Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Mkc Infrastructure Team. If you also belong to the team, you can get access from here

Mkc Infrastructure Verified Tick

Compare button icon Compare button icon Compare
3.6

based on 286 Reviews

Filter interviews by

Mkc Infrastructure Surveyor Interview Questions and Answers

Updated 2 Dec 2023

Mkc Infrastructure Surveyor Interview Experiences

1 interview found

Surveyor Interview Questions & Answers

user image Anonymous

posted on 2 Dec 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Eske pahle aap kaun se company me Kam kar rahe the?
  • Ans. PNC INFRATECH LTD Delhi to Baroda expressway pkg 31
  • Answered Anonymously
  • Q2. Kya company aapko jahan bhejegi wahan kaam karne jaoge?
  • Q3. Kya aapko company jahan bhejengi wahan jaoge kaam karne?
  • Q4. Kya aap wine pite Hain
  • Q5. Aapke wahan hr kaun tha?
  • Q6. Mr amresh tripathi
Round 3 - Technical 

(6 Questions)

  • Q1. Kya aap survey ka kaam kar lete hain?
  • Q2. Aapko auto level aur total machin chalana aata hai?
  • Q3. Kya aapko auto cad aata hai?
  • Ans. Nahi abhi Mera learning chal Raha hai learn vern se
  • Answered Anonymously
  • Q4. Aapko center line mark karne ke liye kitne station point ki jarurat hai?
  • Ans. 3 three do se machin set hoga aur teesre se checking ke liye.
  • Answered Anonymously
  • Q5. Kya aapko area calculation aata hai
  • Q6. Kya aap layout marking kar sakte hain?

Interview Preparation Tips

Interview preparation tips for other job seekers - Aap interview ke liye confidence se jayen aur sabhi sawalon ke uttar twarit aur sahi den Jo kaam nahi aata ho uske liye jhuth na bolen. Imandari purvak jawab den baaton ko jyada ghuma ke nahi karen. Seedha aur sathik uttar den. Hadbadaye nahi. Dhanywad

Surveyor Jobs at Mkc Infrastructure

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Route survey, Details survey etc.
  • Q2. Salary discussions

Interview Preparation Tips

Topics to prepare for L&T Construction Surveyor interview:
  • Field Survey
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Survey related , AutoCAD drawing related, project management else
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion, else

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Job profile background.
  • Q2. Why I want to left current company?
  • Q3. About salary structure and CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Always read about company and project details before Interview.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
-

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Which using total station company
  • Q2. Auto cad drawing superimposed
  • Q3. How to convert total station data into auto cad.
  • Ans. 

    Total station data can be converted into AutoCAD by exporting the data in a compatible format and importing it into AutoCAD.

    • Export the total station data in a compatible format such as CSV or DXF.

    • Open AutoCAD and import the exported data file.

    • Adjust the scale and orientation of the imported data as needed.

    • Use AutoCAD tools to further manipulate and analyze the imported total station data.

    • Save the AutoCAD file with the ...

  • Answered by AI
  • Q4. How much total station list count.
  • Ans. 

    The total station list count refers to the number of total stations available for surveying purposes.

    • The total station list count can vary depending on the specific surveying project or area.

    • It is important to have a sufficient number of total stations to efficiently conduct surveys.

    • For example, a large construction project may require a higher total station list count compared to a smaller land surveying project.

  • Answered by AI
  • Q5. How much auto level list count.
  • Ans. 

    The auto level list count varies depending on the specific surveying project and equipment used.

    • Auto level list count can range from a few dozen to hundreds depending on the size of the project.

    • The count may also be influenced by the number of surveying points and the level of detail required.

    • For example, a small residential survey may have around 50 auto level lists, while a large construction project may have over 20

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hobbies, strength, weakness, attitude

Interview Questionnaire 

1 Question

  • Q1. Survey releted all type question

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test..
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your exact responsibility in your organization?
  • Q2. What are your additional qualities?
  • Q3. AutoCAD, Excel, Friendly with all types of docs , Even the Contract Documents also
  • Ans. Maintain good relationship with Clients on the basis of my performance.
  • Answered by Atul anand
Round 2 - Technical 

(6 Questions)

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Ans. 

    The work procedure in our organization for RA Bill preparation involves several steps.

