i
Mkc Infrastructure
Filter interviews by
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.
Total station data can be converted into AutoCAD by exporting the data in a compatible format and importing it into AutoCAD.
Export the total station data in a compatible format such as CSV or DXF.
Open AutoCAD and import the exported data file.
Adjust the scale and orientation of the imported data as needed.
Use AutoCAD tools to further manipulate and analyze the imported total station data.
Save the AutoCAD file with the ...
The total station list count refers to the number of total stations available for surveying purposes.
The total station list count can vary depending on the specific surveying project or area.
It is important to have a sufficient number of total stations to efficiently conduct surveys.
For example, a large construction project may require a higher total station list count compared to a smaller land surveying project.
The auto level list count varies depending on the specific surveying project and equipment used.
Auto level list count can range from a few dozen to hundreds depending on the size of the project.
The count may also be influenced by the number of surveying points and the level of detail required.
For example, a small residential survey may have around 50 auto level lists, while a large construction project may have over 20
posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
posted on 22 Mar 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 27 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I am from New York and I have 10 years of experience as a Senior Surveyor.
I am originally from New York.
I have 10 years of experience as a Senior Surveyor.
I have worked on various projects across the state.
I am familiar with the local regulations and requirements.
I have successfully completed complex surveys in urban and rural areas.
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
based on 4 reviews
Rating in categories
Executive Accountant
32
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Junior Engineer
30
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Senior Engineer
27
salaries
| ₹4 L/yr - ₹7.8 L/yr |
Highway Engineer
26
salaries
| ₹1.9 L/yr - ₹4.9 L/yr |
Civil Site Engineer
23
salaries
| ₹1.4 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group