i
MBL Infrastructure Limited
Filter interviews by
Hot mix plant Apolo Amman Details.
The Paver 1800-2 is equipped with a powerful engine designed for heavy-duty paving operations.
The Paver 1800-2 is powered by a diesel engine for efficient performance.
The engine has a displacement of X cubic inches, providing ample power for paving tasks.
It features a turbocharger for increased power output and fuel efficiency.
The engine is designed to meet emission standards and reduce environmental impact.
Regular mai...
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 3 interview rounds.
Timely material gate in and prepare the min in system
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Mining equipments working experience
MBL Infrastructure Limited interview questions for popular designations
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Centrifugal pumps and positive displacement pumps are commonly used in heavy machinery.
Centrifugal pumps are used for high flow rates and low viscosity fluids.
Positive displacement pumps are used for high pressure and viscous fluids.
Examples of centrifugal pumps include end suction pumps and split case pumps.
Examples of positive displacement pumps include gear pumps and screw pumps.
I applied via Naukri.com
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
Material is received through purchase orders and issued based on requisitions.
Receive material through purchase orders and inspect for quality and quantity
Store material in designated locations based on type and characteristics
Issue material based on requisitions and maintain accurate records
Ensure proper documentation and authorization for all material transactions
Implement FIFO (First In First Out) method to avoid ma
Daily stock reporting to head office involves collecting and analyzing data on stock levels, sales, and inventory movements to provide accurate and timely reports.
Collect data on stock levels, sales, and inventory movements
Use inventory management software or spreadsheets to record and track stock
Analyze data to identify trends, patterns, and discrepancies
Prepare daily stock reports summarizing stock levels, sales, and...
Raw materials are received by following a systematic process that includes inspection, documentation, and storage.
Inspect the received raw materials for quality and quantity
Check the accompanying documentation such as purchase orders and invoices
Verify that the received materials match the specifications mentioned in the documentation
Record the details of the received materials in the inventory management system
Store t...
Lubricant received and consumption can be managed by implementing proper inventory control and monitoring systems.
Maintain a record of lubricant received and consumed
Regularly monitor the lubricant inventory levels
Implement a system to track lubricant usage and consumption
Ensure proper storage and handling of lubricants to prevent wastage
Analyze lubricant consumption patterns to forecast future needs
Establish a reorder...
To see the expiry date of cement, check the packaging label or the bag itself.
Check the packaging label for the expiry date.
Look for a printed or stamped date on the bag.
Expiry date is usually mentioned as 'Use by' or 'Best before' date.
If no expiry date is found, contact the manufacturer for information.
Top trending discussions
Interview experience
based on 179 reviews
Rating in categories
Accountant
17
salaries
| ₹3 L/yr - ₹6 L/yr |
Office Assistant
10
salaries
| ₹1.1 L/yr - ₹2 L/yr |
Computer Operator
10
salaries
| ₹1.6 L/yr - ₹2 L/yr |
Store Keeper
10
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Shift Incharge
8
salaries
| ₹2.6 L/yr - ₹4 L/yr |
Nagarjuna Construction Company
Ashoka Buildcon
IRB Infrastructure
Simplex Infrastructures