Filter interviews by
The CAR policy refers to the policy regarding the use of company-owned vehicles.
CAR stands for Company Automobile Reimbursement
The policy outlines guidelines for the use of company vehicles, including maintenance, insurance, and reporting procedures
Employees may be required to follow specific rules such as keeping mileage logs or obtaining approval for personal use of company vehicles
An NP2 pipe is a type of reinforced concrete pipe commonly used in drainage systems.
NP2 pipes are made of reinforced concrete, making them strong and durable.
They are commonly used in drainage systems to transport water and sewage.
NP2 pipes come in various sizes and lengths to accommodate different project needs.
The shuttering factor is the percentage of total build up area that is covered by formwork during construction.
Shuttering factor is typically around 0.05 to 0.1 for residential buildings.
It is used to calculate the quantity of formwork needed for construction.
For example, if the total build up area is 1000 sqft and the shuttering factor is 0.1, then 100 sqft of formwork will be required.
The BOCW Act stands for Building and Other Construction Workers Act, which aims to regulate the employment and working conditions of construction workers in India.
The BOCW Act was enacted in 1996 to ensure the welfare of construction workers and regulate their working conditions.
It requires employers to register construction workers, provide them with safety equipment, and ensure timely payment of wages.
The Act also ma...
The maximum quantity of fly ash in M25 concrete is typically around 25% of the total cementitious material content.
Fly ash is commonly used as a partial replacement for cement in concrete mixes to improve workability, durability, and reduce environmental impact.
In M25 concrete, the maximum recommended percentage of fly ash is usually around 25% of the total cementitious material content.
Using fly ash in concrete mixes ...
Pop and gypsum plaster are both types of plaster used in construction, but they have different compositions and properties.
Pop (plaster of Paris) is made from gypsum, while gypsum plaster is made from calcium sulfate dihydrate.
Pop sets quickly and is commonly used for small repairs and crafts, while gypsum plaster sets more slowly and is used for larger construction projects.
Gypsum plaster is more durable and has bette...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars to be used in construction.
Calculate the quantity of steel required based on structural drawings
Prepare a detailed list of reinforcement bars with sizes, shapes, and quantities
Include information on cutting length, bending shape, and placement of bars
Ensure accuracy and compliance with structural design requirements
Use software tools li
Types of drawing include architectural drawings, engineering drawings, and technical drawings.
Architectural drawings: Plans, elevations, sections, and details of buildings and structures.
Engineering drawings: Mechanical, electrical, civil, and structural drawings for construction and manufacturing.
Technical drawings: Diagrams, schematics, and blueprints used for technical documentation and communication.
Types of bars include reinforcement bars, tension bars, compression bars, and stirrups.
Reinforcement bars are used to strengthen concrete structures.
Tension bars are used to resist tension forces in structures.
Compression bars are used to resist compression forces in structures.
Stirrups are used to provide lateral support to reinforcement bars in beams and columns.
Different types of mix include concrete mix, mortar mix, and asphalt mix.
Concrete mix: used for construction projects, typically made of cement, sand, and gravel
Mortar mix: used for masonry work, made of cement, sand, and water
Asphalt mix: used for road construction, made of asphalt cement, aggregates, and filler materials
Different types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement sets quickly and is used in projects with tight deadlines.
Low heat cement generates less heat during hydration and is used in large concrete structure
Maths , econ and construction
Safety officers are responsible for ensuring the safety of employees and the workplace.
Develop and implement safety policies and procedures
Conduct safety inspections and audits
Train employees on safety practices and procedures
Investigate accidents and incidents
Maintain safety records and reports
Ensure compliance with safety regulations and standards
N B Constructions interview questions for popular designations
Top trending discussions
I applied via Naukri.com
Channel sales management involves managing relationships with third-party partners to sell products or services.
Involves working with distributors, resellers, and other partners to reach customers
Requires setting goals, providing support, and monitoring performance of channel partners
Examples include companies like Apple working with authorized retailers to sell iPhones
Our distributor is XYZ Company and our channel partners include ABC Corp and DEF Inc.
Distributor: XYZ Company
Channel partners: ABC Corp, DEF Inc
Distributor is responsible for distributing our products to various channel partners
Channel partners help in reaching our products to end customers
Maintaining good relationships with distributor and channel partners is crucial for business success
It is difficult to predict the exact amount of business that can be generated in a year as it depends on various factors.
The amount of business generated in a year can vary based on market conditions, competition, economic factors, and company performance.
Factors such as marketing strategies, product quality, customer service, and industry trends can also impact the amount of business generated.
For example, a new produ...
I am a passionate and dedicated individual with a background in marketing and a love for creative writing.
Background in marketing
Passionate about creative writing
Dedicated individual
I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.
Data entry is the process of entering, updating, or verifying data in a computer system.
Entering data accurately and efficiently
Updating existing data with new information
Verifying data for accuracy and completeness
I have over 3 years of experience in data entry, including entering, verifying, and updating data in various databases.
Proficient in using Microsoft Excel and other data entry software
Accurate and efficient in typing and data entry tasks
Experience in maintaining confidentiality and data integrity
Handled large volumes of data entry tasks with tight deadlines
C is a procedural programming language while C++ is an object-oriented programming language.
C is a procedural programming language, focusing on functions and procedures.
C++ is an object-oriented programming language, allowing for classes, objects, and inheritance.
C does not support classes and objects, while C++ does.
C++ has features like polymorphism, encapsulation, and inheritance which are not present in C.
C++ is an...
I am proficient in using MS Word for data entry tasks.
I am skilled in formatting text, tables, and images in MS Word.
I can create and edit documents, including reports, letters, and spreadsheets.
I am familiar with using templates and styles to maintain consistency in documents.
I am experienced in using features like spell check, track changes, and mail merge.
I am efficient in using keyboard shortcuts to speed up data e
I applied via Referral and was interviewed in Oct 2024. There were 3 interview rounds.
4 easy level questions will be asked basically from arrays and strings.
Assignment will be given after clearing coding round. In my case ELearning Platform project was given and 7 days time was given to complete.
Quantitative reasoning
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
I have worked on projects involving website redesign, mobile app design, and user research.
Redesigned company website to improve user experience and increase conversion rates
Designed mobile app interface for seamless navigation and intuitive user interactions
Conducted user research to gather feedback and make data-driven design decisions
My favorite apps are Instagram for its user-friendly interface and engaging content, Spotify for its personalized music recommendations, and Google Maps for its accurate navigation features.
Instagram - user-friendly interface, engaging content
Spotify - personalized music recommendations
Google Maps - accurate navigation features
In 5 years, I see myself as a seasoned UI/UX designer leading a team of designers, working on innovative projects, and continuously learning and growing in the field.
Leading a team of designers
Working on innovative projects
Continuously learning and growing in the field
posted on 27 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There were 3 interview rounds.
Basically It is a list of 25 questions having mix of Resoning,Aptitude &English. Each Queztion carries 2 marks and also there was a plus point that it doesn't have any negative marks
Interview experience
based on 27 reviews
Rating in categories
Site Engineer
7
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Billing Manager
7
salaries
| ₹7.2 L/yr - ₹11.1 L/yr |
Safety Officer
6
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Engineer
5
salaries
| ₹4.3 L/yr - ₹6.1 L/yr |
Civil Site Engineer
5
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Huawei Technologies
Z X Learning
Evision Technoserve
Cogoport