i
MBL Infrastructure Limited
Filter interviews by
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
Material is received through purchase orders and issued based on requisitions.
Receive material through purchase orders and inspect for quality and quantity
Store material in designated locations based on type and characteristics
Issue material based on requisitions and maintain accurate records
Ensure proper documentation and authorization for all material transactions
Implement FIFO (First In First Out) method to avoid ma
Daily stock reporting to head office involves collecting and analyzing data on stock levels, sales, and inventory movements to provide accurate and timely reports.
Collect data on stock levels, sales, and inventory movements
Use inventory management software or spreadsheets to record and track stock
Analyze data to identify trends, patterns, and discrepancies
Prepare daily stock reports summarizing stock levels, sales, and...
Raw materials are received by following a systematic process that includes inspection, documentation, and storage.
Inspect the received raw materials for quality and quantity
Check the accompanying documentation such as purchase orders and invoices
Verify that the received materials match the specifications mentioned in the documentation
Record the details of the received materials in the inventory management system
Store t...
Lubricant received and consumption can be managed by implementing proper inventory control and monitoring systems.
Maintain a record of lubricant received and consumed
Regularly monitor the lubricant inventory levels
Implement a system to track lubricant usage and consumption
Ensure proper storage and handling of lubricants to prevent wastage
Analyze lubricant consumption patterns to forecast future needs
Establish a reorder...
To see the expiry date of cement, check the packaging label or the bag itself.
Check the packaging label for the expiry date.
Look for a printed or stamped date on the bag.
Expiry date is usually mentioned as 'Use by' or 'Best before' date.
If no expiry date is found, contact the manufacturer for information.
Top trending discussions
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
Accountant
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Office Assistant
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Computer Operator
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Keeper
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Incharge
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Nagarjuna Construction Company
Ashoka Buildcon
IRB Infrastructure
Simplex Infrastructures