original scope, schedule, and cost of the project.

    • Any changes to the baseline require formal approval and documentation.

    • Baseline helps in tracking and comparing actual progress against the planned progress.

    • Example: If the baseline schedule was to complete a task...

  • Answered by AI
  • Q2. What is extra item?
  • Ans. 

    An extra item is an additional item that is not originally included or planned for.

    • Extra items can increase project costs and timelines.

    • It is important to carefully evaluate the necessity of extra items before adding them to the project.

    • Examples of extra items include additional features, functionalities, or resources that were not part of the initial project scope.

  • Answered by AI
  • Q3. What is idle charges?
  • Ans. 

    Idle charges refer to costs incurred due to equipment or resources being unused or idle.

    • Idle charges can occur when equipment is rented but not used, leading to wasted money.

    • Idle charges can also occur when employees are paid for time they spend idle or not working efficiently.

    • To avoid idle charges, project managers should closely monitor resource utilization and adjust schedules accordingly.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why job change?
  • Q2. What increase do you expect in salary?

Skills evaluated in this interview

Project Planning Manager Interview Questions asked at other Companies

Q1. What is project management and how it will applied for Blast Furnace Construction
View answer (1)

Trainee Interview Questions & Answers

user image Anonymous

posted on 25 Apr 2021

I applied via Campus Placement and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Projects
  • Q2. Technical questions from favorites subjects

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically correct and motivated

Trainee Interview Questions asked at other Companies

Q1. Ques1: There is a big file of words which is dynamically changing. We are continuously adding some words into it. How would you keep track of top 10 trending words at each moment? Ques2:Write a function that returns the length of the longes... read more
View answer (2)

Jobs at Consort Builders

View all

I applied via Recruitment Consultant and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Why would you like to join us?
  • Ans. 

    I would like to join because of the company's strong reputation, growth opportunities, and alignment with my skills and values.

    • Strong reputation: The company has a solid track record and is highly regarded in the industry.

    • Growth opportunities: The company offers potential for career advancement and professional development.

    • Alignment with skills and values: The company's mission, values, and work culture resonate with m...

  • Answered by AI
  • Q2. Why you are leaving your current organization?
  • Q3. Do you feel panic in unwanted situations?
  • Ans. 

    Yes

    • Yes, I do feel panic in unwanted situations.

    • However, I have learned to manage and control my panic through various techniques.

    • For example, I practice deep breathing exercises to calm myself down and think rationally.

    • I also make sure to gather all the necessary information and analyze the situation before reacting.

    • Additionally, I prioritize tasks and create contingency plans to handle unexpected situations.

    • Overall, w...

  • Answered by AI
  • Q4. Share your last organizational experience In a few words.

Interview Preparation Tips

Interview preparation tips for other job seekers - I would like to ask everyone that be confidence. No need to take any kind of pressure. U have to absorb the pressure rather to take on your head.
Have a nice 😎 ✈ day.

Executive/ Sr Executive - Administration Interview Questions asked at other Companies

Q1. Imagine there are 7 people in the room and there are 7 apples in the basket. Everyone took one apple still one left in the basket. How?
View answer (2)

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Instruments code in use lab
  • Ans. 

    The instruments code in use in the lab refers to the unique identification numbers assigned to the equipment used for testing and analysis.

    • Instruments code helps in tracking and identifying specific equipment.

    • It ensures traceability and accountability in the lab.

    • Examples of instruments code include serial numbers, barcodes, or RFID tags.

  • Answered by AI
  • Q2. Testing and specifications codes

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience in life jobs interview in civil construction

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

I applied via Referral and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Dia of steel bars available in market
  • Ans. 

    The diameter of steel bars available in the market varies depending on the type and application.

    • The most common diameters for construction steel bars are 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 25mm, and 32mm.

    • For industrial applications, steel bars can range from 3mm to 100mm in diameter.

    • The diameter of steel bars can also vary based on the manufacturing process and the specific requirements of the customer.

    • The American Soci...

  • Answered by AI
  • Q2. Grade of concrete
  • Ans. 

    Grade of concrete refers to its strength and is determined by its compressive strength at 28 days.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • The number represents the compressive strength of the concrete in megapascals (MPa).

    • For example, M20 grade concrete has a compressive strength of 20 MPa.

    • Higher grade concrete is used for structures that require greater strength, such as bridges a...

  • Answered by AI
  • Q3. M25 meaning
  • Q4. Cement grade
  • Q5. Cement is code and testing
  • Ans. 

    Cement is a material that requires code and testing to ensure quality and safety.

    • Cement codes ensure that the material meets certain standards and specifications.

    • Testing is done to check the strength, durability, and other properties of cement.

    • Quality control measures are put in place to ensure that the cement is consistent and meets the required standards.

    • Examples of cement codes include ASTM C150 and EN 197.

    • Testing m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be professional and give genuine answers

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions on PPC
  • Q2. Approach in handling real estate clients
  • Ans. 

    I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.

    • Building trust through transparency and honesty

    • Understanding client needs and preferences

    • Providing personalized service tailored to each client

    • Maintaining open communication throughout the process

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Casual discussion on technical skills

Interview Preparation Tips

Interview preparation tips for other job seekers - They processed my profile even after knowing that it was 60 days and after going through 2 rounds of interview, they just rejected me saying they're looking for an immediate joiner. This isn't cool considering I went f2f round which is 30kms far.

Consort Builders Interview FAQs

How many rounds are there in Consort Builders interview?
Consort Builders interview process usually has 2 rounds. The most common rounds in the Consort Builders interview process are Technical, HR and Resume Shortlist.
How to prepare for Consort Builders interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Consort Builders. The most common topics and skills that interviewers at Consort Builders expect are Bar Bending Schedule, High Rise Building, MS Office, Quantity Surveying and Attendance Management.
What are the top questions asked in Consort Builders interview?

Some of the top questions asked at the Consort Builders interview -

  1. What is diffence between OHC and Wege Excalati...read more
  2. Mode of measurment of brick work, shuttering, Scaffolding, plaster, and paintin...read more
  3. Tell me about rolling margin of ste...read more

Tell us how to improve this page.

Consort Builders Interview Process

based on 6 interviews

Interview experience

4.8
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Consort Builders Reviews and Ratings

based on 77 reviews

4.4/5

Rating in categories

4.1

Skill development

3.8

Work-life balance

4.1

Salary

4.0

Job security

3.9

Company culture

3.7

Promotions

3.9

Work satisfaction

Explore 77 Reviews and Ratings
Time Keeper

Mohali,

Chandigarh

+4

₹ 2-2.25 LPA

Billing Engineer

Mohali

3-7 Yrs

₹ 4.25-6 LPA

Explore more jobs
Safety Officer
21 salaries
unlock blur

₹3 L/yr - ₹4.3 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Civil Engineer
9 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Billing Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹8.4 L/yr

Assistant Manager
7 salaries
unlock blur

₹5.1 L/yr - ₹10 L/yr

Explore more salaries
Compare Consort Builders with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview