Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Barbrik Project Limited (PRA Group) Team. If you also belong to the team, you can get access from here

Barbrik Project Limited (PRA Group) Verified Tick

Compare button icon Compare button icon Compare
4.3

based on 180 Reviews

Filter interviews by

Barbrik Project Limited (PRA Group) Highway Engineer Interview Questions and Answers

Updated 9 Jul 2021

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Machinery,Staf&Public sefy,Only Used Required Materials But Not Work Place Materials Besttege ets.
  • Q2. Sub.top,gsb,wmm,dlc, pqc,dbm,bc,curb, drain, w-metalbim,rfi, level sheet, billing, ets.

Interview Preparation Tips

Interview preparation tips for other job seekers - I Hereby Declare That The Above Mentioned Details Are True To The Best Of My Knowledge.

I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How much quantity 1 roller can compact in one day?
  • Ans. 

    The quantity of material a roller can compact in one day depends on various factors.

    • The type and size of the roller will affect its compaction capacity.

    • The type and condition of the material being compacted will also impact the quantity that can be compacted.

    • The speed and efficiency of the operator operating the roller can influence the daily compaction quantity.

    • Environmental factors such as weather conditions and terr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - See there are lots of questions relating to highway construction. But the interviewers mostly focus on your ability to handle pressure, your basic knowledge about execution process like if you have to lay GSB, WMM or DBM etc then what will be your prior preparations and what all the equipment you'll need for your particular work? Also what will you do if you do not achieve your goal ( like quantity) for the day? Engineering Properties of Soil, GSB, WMM, DLC, PQC, DBM, BC, Bitumen, Cement etc. Test done at site as well as in laboratory. Quantity required for particular work.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(1 Question)

  • Q1. Present company working
Round 2 - Technical 

(1 Question)

  • Q1. Jeo textile microns
Round 3 - HR 

(1 Question)

  • Q1. How much salery present work company
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Highway cross section
Round 3 - HR 

(1 Question)

  • Q1. Current CTC also expected CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Finally experience, educational certificate checking.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Your Total Experience
  • Ans. 

    I have 10 years of experience in highway engineering.

    • I have worked on various highway projects including design, construction, and maintenance.

    • I have experience in managing teams and coordinating with clients and stakeholders.

    • I have knowledge of relevant software and regulations such as AutoCAD and AASHTO standards.

    • I have also conducted research and analysis on traffic flow and safety measures.

    • Overall, my experience ha...

  • Answered by AI
  • Q2. Why you want to leave your current organisation
  • Ans. 

    Looking for new challenges and opportunities to grow professionally.

    • Seeking a more challenging role

    • Desire to work on larger projects

    • Opportunity for professional growth

    • Company culture not aligned with personal values

    • Lack of job security or stability

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. Tell me about PQC , DLC , GSB
  • Ans. 

    PQC, DLC, and GSB are all types of road construction materials.

    • PQC stands for Pavement Quality Concrete and is a type of concrete used for road surfaces.

    • DLC stands for Dry Lean Concrete and is a type of concrete used as a base layer for road construction.

    • GSB stands for Granular Sub Base and is a layer of compacted granular material used as a foundation for road construction.

    • All three materials are commonly used in road...

  • Answered by AI
  • Q2. Tell Me about GSB Gradation
  • Ans. 

    GSB Gradation is a method of grading aggregates used in road construction.

    • GSB stands for Granular Sub-Base.

    • It is a method of grading aggregates based on their particle size.

    • The gradation is important for ensuring proper compaction and stability of the road.

    • The gradation is specified in terms of percentage passing different sieve sizes.

    • For example, GSB 20 gradation means that 100% of the aggregates pass through a 20mm s

  • Answered by AI
  • Q3. Rigid and Flexible Pavement difference
  • Ans. 

    Rigid pavements are made of concrete while flexible pavements are made of asphalt.

    • Rigid pavements have high flexural strength and low deflection while flexible pavements have low flexural strength and high deflection.

    • Rigid pavements are more durable and have a longer lifespan than flexible pavements.

    • Flexible pavements are easier and cheaper to construct and maintain than rigid pavements.

    • Examples of rigid pavements incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company in Highway Execution.

I applied via Company Website

Interview Questionnaire 

1 Question

  • Q1. Do you have knowledge related IS 456, IS 516?
  • Ans. 

    Yes, I have knowledge related to IS 456 and IS 516.

    • IS 456 is the code of practice for plain and reinforced concrete in construction.

    • IS 516 is the method of tests for strength of concrete.

    • I am familiar with the requirements and specifications outlined in both IS 456 and IS 516.

    • I have applied these standards in my previous projects, ensuring the quality and durability of the structures.

  • Answered by AI

I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Telephone questions road work
  • Q2. Telephone questions
  • Q3. Telephone questions
  • Q4. Telephone questions road work

Interview Preparation Tips

Interview preparation tips for other job seekers - Highway

I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How much quantity 1 roller can compact in one day?
  • Ans. 

    The quantity of material a roller can compact in one day depends on various factors.

    • The type and size of the roller will affect its compaction capacity.

    • The type and condition of the material being compacted will also impact the quantity that can be compacted.

    • The speed and efficiency of the operator operating the roller can influence the daily compaction quantity.

    • Environmental factors such as weather conditions and terr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - See there are lots of questions relating to highway construction. But the interviewers mostly focus on your ability to handle pressure, your basic knowledge about execution process like if you have to lay GSB, WMM or DBM etc then what will be your prior preparations and what all the equipment you'll need for your particular work? Also what will you do if you do not achieve your goal ( like quantity) for the day? Engineering Properties of Soil, GSB, WMM, DLC, PQC, DBM, BC, Bitumen, Cement etc. Test done at site as well as in laboratory. Quantity required for particular work.

Interview Questionnaire 

1 Question

  • Q1. Related to Building construction

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good interviews for me

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 723 Interviews
Tata Projects Interview Questions
4.2
 • 416 Interviews
KEC International Interview Questions
4.1
 • 291 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
View all

Barbrik Project Limited (PRA Group) Highway Engineer Reviews and Ratings

based on 3 reviews

4.2/5

Rating in categories

4.2

Skill development

4.5

Work-life balance

3.7

Salary

3.4

Job security

4.0

Company culture

3.7

Promotions

4.3

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
13 salaries
unlock blur

₹2.7 L/yr - ₹10 L/yr

Senior Engineer
9 salaries
unlock blur

₹5.4 L/yr - ₹10.2 L/yr

HR Officer
8 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

Junior Engineer Civil
7 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Asst Store
7 salaries
unlock blur

₹2.2 L/yr - ₹3 L/yr

Explore more salaries
Compare Barbrik Project Limited (PRA Group) with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview