Filter interviews by
The CAR policy refers to the policy regarding the use of company-owned vehicles.
CAR stands for Company Automobile Reimbursement
The policy outlines guidelines for the use of company vehicles, including maintenance, insurance, and reporting procedures
Employees may be required to follow specific rules such as keeping mileage logs or obtaining approval for personal use of company vehicles
An NP2 pipe is a type of reinforced concrete pipe commonly used in drainage systems.
NP2 pipes are made of reinforced concrete, making them strong and durable.
They are commonly used in drainage systems to transport water and sewage.
NP2 pipes come in various sizes and lengths to accommodate different project needs.
The shuttering factor is the percentage of total build up area that is covered by formwork during construction.
Shuttering factor is typically around 0.05 to 0.1 for residential buildings.
It is used to calculate the quantity of formwork needed for construction.
For example, if the total build up area is 1000 sqft and the shuttering factor is 0.1, then 100 sqft of formwork will be required.
The BOCW Act stands for Building and Other Construction Workers Act, which aims to regulate the employment and working conditions of construction workers in India.
The BOCW Act was enacted in 1996 to ensure the welfare of construction workers and regulate their working conditions.
It requires employers to register construction workers, provide them with safety equipment, and ensure timely payment of wages.
The Act also ma...
The maximum quantity of fly ash in M25 concrete is typically around 25% of the total cementitious material content.
Fly ash is commonly used as a partial replacement for cement in concrete mixes to improve workability, durability, and reduce environmental impact.
In M25 concrete, the maximum recommended percentage of fly ash is usually around 25% of the total cementitious material content.
Using fly ash in concrete mixes ...
Pop and gypsum plaster are both types of plaster used in construction, but they have different compositions and properties.
Pop (plaster of Paris) is made from gypsum, while gypsum plaster is made from calcium sulfate dihydrate.
Pop sets quickly and is commonly used for small repairs and crafts, while gypsum plaster sets more slowly and is used for larger construction projects.
Gypsum plaster is more durable and has bette...
I was interviewed before May 2016.
I was interviewed in Jul 2017.
I was interviewed in Jul 2017.
Yes, I am a fresher with no past working experience.
I am a recent graduate looking to gain experience in the field.
I have completed internships or projects during my studies.
I am eager to learn and grow in a professional environment.
I was responsible for conducting market research, creating social media content, and assisting with event planning.
Conducted market research to identify trends and opportunities
Created engaging social media content to increase brand awareness
Assisted in planning and executing events to promote company products/services
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
Experience with programming languages such as Java, Python, and C++
I applied via Approached by Company and was interviewed in Jul 2017. There were 5 interview rounds.
I applied via Other and was interviewed in Jan 2018. There were 5 interview rounds.
I applied via Other and was interviewed in Jan 2018. There were 5 interview rounds.
I was interviewed in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
posted on 3 May 2017
I was interviewed before May 2016.
Some of the top questions asked at the N B Constructions Contracts Billing Manager interview -
based on 1 interview
Interview experience
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Huawei Technologies
Z X Learning
Evision Technoserve
Cogoport