    • Gathering all relevant project documents and information

    • Analyzing the project scope and specifications

    • Measuring and quantifying the work done on-site

    • Preparing detailed rate analysis for each item of work

    • Calculating the quantities and rates for each item

    • Preparing the bill of quantities (BOQ)

    • Cross-checking the BOQ with the project speci...

  • Answered by AI
  • Q2. Explain about the different types of bills you know about.
  • Ans. 

    Different types of bills in quantity surveying

    • Measurement bill: It includes the detailed measurements of various items of work.

    • Abstract bill: It provides a summary of all the measurements and quantities of work done.

    • Cost bill: It includes the cost of each item of work and the total cost of the project.

    • Final bill: It is the final settlement bill after completion of the project.

    • Interim bill: It is prepared at regular int...

  • Answered by AI
  • Q3. Tell me about the importance of contact documents in any type of bill prepation.
  • Ans. 

    Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.

    • Contact documents define the legal agreement between the parties involved in a construction project.

    • They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.

    • Contact documents provide clarity...

  • Answered by AI
  • Q4. How reconciliation performed?
  • Ans. 

    Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.

    • Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.

    • The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.

    • Reconciliation can be performed manually or using softw...

  • Answered by AI
  • Q5. What are the client instructions in your current project about document controlling?
  • Ans. As according to client, we have prepare and submit all the prepour and postpour docs with all test certificate if any even in mechanical or civil works before submission of Monthly RA bill.
  • Answered by Atul anand
  • Q6. Do you know AutoCAD & Excel well ?
  • Ans. 

    Yes, I am proficient in AutoCAD and Excel.

    • I have extensive experience using AutoCAD for creating and editing technical drawings.

    • I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.

    • I have successfully completed projects where I utilized both AutoCAD and Excel.

    • I am familiar with the various features and functions of both software.

    • I can efficiently generate quantity take-offs and cost es

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating yourself as according to Employer demands and market requirements and Always be honest to your interview that helps in your progress also.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical question related to my job profile
  • Q2. I answered well as per my knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Please mentioned your actual knowledge and experience in CV. Also mentioned correct CTC in CV.

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Telephonic interview by HR
  • Q2. Where are you from how much experience ?
  • Ans. 

    I am from New York and I have 10 years of experience as a Senior Surveyor.

    • I am originally from New York.

    • I have 10 years of experience as a Senior Surveyor.

    • I have worked on various projects across the state.

    • I am familiar with the local regulations and requirements.

    • I have successfully completed complex surveys in urban and rural areas.

  • Answered by AI
  • Q3. I'm from Jharkhand and experience was 7 years

Interview Preparation Tips

Topics to prepare for Simplex Infrastructures Senior Surveyor interview:
  • travesing
Interview preparation tips for other job seekers - Experience teach better join work and enjoy work for internship
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Simple game style interview

Round 2 - One-on-one 

(1 Question)

  • Q1. What made you apply for this junior qs role?

Mkc Infrastructure Interview FAQs

How many rounds are there in Mkc Infrastructure Surveyor interview?
Mkc Infrastructure interview process usually has 3 rounds. The most common rounds in the Mkc Infrastructure interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Mkc Infrastructure Surveyor interview?

Some of the top questions asked at the Mkc Infrastructure Surveyor interview -

  1. Eske pahle aap kaun se company me Kam kar rahe t...read more
  2. Aapko center line mark karne ke liye kitne station point ki jarurat h...read more
  3. Kya company aapko jahan bhejegi wahan kaam karne jao...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Mkc Infrastructure interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Mkc Infrastructure Surveyor Salary
based on 9 salaries
₹2.8 L/yr - ₹4.2 L/yr
14% less than the average Surveyor Salary in India
View more details

Mkc Infrastructure Surveyor Reviews and Ratings

based on 4 reviews

4.5/5

Rating in categories

4.3

Skill development

4.5

Work-Life balance

3.7

Salary & Benefits

4.3

Job Security

4.5

Company culture

4.0

Promotions/Appraisal

4.3

Work Satisfaction

Explore 4 Reviews and Ratings
Sr. Surveyors / Surveyors

Gandhinagar

3-8 Yrs

Not Disclosed

Explore more jobs
Executive Accountant
32 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Senior Engineer
27 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Highway Engineer
26 salaries
unlock blur

₹1.9 L/yr - ₹4.9 L/yr

Civil Site Engineer
23 salaries
unlock blur

₹1.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Mkc Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview