Upload Button Icon Add office photos

Filter interviews by

N B Constructions Contracts Billing Manager Interview Questions, Process, and Tips

Updated 11 Dec 2024

N B Constructions Contracts Billing Manager Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(6 Questions)

  • Q1. What is the CAR policy
  • Ans. 

    The CAR policy refers to the policy regarding the use of company-owned vehicles.

    • CAR stands for Company Automobile Reimbursement

    • The policy outlines guidelines for the use of company vehicles, including maintenance, insurance, and reporting procedures

    • Employees may be required to follow specific rules such as keeping mileage logs or obtaining approval for personal use of company vehicles

  • Answered by AI
  • Q2. What is the NP2 pipe
  • Ans. 

    An NP2 pipe is a type of reinforced concrete pipe commonly used in drainage systems.

    • NP2 pipes are made of reinforced concrete, making them strong and durable.

    • They are commonly used in drainage systems to transport water and sewage.

    • NP2 pipes come in various sizes and lengths to accommodate different project needs.

  • Answered by AI
  • Q3. What is the shuttering factor of per sft total build up area in residential building
  • Ans. 

    The shuttering factor is the percentage of total build up area that is covered by formwork during construction.

    • Shuttering factor is typically around 0.05 to 0.1 for residential buildings.

    • It is used to calculate the quantity of formwork needed for construction.

    • For example, if the total build up area is 1000 sqft and the shuttering factor is 0.1, then 100 sqft of formwork will be required.

  • Answered by AI
  • Q4. What is the BOCW act
  • Ans. 

    The BOCW Act stands for Building and Other Construction Workers Act, which aims to regulate the employment and working conditions of construction workers in India.

    • The BOCW Act was enacted in 1996 to ensure the welfare of construction workers and regulate their working conditions.

    • It requires employers to register construction workers, provide them with safety equipment, and ensure timely payment of wages.

    • The Act also ma...

  • Answered by AI
  • Q5. How much maximum quantity of flyash mix in M25 concrete
  • Ans. 

    The maximum quantity of fly ash in M25 concrete is typically around 25% of the total cementitious material content.

    • Fly ash is commonly used as a partial replacement for cement in concrete mixes to improve workability, durability, and reduce environmental impact.

    • In M25 concrete, the maximum recommended percentage of fly ash is usually around 25% of the total cementitious material content.

    • Using fly ash in concrete mixes ...

  • Answered by AI
  • Q6. What is the difference of pop and gypsum plaster
  • Ans. 

    Pop and gypsum plaster are both types of plaster used in construction, but they have different compositions and properties.

    • Pop (plaster of Paris) is made from gypsum, while gypsum plaster is made from calcium sulfate dihydrate.

    • Pop sets quickly and is commonly used for small repairs and crafts, while gypsum plaster sets more slowly and is used for larger construction projects.

    • Gypsum plaster is more durable and has bette...

  • Answered by AI

N B Constructions Interview FAQs

How many rounds are there in N B Constructions Contracts Billing Manager interview?
N B Constructions interview process usually has 1 rounds. The most common rounds in the N B Constructions interview process are One-on-one Round.
What are the top questions asked in N B Constructions Contracts Billing Manager interview?

Some of the top questions asked at the N B Constructions Contracts Billing Manager interview -

  1. what is the shuttering factor of per sft total build up area in residential bui...read more
  2. how much maximum quantity of flyash mix in M25 concr...read more
  3. what is the difference of pop and gypsum plas...read more

Tell us how to improve this page.

N B Constructions Contracts Billing Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

AmbitionBox Interview Questions
4.9
 • 144 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 96 Interviews
HyScaler Interview Questions
4.5
 • 90 Interviews
CapitalOne Interview Questions
3.8
 • 78 Interviews
3 Minds Digital Interview Questions
4.4
 • 64 Interviews
View all
Site Engineer
7 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Billing Manager
7 salaries
unlock blur

₹7.2 L/yr - ₹11.1 L/yr

Safety Officer
6 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Senior Engineer
5 salaries
unlock blur

₹4.3 L/yr - ₹6.1 L/yr

Civil Site Engineer
5 salaries
unlock blur

₹2 L/yr - ₹4.4 L/yr

Explore more salaries
Compare N B Constructions with

Huawei Technologies

4.0
Compare

Z X Learning

4.5
Compare

Evision Technoserve

4.8
Compare

Cogoport

2.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview