i
Filter interviews by
posted on 13 Dec 2023
The scope of the project is to streamline billing and planning processes for the Assistant Manager role.
Develop and implement efficient billing procedures
Create and maintain billing schedules
Ensure accurate and timely invoicing
Collaborate with cross-functional teams to optimize planning strategies
Identify and resolve billing discrepancies
Analyze data to identify areas for improvement
Implement cost-saving measures
Train ...
I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.
GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.
GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.
It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.
For example, if the GSB tolerance for compa...
Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.
Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.
Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.
The process may include activities such as regrading, compacting the soil, re...
I applied via LinkedIn and was interviewed before Dec 2022. There were 4 interview rounds.
Topics on AI vs CHRO in 2024
Extended hours of work in construction field by an woman workman - describe precautionary measure, Legality/statutory provisions
Implementing a Performance Management System (PMS) for a start-up.
Understand the organization's goals and objectives
Define clear performance metrics and expectations
Select a suitable PMS software or tool
Train managers and employees on using the PMS
Regularly monitor and evaluate performance
Provide feedback and coaching to improve performance
Use performance data for decision-making and rewards
Continuously improve the PMS
I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.
Barbrik Project Limited (PRA Group) interview questions for popular designations
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Effective management of plants and machinery is crucial for efficient logistics operations.
Regular maintenance and inspections to ensure optimal performance and prevent breakdowns
Investing in modern and efficient equipment to improve productivity
Implementing a system for tracking and scheduling maintenance and repairs
Training staff on proper use and maintenance of equipment
Monitoring equipment usage and performance to ...
Regular maintenance of plants and earthmoving equipment is crucial for ensuring their optimal performance and longevity.
Create a maintenance schedule and stick to it
Perform regular inspections to identify any issues before they become major problems
Keep a record of all maintenance activities and repairs
Train employees on proper use and maintenance of equipment
Invest in high-quality equipment and parts
Consider outsourci...
Get interview-ready with Top Barbrik Project Limited (PRA Group) Interview Questions
Clutches are devices used to transmit power from one component to another. There are several types of clutches.
Friction clutch
Electromagnetic clutch
Hydraulic clutch
Centrifugal clutch
Dog clutch
Cone clutch
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
Answering questions related to QA QC Engineer position
If material is purchased from any factory, I will ensure that it meets the required specifications and standards
I can work for 8-10 hours a day depending on the workload
I am familiar with plant calibration procedures and can perform them
The borrow area will be selected based on factors such as soil type, distance from the construction site, and availability
I manage ...
I applied via Walk-in and was interviewed in Nov 2019. There was 1 interview round.
Top trending discussions
posted on 1 Dec 2024
I applied via AmbitionBox and was interviewed in Nov 2024. There were 4 interview rounds.
Management is fully supported in the department, providing resources and guidance to ensure success.
Management provides clear goals and expectations for the team
Regular check-ins and feedback sessions are conducted to support employee growth
Resources such as training programs and tools are readily available for employees
Management encourages open communication and collaboration among team members
based on 178 reviews
Rating in categories
Assistant Manager
13
salaries
| ₹2.7 L/yr - ₹10 L/yr |
Senior Engineer
9
salaries
| ₹5.4 L/yr - ₹10.2 L/yr |
HR Officer
8
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Junior Engineer Civil
7
salaries
| ₹2.4 L/yr - ₹2.8 L/yr |
Asst Store
7
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
Shapoorji Pallonji Group