Upload Button Icon Add office photos

Filter interviews by

Ahluwalia Contracts India Surveyor Interview Questions and Answers

Updated 26 Sep 2024

Ahluwalia Contracts India Surveyor Interview Experiences

1 interview found

Surveyor Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
-

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Which using total station company
  • Q2. Auto cad drawing superimposed
  • Q3. How to convert total station data into auto cad.
  • Ans. 

    Total station data can be converted into AutoCAD by exporting the data in a compatible format and importing it into AutoCAD.

    • Export the total station data in a compatible format such as CSV or DXF.

    • Open AutoCAD and import the exported data file.

    • Adjust the scale and orientation of the imported data as needed.

    • Use AutoCAD tools to further manipulate and analyze the imported total station data.

    • Save the AutoCAD file with the ...

  • Answered by AI
  • Q4. How much total station list count.
  • Ans. 

    The total station list count refers to the number of total stations available for surveying purposes.

    • The total station list count can vary depending on the specific surveying project or area.

    • It is important to have a sufficient number of total stations to efficiently conduct surveys.

    • For example, a large construction project may require a higher total station list count compared to a smaller land surveying project.

  • Answered by AI
  • Q5. How much auto level list count.
  • Ans. 

    The auto level list count varies depending on the specific surveying project and equipment used.

    • Auto level list count can range from a few dozen to hundreds depending on the size of the project.

    • The count may also be influenced by the number of surveying points and the level of detail required.

    • For example, a small residential survey may have around 50 auto level lists, while a large construction project may have over 20

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hobbies, strength, weakness, attitude

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Aptitude Test 

Survey
Auto Level, Total Stesan, DGPS

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Degital auto level questions
  • Q2. Estimate and costing
  • Q3. Cube test related questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Who is called a surveyor
  • Ans. 

    A surveyor is a professional who measures and maps land, buildings, and other physical features.

    • Surveyors use specialized equipment like total stations and GPS to accurately measure distances and angles.

    • They create maps, boundary lines, and legal descriptions of properties.

    • Surveyors work in various industries including construction, engineering, and real estate.

    • They play a crucial role in land development projects, ens...

  • Answered by AI
  • Q2. What is the purpose of surveying
  • Ans. 

    Surveying is the process of determining the relative positions of points on the Earth's surface for mapping and construction purposes.

    • Surveying helps in creating accurate maps and plans for construction projects.

    • It is used to establish property boundaries and land ownership.

    • Surveying is essential for infrastructure development such as roads, bridges, and buildings.

    • It also plays a crucial role in disaster management and...

  • Answered by AI
  • Q3. To collect field data so a map or plan can be prepared based on the calculations of the field parameters before an engineering operation is actually executed to begin a construction project
  • Q4. What is another name for surveyor
  • Ans. 

    A synonym for surveyor is land surveyor, a professional who measures and maps the land for various purposes.

    • Land surveyor is a common alternative term for surveyor

    • Surveyors use specialized equipment like total stations and GPS to accurately measure land

    • Surveyors work in various industries such as construction, real estate, and urban planning

  • Answered by AI
  • Q5. What is the principal of surveying
  • Ans. 

    The principal of surveying involves accurately measuring and mapping the land and its features.

    • Surveying involves determining the relative positions of points on the Earth's surface.

    • It includes measuring distances, angles, and elevations to create maps and plans.

    • Surveying is essential for construction, engineering, and land development projects.

    • Modern surveying techniques use advanced technology like GPS and drones.

    • Err...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Calculate a level sheet, how to prepare a level greed sheet for highway

Interview Preparation Tips

Interview preparation tips for other job seekers - Flow in level calculation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Route survey, Details survey etc.
  • Q2. Salary discussions

Interview Preparation Tips

Topics to prepare for L&T Construction Surveyor interview:
  • Field Survey
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Survey related , AutoCAD drawing related, project management else
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion, else

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is superelevation ?
  • Ans. 

    Superelevation is the banking of a road or railway track on a curve to counteract the centrifugal force.

    • It is the inward slope of a road or railway track on a curve.

    • It helps to counteract the centrifugal force that tends to pull a vehicle or train off the track.

    • The amount of superelevation required depends on the speed of the vehicle or train and the radius of the curve.

    • Superelevation is usually expressed as a percenta...

  • Answered by AI
  • Q2. What is radius curve ?
  • Ans. 

    A radius curve is a section of a road or railway track that curves gradually in a circular shape.

    • Radius curves are used to allow vehicles or trains to change direction smoothly.

    • The radius of a curve is determined by the degree of the curve and the speed limit of the road or track.

    • Radius curves can be found on highways, railways, and even roller coasters.

    • A larger radius curve allows for higher speeds, while a smaller ra...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - I am search new job.
This day Very important for me .

Interview Questionnaire 

2 Questions

  • Q1. I asked you can survey on the field
  • Q2. Yas can i survey
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Working purpose , technical specifications, related work
  • Q2. Why are you choosing department
  • Q3. About handling instruments
  • Q4. Handling your position
  • Q5. What's your best platform

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Knowledge

Ahluwalia Contracts India Interview FAQs

How many rounds are there in Ahluwalia Contracts India Surveyor interview?
Ahluwalia Contracts India interview process usually has 1 rounds. The most common rounds in the Ahluwalia Contracts India interview process are Technical.
How to prepare for Ahluwalia Contracts India Surveyor interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ahluwalia Contracts India. The most common topics and skills that interviewers at Ahluwalia Contracts India expect are Assurance, Auto Level, Building Construction, Excavation and Fiber Splicing.
What are the top questions asked in Ahluwalia Contracts India Surveyor interview?

Some of the top questions asked at the Ahluwalia Contracts India Surveyor interview -

  1. How to convert total station data into auto c...read more
  2. How much total station list cou...read more
  3. How much auto level list cou...read more

Tell us how to improve this page.

Ahluwalia Contracts India Surveyor Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Ahluwalia Contracts India Surveyor Salary
based on 5 salaries
₹4.1 L/yr - ₹6 L/yr
At par with the average Surveyor Salary in India
View more details

Ahluwalia Contracts India Surveyor Reviews and Ratings

based on 3 reviews

3.8/5

Rating in categories

3.0

Skill development

3.4

Work-life balance

4.0

Salary

2.8

Job security

3.4

Company culture

3.8

Promotions

3.0

Work satisfaction

Explore 3 Reviews and Ratings
Civil Engineer
110 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Senior Engineer
108 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Site Engineer
91 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Civil Site Engineer
81 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Engineer
69 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Ahluwalia Contracts India with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview